|
US$354.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 14099.4-2010: Gas turbines -- Procurement -- Part 4: Fuels and environment Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 14099.4-2010 | English | 354 |
Add to Cart
|
3 days [Need to translate]
|
Gas turbines -- Procurement -- Part 4: Fuels and environment
| Valid |
GB/T 14099.4-2010
|
PDF similar to GB/T 14099.4-2010
Basic data | Standard ID | GB/T 14099.4-2010 (GB/T14099.4-2010) | | Description (Translated English) | Gas turbines -- Procurement -- Part 4: Fuels and environment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K56 | | Classification of International Standard | 27.040 | | Word Count Estimation | 18,144 | | Date of Issue | 2010-11-10 | | Date of Implementation | 2011-03-01 | | Quoted Standard | GB/T 14099-2005; GB/T 14099.3-2009; GB/T 15135-2002; GB/T 18345.1-2001; GB/T 18345.2-2001; ISO 4261-1993; ISO 10494-1993 | | Adopted Standard | ISO 3977-4-2002, IDT | | Regulation (derived from) | Announcement of Newly Approved National Standards 2010 No. 8 (No. 163 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the gas turbine procurement relating to fuel quality and environmental performance guidelines. The guidelines also pointed turbine manufacturer and the purchaser shall provide a gas turbine fuel used for the quantitative prediction of relevant information and data necessary environmental impact category. Technical specifications as the reference fuel, rather than regulations. |
GB/T 14099.4-2010: Gas turbines -- Procurement -- Part 4: Fuels and environment---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Gas turbines Procurement Part 4. Fuels and environment
ICS 27.040
K56
National Standards of People's Republic of China
Gas turbines - Procurement
Part 4. Fuel & Environment
Part 4. Fuelsandenvironment
(ISO 3977-4.2002, IDT)
Issued on. 2010-11-10
2011-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
Introduction Ⅳ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Symbols and abbreviations 3
5 sets of purchaser and provider of fuel requirements 3
6 Environmental requirements 7
Appendix A (Informative Appendix) Wobbe Index Calculation 12
References 13
Foreword
GB/T 14099 "gas turbine procurement" consists of the following components.
--- Part 1. General principles and definitions;
--- Part 2. Standard reference conditions and ratings;
--- Part 3. Design requirements;
--- Part 4. Fuel and Environment;
--- Part 5. Application of the oil and gas industry;
--- Part 6. Combined Cycle;
--- Part 7. Technical information;
--- Part 8. inspection, testing, installation and commissioning;
--- Part 9. Reliability, availability, maintainability and safety.
This section GB/T Part of 414,099.
This part identical with ISO 3977-4.2002 "gas turbine procurement - Part 4. Fuel & Environment" (in English).
ISO 3977-4.2002 replaces ISO 3977.1997 "gas turbine procurement" in the relevant sections. ISO 3977. 1978 is the equivalent of
Adopted as GB/T 14099-1993 "gas turbine procurement." And GB/T 14099-2005 instead of GB/T 14099-1993 "burning
Gas turbine procurement ", GB/T 14099.1-2004" turbines - Procurement - Part 1. General principles and definitions "and GB/T 14099.2-
2004 "turbines - Procurement - Part 2. Standard reference conditions and ratings." Therefore, this part of the corresponding section in place
GB/T 14099-2005 corresponding Chapters 8 and 9. And GB/T 14099-2005 has not been replaced by the remaining part is still valid,
Until all the rest of the promulgation, when the GB/T 14099-2005 was only partial replacement of all nine.
For ease of use, this section made the following editorial changes.
--- The "international standards in this section" to "this Part";
--- Use the decimal symbol instead of as a decimal comma ",". ",";
--- Delete foreword international standards, national standards increase the preface.
Appendix A of this section is an informative annex.
This part is proposed by China Machinery Industry Federation.
This section of the gas turbine of the National Standardization Technical Committee (SAC/TC259) centralized.
This section is drafted. Jiangsu Electric Power Design Institute, Zhejiang Electric Power Design Institute, Shanghai Power Equipment Research Institute, Shanghai Electric Gate
Gas Turbine Power Generation Co., Ltd., China Dongfang Electric Corporation, Zhejiang Zhenhai Power Company Limited jointly.
The main drafters of this Part. high beam Kerry, Shen and fortunately, Shen Qiu agriculture, Ma Jian, Zhang Yunyan, Wu Yunfei.
Introduction
This section GB/T 14099 is to establish the compliance of the gas turbine power plant using enacted. Current gas turbine manufacturing and
Install the rapid growth of the world are concerned about the regional and global environmental problems. This section discusses the use of such a gas turbine power plant
Fuel and operational issues related to generating emissions. This section details the requirements of the parties should be determined in advance, in order to achieve the shortest possible schedule delays,
Optimal performance and minimal environmental impact of building purposes.
Gas turbines - Procurement
Part 4. Fuel & Environment
1 Scope
This section GB/T 14099 gives a gas turbine procurement guide about fuel quality and environmental performance is. The guidelines also pointed out
Information about the fuel gas turbine sets and buyers should provide quantification and prediction of the environmental impact of the type of information necessary. Burn
Material specification as a reference, and not the rule.
2 Normative references
The following documents contain provisions which, through reference GB/T 14099 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 14099-2005 turbines - Procurement (ISO 3977.1991, IDT)
GB/T 14099.3-2009 turbines - Procurement - Part 3. Design requirements (ISO 3977-3.2004, IDT)
GB/T 15135-2002 turbine Vocabulary (ISO 11086.1996, MOD)
GB/T 18345.1-2001 gas turbine flue gas emission - Part 1. Measurement and Evaluation (idt ISO 11042-1.1996)
GB/T 18345.2-2001 gas turbine flue gas emission - Part 2. Automated emission monitoring (idt ISO 11042-2.
1996)
ISO 4261.1993 Petroleum products - Fuels (F class) boats and industrial gas turbine fuel specifications
ISO 10494.1993 gas turbine and gas turbine engineering measuring airborne noise measurement method
3 Terms and Definitions
GB/T 14099-2005, GB/T 14099.3-2009 and GB/T 15135-2002 established and the following terms and definitions applicable
For this part of GB/T 14099 of.
3.1
Density density
ρ =
pref
R · Tref
Which is usually selected reference temperature 15 ℃, the reference pressure 101.325kPa.
3.2
Integrated gasification combined cycle integratedgasificationcombinedcycle
IGCC
Combined cycle thermal process to gasify coal or other low-grade fuel energy.
3.3
Fuel nitrogen fuel-boundnitrogen
FBN
Results in the generation of fuel NOx nitrogen components.
Note. This does not include gaseous nitrogen N2.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 14099.4-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 14099.4-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 14099.4-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 14099.4-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|