Powered by Google-Search & Google-Books www.ChineseStandard.net Database: 169759 (Apr 11, 2021)
HOME   Quotation   Tax   Examples Standard-List   Contact-Us   View-Cart
  

GB/T 16566-2018 (GBT 16566-2018)

Chinese Standard: 'GB/T 16566-2018'
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)Related StandardStatusGoogle Book
GB/T 16566-2018English659 Add to Cart Days<=5 Terms for railway tunnel GB/T 16566-2018 Valid GB/T 16566-2018
GB/T 16566-2018Chinese29 Add to Cart <=1-day [PDF from Chinese Authority, or Standard Committee, or Publishing House]  

   

BASIC DATA
Standard ID GB/T 16566-2018 (GB/T16566-2018)
Description (Translated English) Terms for railway tunnel
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard S04
Classification of International Standard 01.040.45
Word Count Estimation 38,320
Date of Issue 2018-07-13
Date of Implementation 2019-02-01
Drafting Organization Institute of Railway Construction, China Academy of Railway Sciences, Institute of Standard Metrology, China Academy of Railway Sciences
Administrative Organization National Railway Administration
Proposing organization National Railway Administration
Issuing agency(ies) State Administration of Markets and China National Standardization Administration

GB/T 16566-2018
Terms for railway tunnel
ICS 01.040.45
S04
National Standards of People's Republic of China
Replace GB/T 16566-1996
Railway tunnel voca
Published on.2018-07-13
Implementation of.2019-02-01
State Market Supervisory Administration
China National Standardization Administration issued
Content
Foreword I
1 range 1
2 tunnel general vocabulary 1
3 surrounding rock 3
4 Survey and Design 4
5 Railway tunnel construction method 9
6 Railway tunnel construction machinery 14
7 Tunnel support and lining 16
8 Detection and Monitoring 18
9 Ventilation, lighting, drainage 19
10 Tunnel Operation and Maintenance 21
Index 23
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB/T 16566-1996 "railway tunnel terminology", compared with GB/T 16566-1996, except editorial modification
The technical changes are as follows.
--- Added the term "surrounding rock" (see Chapter 3);
--- Combine the original Chapter 3 "Tunnel Survey" and the original Chapter 4 "Tunnel Design" into Chapter 4 "Reconnaissance and Design" (see Chapter 4,.1996)
Chapters 3 and 4 of the annual edition);
--- Added the term "railway construction machinery" (see Chapter 6);
--- Added the vocabulary related to Chapter 7 "Tunnel Support and Lining" and the vocabulary related to tunnel lining from the original Chapter 4 "Tunnel Design"
Merged into Chapter 7 (see Chapter 7, Chapter 4 of the.1996 edition);
--- Added "test and monitoring" related vocabulary (see Chapter 8);
--- Added words related to "ventilation, lighting, drainage" (see Chapter 9).
This standard is proposed and managed by the National Railway Administration.
This standard was drafted by the Railway Construction Research Institute of China Railway Science Research Institute and the Institute of Standard Metrology of China Railway Science Research Institute.
The main drafters of this standard. Ma Weibin, Ning Yingzhi, Fu Bingxian, Guo Xiaoxiong, Xu Xueliang, Ma Chaofeng, Zou Wenhao, Yan Xin, Niu Yabin, Chang Kai,
Zhao Peng, Li Wei.
The previous versions of the standards replaced by this standard are.
---GB/T 16566-1996.
Railway tunnel voca
1 Scope
This standard defines the basic vocabulary and definition of railway tunnels.
This standard applies to the planning, survey, design, construction, operation, scientific research, teaching and other aspects of railway tunnel engineering. Other underground works can also
Refer to use.
2 general vocabulary of tunnel
2.1
Railway tunnel railwaytunnel
A building constructed underground or under water to lay rails for railway locomotives and implements that can travel on tracks.
2.2
Extra long tunnel extra-longtunnel
A tunnel with a total length of 10,000 m or more.
2.3
Long tunnel longtunnel
A tunnel with a total length of more than 3000m to 10000m.
2.4
Medium and long tunnel mediumlengthtunnel
A tunnel with a total length of 500m to 3000m.
2.5
Short tunnel shortlengthtunnel
Tunnels with a total length of 500m and below.
2.6
Circular tunnel circularshapedtunnel
The excavation section shape is a circular tunnel.
2.7
Horseshoe tunnel horseshoe-shapedtunnel
The shape of the excavation section is formed by a number of arcs or arcs connected to a straight line, which resembles a horseshoe-shaped tunnel.
2.8
Single-track tunnel single-tracktunnel
Lay a tunnel of a line.
2.9
Double-line tunnel double-tracktunnel
A tunnel with two lines.
Related standard: GB/T 36505-2018    GB/T 36543-2018
Related PDF sample: GB/T 21562.2-2015    GB/T 21562.3-2015