US$219.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 10067.8-2016: Basic specifications for electroheat installations -- Part 8: Electroslag remelting furnaces Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 10067.8-2016 | English | 219 |
Add to Cart
|
3 days [Need to translate]
|
Basic specifications for electroheat installations -- Part 8: Electroslag remelting furnaces
| Valid |
GB/T 10067.8-2016
|
PDF similar to GB/T 10067.8-2016
Basic data Standard ID | GB/T 10067.8-2016 (GB/T10067.8-2016) | Description (Translated English) | Basic specifications for electroheat installations -- Part 8: Electroslag remelting furnaces | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | K61 | Classification of International Standard | 25.180.10 | Word Count Estimation | 11,195 | Date of Issue | 2016-02-24 | Date of Implementation | 2016-09-01 | Quoted Standard | GB/T 2900.23-2008; GB 5959.1-2005; GB 5959.8-2007; GB/T 10066.1-2004; GB/T 10066.8-2006; GB/T 10066.10-2005; GB/T 10067.1-2005; GB/T 14549-1993; GB/T 15543-2008; JB/T 9691-1999; JB/T 10358-2002 | Regulation (derived from) | National Standard Announcement No | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 10067.8-2016: Basic specifications for electroheat installations -- Part 8: Electroslag remelting furnaces ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Basic specifications for electroheat installations - Part 8. Electroslag remelting furnaces
ICS 25.180.10
K61
National Standards of People's Republic of China
Electric equipment basic technical conditions
Part 8. ESR furnaces
Issued on. 2016-02-24
2016-09-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
CONTENTS
Preface Ⅰ ...
1 Scope 1 ...
2 Normative references 1 ...
3 Terms and definitions ...
4 Products 1 ...
4.1 Model 1 ...
4.2 The main parameters 1 ...
5 Technical requirements 2 ...
5.1 General Requirements 2 ...
5.2 pairs of complementary design and manufacture of claim 2 ...
5.3 Performance Requirements 3 ...
5.4 Complete claim 4 ...
6 Test Method 4 ...
7 inspection rules and technical grade 4 ...
8 signs, packaging, transportation and storage 5 ...
9 Ordering and Delivery 6 ...
9.1 Purchase 6 ...
The special requirements of users 6 9.2 ...
Foreword
GB/T 10067 "Basic electric device technical conditions" existing 23 sections.
--- Part 1. Common part;
--- Part 2. Arc heating device;
--- Part 3. induction electric device;
--- Part 31. IF coreless induction furnace;
--- Part 32. voltage-frequency multi-station frequency coreless induction furnace complete sets of equipment;
--- Part 33. frequency coreless induction melting Tonglu;
--- Part 34. Transistor high frequency induction heating apparatus (This approval);
--- Part 4. Indirect resistance furnaces;
--- Part 41. network with resistance heating unit;
--- Part 42. Push resistance heating unit;
--- Part 43. Forced convection Pit resistance furnace;
--- Part 44. Box-type resistance furnace;
--- Part 45. vacuum hardening furnace;
--- Part 46. Bell-type resistance furnace;
--- 47 parts. vacuum heat treatment and brazing furnace;
--- Part 48. Car-resistance furnace;
--- Part 49. Natural convection Pit resistance furnace;
--- Part 410. single crystal furnace;
--- Part 411. Electric bath furnace;
--- Part 412. box-type quenching furnace (this approval);
--- Part 413. Experiment (The approval) with a resistance furnace;
--- Part 5. high-frequency dielectric heating equipment;
--- Part 8. ESR furnaces (this approval).
We will continue to develop other parts as needed.
This section GB/T Part 810 067, and should be GB/T Part 110 067 used in conjunction.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by the China Electrical Equipment Industrial Association.
This part of the National Electric Equipment Industry Standardization Technical Committee (SAC/TC121) centralized.
This section is drafted. Northeastern University, Xi'an Institute Furnace Co., Taiyuan Metallurgical Machinery Plant, Suzhou Zhenwu Furnace Co., Ltd., the State Quality Supervision and Inspection Center Furnace.
The main drafters of this section. Jiangzhou Hua, Yu Qiang, Zhu Lin, Yan Dong Wu, Li Yayi, Yuan Fanglan, Zangxi Min Lu Zheng Qi, Zhou Huijun, Liu Fubin, Xing - hair, Chen Xu.
Electric equipment basic technical conditions
Part 8. ESR furnaces
1 Scope
GB/T 10067 provisions of this part of the ESR furnace product classification, technical requirements, test methods, inspection rules and technical grading, marking, packaging, transport and storage ordering and delivery and so on.
This section applies to all forms of ESR furnaces.
2 Normative references
The following documents for the application of this document is essential. For cited documents with dates, only the dated edition applies to this document. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2900.23-2008 Electrotechnical terminology Industrial Heating Equipment
GB 5959.1-2005 Safety of electric devices - Part 1. General requirements
Safety - Part 8 GB 5959.8-2007 electric apparatus. Particular requirements for electroslag remelting furnaces
GB/T 10066.1-2004 Test methods for electroheat installations - Part 1. General section
Test methods GB/T 10066.8-2006 electric installations - Part 8. ESR furnaces
GB/T 10066.10-2005 test methods for electric installations - Part 10. Direct electric arc furnace
GB/T 10067.1-2005 basic technical conditions for electric devices - Part 1. General section
GB/T 14549-1993 power quality utility grid harmonic
GB/T 15543-2008 power quality three-phase voltage unbalance
JB/T 9691-1999 Heating Equipment Model methodology
JB/T 10358-2002 industrial electric equipment water-cooled cables
3 Terms and Definitions
GB/T 2900.23-2008, terms and definitions GB 5959.8-2007 and GB/T 10066.8-2006 defined apply to this document.
4 Products
4.1 Model
Remelting furnace product model shall JB/T 9691-1999 prepared.
4.2 The main parameters
Remelting furnace product standards in general, should be listed in the following main parameters.
a) transformer rated capacity, kVA;
b) primary voltage, kV;
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 10067.8-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 10067.8-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 10067.8-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 10067.8-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|