|
US$369.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 10067.49-2014: Basic specifications for electroheat installations -- Part 49: Natural convection pit resistance furnaces Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 10067.49-2014 | English | 369 |
Add to Cart
|
3 days [Need to translate]
|
Basic specifications for electroheat installations -- Part 49: Natural convection pit resistance furnaces
| Valid |
GB/T 10067.49-2014
|
PDF similar to GB/T 10067.49-2014
Basic data | Standard ID | GB/T 10067.49-2014 (GB/T10067.49-2014) | | Description (Translated English) | Basic specifications for electroheat installations -- Part 49: Natural convection pit resistance furnaces | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K61 | | Classification of International Standard | 25.180.10 | | Word Count Estimation | 16,182 | | Date of Issue | 9/3/2014 | | Date of Implementation | 2/1/2015 | | Quoted Standard | GB 5959.1-2005; GB/T 10066.1-2004; GB/T 10066.4-2004; GB/T 10067.1-2005; GB/T 10067.4-2005; JB/T 7629-1994; JB/T 9691-1991; JB/T 3649.1; JB/T 3649.2; JB/T 3649.3; JB/T 3649.4; JB/T 3649.5; JB/T 3649.6 | | Regulation (derived from) | People's Republic of China Announcement of Newly Approved National Standards No. 21 of 2014 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the technical requirements of the common natural convection resistance furnace products, test methods, inspection rules, marking, packaging, transportation, storage, and ordering and delivery. This section applies to natural convec |
GB/T 10067.49-2014: Basic specifications for electroheat installations -- Part 49: Natural convection pit resistance furnaces ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Basic specifications for electroheat installations Part 49. Natural convection pit resistance furnaces
ICS 25.180.10
K61
National Standards of People's Republic of China
Electric equipment basic technical conditions
Part 49. Natural convection pit Furnace
Part 49. Naturalconvectionpitresistancefurnaces
Issued on. 2014-09-03
2015-02-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Product Category 1
4.1 varieties and specifications 1
4.2 Part 2
4.3 The main parameters 2
5 Technical requirements 3
5.1 General Requirements 3
5.2 pairs of complementary design and manufacture of claim 3
5.3 Performance Requirements 4
5.4 sets requirements 8
6 Test methods 8
6.1 General provisions 8
Measuring 6.2 furnace furnace temperature uniformity and stability of 8
6.3 Measurement of surface temperature 9
6.4 heating capacity tests 9
6.5 9 loading test run
7 inspection rules and technical grade 9
8 signs, packaging, transportation and storage 10
9 Ordering and Delivery 11
Appendix A (informative) Some specifications pit furnaces and furnace work zone size Size 12
Foreword
GB/T 10067 "Basic electric device technical conditions" existing 19 sections.
--- Part 1. Common part;
--- Part 2. Arc heating device;
--- Part 3. induction electric device;
--- Part 31. IF coreless induction furnace;
--- Part 32. voltage-frequency multi-station frequency coreless induction furnace complete sets of equipment;
--- Part 33. frequency coreless induction melting Tonglu;
--- Part 4. Indirect resistance furnaces;
--- Part 41. network with resistance heating unit;
--- Part 42. Push resistance heating unit;
--- Part 43. Forced convection Pit resistance furnace;
--- Part 44. Box-type resistance furnace;
--- Part 45. vacuum hardening furnace;
--- Part 46. Bell-type resistance furnace;
--- 47 parts. vacuum heat treatment and brazing furnace;
--- Part 48. Car-resistance furnace;
--- Part 49. Natural convection Pit resistance furnace;
--- Part 410. single crystal furnace;
--- Part 411. Electric bath furnace;
--- Part 5. High-frequency dielectric heating equipment.
We will continue to develop other parts as needed.
This section GB/T Part of 4,910,067, should be GB/T Part 1 and Part 410 067 used in conjunction.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by the China Electrical Equipment Industrial Association.
This part of the National Electric Equipment Industry Standardization Technical Committee (SAC/TC121) centralized.
This section is drafted. Xi'an Institute Ltd. furnace, furnace Metallurgical Engineering Technology Center, the State Quality Supervision and Inspection Center Furnace,
Shaanxi Province electric engineering and technology research center.
The main drafters of this section. Yinqing Jun, Huangkui Gang, Zhu Lin.
Electric equipment basic technical conditions
Part 49. Natural convection pit Furnace
1 Scope
GB/T 10067 in this section provides for common technical requirements natural convection pit Furnace products, test methods, inspection rules,
Signs, packaging, transportation, storage, and ordering and delivery.
This section applies to 4.1, 5.1 and 5.2 according to the requirements of the design, in the natural atmosphere or protective atmosphere conditions, the maximum operating temperature of 1000 ℃,
1200 ℃ and 1400 ℃ heating and heat treatment of various types of industrial natural convection pit Furnace.
This section also applies to similar natural convection Pit resistance furnace, the different parts can be otherwise.
This section does not apply to household and similar electric appliances.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 5959.1-2005 Safety of electric devices - Part 1. General requirements
GB/T 10066.1-2004 Test methods for electroheat installations - Part 1. General section
GB/T 10066.4-2004 Test methods for electric equipment - Part 4. Indirect resistance furnaces
GB/T 10067.1-2005 basic technical conditions for electric devices - Part 1. General section
GB/T 10067.4-2005 Electric equipment basic technical conditions - Part 4. Indirect resistance furnaces
JB/T 3649 (all parts) resistance furnace refractory products
JB/T 7629-1994 refractory fiber lining in the design and installation specifications
JB/T 9691-1999 Heating Equipment Model methodology
3 Terms and Definitions
GB/T 10066.4-2004 and as defined in the following terms and definitions apply to this document.
3.1
Furnace size dimensionsofheatingchamber
The design requirements of the furnace space dimensions, usually expressed in diameter and height. Hearth furnace mouth diameter less than the internal diameter of the pit clearance
Furnace, furnace size of the "diameter" of the furnace mouth diameter, the "height" is a top clearance distance between the tile and hearth furnace. Other double by supply and demand
Parties agreed.
Note. Some specifications pit furnace work zone size and dimensions of the furnace control see Appendix A.
3.2
Protective atmosphere protectiveatmosphere
Pit furnace to protect the charge to avoid or reduce oxidation and decarbonization atmosphere.
4 Products
4.1 varieties and specifications
4.1.1 pit furnace atmosphere and according to the maximum operating temperature is divided into a number of varieties, as shown in Table 1.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 10067.49-2014_English be delivered?Answer: Upon your order, we will start to translate GB/T 10067.49-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 10067.49-2014_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 10067.49-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|