Gas turbines -- Procurement -- Part 8: Inspection, testing, installation and commissioning
| Valid |
GB/T 14099.8-2009
|
PDF similar to GB/T 14099.8-2009
Basic data | Standard ID | GB/T 14099.8-2009 (GB/T14099.8-2009) | | Description (Translated English) | Gas turbines -- Procurement -- Part 8: Inspection, testing, installation and commissioning | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K56 | | Classification of International Standard | 27.040 | | Word Count Estimation | 16,148 | | Date of Issue | 2009-04-13 | | Date of Implementation | 2010-01-01 | | Adopted Standard | ISO 3977-8-2002, IDT | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 5, 2009 (No. 145 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the principles and procedures of the system. This section provides a complete and equipment inspection, testing, installation and commissioning guidance. This section outlines the purchaser and turbine manufacturers in the inspection, coordination, reporting and record-keeping duties. |
GB/T 14099.8-2009: Gas turbines -- Procurement -- Part 8: Inspection, testing, installation and commissioning ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Gas turbines Procurement Part 8. Inspection, testing, installation and commissioning
ICS 27.040
K56
National Standards of People's Republic of China
GB/T 14099.8-2009/ISO 3977-8.2002
Gas turbines - Procurement
Part 8. inspection, testing, installation and commissioning
(ISO 3977-8.2002, IDT)
Posted 2009-04-13
2010-01-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 General 2
5 Check 2
5.1 General 2
5.2 material inspection 3
5.3 mechanical inspection 3
6 Test 3
6.1 General 3
6.2 Pressure Test 3
6.3 Function/Operation Test 5
6.4 Options Test 7
Storage and shipment preparation 7 8
7.1 General 8
7.2 Prepare 8
Installation and commissioning 8 9
GB/T 14099.8-2009/ISO 3977-8.2002
Foreword
GB/T 14099 "gas turbine procurement" consists of the following components.
--- Part 1. General principles and definitions;
--- Part 2. Standard reference conditions and ratings;
--- Part 3. Design requirements;
--- Part 4. Fuel and Environment;
--- Part 5. Application of the oil and gas industry;
--- Part 6. Combined Cycle;
--- Part 7. Technical information;
--- Part 8. inspection, testing, installation and commissioning;
--- Part 9. Reliability, availability, maintainability and safety.
This section GB/T 14099 Part 8.
This section identical with ISO 3977-8.2002 "gas turbine procurement - Part 8. inspection, testing, installation and commissioning" (in English).
This section is equivalent translation ISO 3977-8.2002.
For ease of use, this section made the following editorial changes.
--- The "international standards in this section" to "this Part";
"." --- With a decimal point instead of a comma as the decimal point, "";
--- Some of the statements apply to international standards to apply to our standard formulation;
--- To ISO 3977-8.2002 references to other international standards, it has been adopted as a standard by our country in place of the corresponding standard
International standards are not our standards adopted direct reference to international standards.
This part is proposed by China Machinery Industry Federation.
This section of the gas turbine of the National Standardization Technical Committee (SAC/TC259) centralized.
This section is drafted. Cogeneration Co., Ltd. up Suzhou, Shanghai Electric Gate Gas Turbine Power Co., Huaneng Shantou Power Plant, Nanjing burning
Gas Turbine Research Institute, Shanghai Power Equipment Research Institute, Tianjin Binhai Electric Power Co., Ltd., Zhejiang Zhenhai co-generation company, Sichuan Province
Electric Power Design Institute, China Southern Airlines Power Machinery Company.
The main drafters of this section. Hu Xinghui, Fan Bang Na, Cheung Shuen Chau, painted celebrate the country, Shen Qiu agriculture, Shen Guoqiang, Wu Yunfei, Zhang Yunyan, Chen Wenfeng.
GB/T 14099.8-2009/ISO 3977-8.2002
NOTE. This may include documents, reports, material certificates, chemical analysis, physical size or contour inspection, manufacturing records, visual inspection and/or documented
Inspection and test results, including any non-destructive testing can be employed (NDE) methods or techniques.
3.2
Proof assembly, parts or complete unit to meet the physical properties of the test program sets Suppliers and procedures specified functional and operational
Requirements, or the purchaser specification process.
GB/T 14099.8-2009/ISO 3977-8.2002
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 14099.8-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 14099.8-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 14099.8-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 14099.8-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|