HOME   Cart(2)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 4365-2024 English PDF

US$759.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 4365-2024: Electrotechnical terminology - Electromagnetic compatibility
Status: Valid

GB/T 4365: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 4365-2024English759 Add to Cart 6 days [Need to translate] Electrotechnical terminology - Electromagnetic compatibility Valid GB/T 4365-2024
GB/T 4365-2003English170 Add to Cart 0--9 seconds. Auto-delivery Electrotechnical terminology -- Electromagnetic compatibility Valid GB/T 4365-2003
GB/T 4365-1995English919 Add to Cart 4 days [Need to translate] Terminology for electromagnetic compatibility Obsolete GB/T 4365-1995
GB 4365-1984English559 Add to Cart 4 days [Need to translate] Terminology for radio interference Obsolete GB 4365-1984

PDF similar to GB/T 4365-2024


Standard similar to GB/T 4365-2024

GB 4824   GB 4343.1   GB 4824   

Basic data

Standard ID GB/T 4365-2024 (GB/T4365-2024)
Description (Translated English) Electrotechnical terminology - Electromagnetic compatibility
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard L06
Classification of International Standard 33.100
Word Count Estimation 38,376
Date of Issue 2024-12-31
Date of Implementation 2025-07-01
Older Standard (superseded by this standard) GB/T 4365-2003
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 4365-2024: Electrotechnical terminology - Electromagnetic compatibility

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 33.100 CCSL06 National Standard of the People's Republic of China Replace GB/T 4365-2003 Electromagnetic compatibility Released on 2024-12-31 2025-07-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 3.1 Basic Concepts 1 3.2 Disturbance Waveform 4 3.3 Interference Control 6 3.4 Measurement 9 3.5 Equipment classification 12 3.6 Receiver and Transmitter 13 3.7 Power Control and Power Supply Network Impedance 15 3.8 Voltage changes and flicker 17 3.9 Risk Assessment 19 Reference 20 Index 21

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 4365-2003 "Electrotechnical terminology electromagnetic compatibility". Compared with GB/T 4365-2003, except for structural adjustments and In addition to editorial changes, the main technical changes are as follows. a) Adjusted the numbering of all terms; b) Changed 10 terms such as "electromagnetic disturbance" in "Basic Concepts" (see 3.1.5, 3.1.6, 3.1.8, 3.1.9, 3.1.12, 3.1.13, 3.1.17, 3.1.18, 3.1.21, 3.1.22,.2003 edition 161-01-05, 161-01-06, 161-01-08, 161-01-09, 161-01-12, 161-01-13, 161-01-17, 161-01-18, 161-01-21, 161-01-22); c) Added three terms such as "high frequency" in "basic concepts" (see 3.1.25, 3.1.26, 3.1.27); d) Changed 6 terms such as “transient [adjective and noun]” in “disturbance waveform” (see 3.2.1, 3.2.8, 3.2.11, 3.2.12, 3.2.19, 3.2.25, 161-02-01, 161-02-08, 161-02-11, 161-02-12, 161-02-19, 161-02-25 of the.2003 edition); e) The term "disturbance suppression" in "interference control" has been changed (see 3.3.22, 161-03-22 of the.2003 edition); f) Changed 7 terms such as "artificial power network" in "measurement" (see 3.4.5, 3.4.8, 3.4.9, 3.4.16, 3.4.34, 3.4.36, 3.4.37, 161-04-05, 161-04-08, 161-04-09, 161-04-16, 161-04-34, 161-04-36, 161-04-37 of the.2003 edition); g) Changed 9 terms such as "protection ratio" in "receiver and transmitter" (see 3.6.5, 3.6.6, 3.6.7, 3.6.8, 3.6.9, 3.6.19, 3.6.20, 3.6.21, 3.6.22,.2003 edition 161-06-05, 161-06-06, 161-06-07, 161-06-08, 161-06-09, 161-06-19, 161-06-20, 161-06-21, 161-06-22); h) Changed the term "installed equipment wiring impedance" in "power control and supply network impedance" (see 3.7.18,.2003 edition) 161-07-18); i) Changed two terms in “voltage variation and flicker”, including “voltage fluctuation waveform” (see 3.8.6, 3.8.17, 161-08-06,.2003 edition) 161-08-17); j) Added three terms such as "electromagnetic compatibility risk" in "risk assessment" (see 3.9.1, 3.9.2, 3.9.3, 3.9.4). This document is modified to adopt IEC 60050-161.2021 "International Electrotechnical Vocabulary (IEV) Part 161.Electromagnetic Compatibility". Compared with IEC 60050-161.2021, this document has made the following structural adjustments. --- Added a chapter "Scope" to comply with the provisions of my country's standardization document drafting (see Chapter 1); --- Added a chapter on "Normative references" to comply with the provisions on drafting standardization documents in my country (see Chapter 2). The technical differences between this document and IEC 60050-161.2021 and their reasons are as follows. --- Added the term and definition of "risk assessment" to adapt to the latest technological developments in electromagnetic compatibility (see 3.9). The following editorial changes were made to this document. --- Change the name of the standard to "Electrical Terminology Electromagnetic Compatibility"; ---Added titles to terms at each level; ---All terms have been renumbered; --- Deleted the note on French in 3.1.5; --- Deleted the note on French in 3.1.6 and the note repeated in 3.1.5; --- Deleted the note on French in 3.1.9; --- Added 3.2.1 definition of adjective and noun attributes; --- Deleted the note about Russian in 3.3.9; ---3.1.10 source modified to. IEC 60050-702.1992, 702-02-07, with modifications; ---3.2.21 source modified to. IEC 60050-103.2009,103-07-31, modified; ---3.2.22 source modified to. IEC 60050-103.2009,103-07-23, modified; ---3.2.23 source modified to. IEC 60050-702.1992, 702-04-51, modified; ---3.2.24 source modified to. IEC 60050-103.2009, 103-06-07, modified; ---3.2.26 source modified to. IEC 60050-103.2009,103-06-13, modified; ---3.3.1 source modified to. IEC 60050-702.1992, 703-02-09, with modifications; ---3.3.25 source modified to. IEC 60050-151.2001,151-01-13, modified; ---3.3.26 source modified to. IEC 60050-151.2001, 151-13-12, modified; ---3.7.13 source modified to. IEC 60050-103.2009,103-05-08, modified; ---3.7.14 source modified to. IEC 60050-151.2001, 151-15-12, modified; ---3.8.10 source modified to. IEC 60050-614.2016, 614-01-08, modified; --- The source of 3.8.13 is modified to. IEC 60050-614.2016, 614-01-28; ---3.8.14 source modified to. IEC 60050-614.2016, 614-01-30, modified; ---3.8.17 source modified to. IEC 60050-845.2020, 845-02-50, modified; --- Deleted the source of terms and definitions 3.2.25; --- Deleted the source of terms and definitions 3.2.27; --- Deleted the source of terms and definitions 3.5.4; --- Deleted the source of terms and definitions 3.8.11; --- Added "References" to list the documents cited in the text. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the National Technical Committee for Radio Interference Standardization (SAC/TC79). This document was prepared by the National Technical Committee for Radio Interference Standardization (SAC/TC79) and the National Technical Committee for Electrotechnical Terminology Standardization (SAC/TC232) jointly under the jurisdiction of the Commission. This document was drafted by. Shanghai Electric Science Research Institute, Ruifeng RF Technology (Shanghai) Co., Ltd., China Electronics Cosine Technology Co., Ltd. Company, China Electronics Technology Standardization Institute, Zhejiang Qianjiang Robot Co., Ltd., China Academy of Information and Communications Technology, Zhejiang Pinshang Intelligent Technology Co., Ltd., Institute of Biomedical Engineering, Chinese Academy of Medical Sciences, Liaoning Inspection and Certification Center, China Automotive Engineering Research Institute Co., Ltd. Co., Ltd., Guangdong Yudean Technology Testing and Inspection Technology Co., Ltd., Hubei Medical Device Quality Supervision and Inspection Institute, Shanghai Electric Science Research Institute Institute (Group) Co., Ltd., Shanghai Electrical Equipment Testing Institute Co., Ltd., Xiamen Weien Electric Co., Ltd., China Academy of Building Materials (Beijing) Testing and Certification Co., Ltd., China Electric Power Research Institute Co., Ltd., Zhejiang Kanger Electric Co., Ltd., Changzhou Chuanglian Power Technology Co., Ltd., Taicang Tongwei Electronics Co., Ltd., Shenzhen Gongjin Electronics Co., Ltd., China Southern Power Grid Big Data Services Co., Ltd., Shenzhen Heli Intelligent Equipment Co., Ltd., Shenzhen Toplink Technology Co., Ltd., Shenzhen Pengcheng New Energy Technology Co., Ltd., Hexing Automotive Electronics Co., Ltd., Shuyuan Technology Co., Ltd., Zhengzhou Youbi Technology Co., Ltd., Xi'an Hanbo Electronic Technology Co., Ltd., Jiangxi Luxshare Zhizao Co., Ltd., Shenzhen Qiuyu Electronic Technology Co., Ltd., Jiangsu Xudian Construction Group Co., Ltd., Zhonghui Chuangzhi (Shenzhen) Wireless Power Supply Technology Co., Ltd., Shenzhen Lianju Automation Technology Co., Ltd., Shenzhen Yantong High Frequency Technology Co., Ltd., Shenzhen Shengfit Technology Co., Ltd. Co., Ltd., Shenzhen Kaien Technology Co., Ltd., Shenzhen Zhiren Technology Co., Ltd., Jianding (Wuxi) Electronics Co., Ltd., Siyi Technology (Shenzhen) Co., Ltd. and China Power Engineering Group Chongqing Engineering Co., Ltd. The main drafters of this document are. Xing Lin, Luo Yuxiang, Liu Enxiao, Cui Qiang, Liu Chang, Lu Bingsong, Chen Shengjie, Pu Jiangbo, Wei Jingfeng, Zeng Xia, Liu Ling, Xu Yang, Zheng Junqi, Wang Meng, Xu Zhenqiang, Wang Xi, Li Ni, Shi Leizhen, Tang Jingxin, Li Ting, Yao Bo, Gong Zhaobo, Quan Chenggen, Zhu Yuhao, Liang Zhemin, Zhou Huaguo, Xiao Lan, Wang Jin, Zhou Shuo, Lü Qunfang, Zhao Yue, Zhang Yu, Chang Hong, Jiang Qiuxiong, Li Qian, Li Linghan, Liu Song, Yan Yuejun, Xiong Yue, Zhou Daoping, Xu Chaoyang, Chen Yonglun, Luo Xiaogang, and Wang Yong. The previous versions of this document and the documents it replaces are as follows. ---First published as GB/T 4365-1984 in 1984, first revised in.1995, second revised in.2003; ---This is the third revision. Electromagnetic compatibility

1 Scope

This document defines electromagnetic compatibility in terms of basic concepts, disturbance waveforms, interference control, measurement, equipment classification, receivers and transmitters, power control Terms and definitions for control and power supply network impedance, voltage variation and flicker, and risk assessment. This document is applicable to the preparation of various standards and other technical documents related to electromagnetic compatibility.

2 Normative references

This document has no normative references.

3 Terms and definitions

3.1 Basic Concepts 3.1.1 The sum of all electromagnetic phenomena present in a given location. NOTE. In general, the electromagnetic environment is time-dependent and its description may require statistical methods. 3.1.2 Electromagnetic noise A time-varying electromagnetic phenomenon that apparently does not convey information but may be superimposed or combined with useful information. 3.1.3 Unwanted signal; undesired signal Signals that may impair reception of wanted signals. [Source. IEC 60050-702.1992, 702-08-02] 3.1.4 Interfering signal A signal that impairs the reception of a wanted signal. 3.1.5 Electromagnetic phenomena that may cause degradation of the performance of devices, equipment or systems or have adverse effects on living or non-living things. Note 1 to entry. Electromagnetic disturbances may be electromagnetic noise (3.1.2), unwanted signals (3.1.3), or changes in the propagation medium itself. Note 2 to entry. The terms “electromagnetic disturbance (3.1.5)” and “electromagnetic interference (3.1.6)” mean “cause” and “consequence” respectively and should not be used interchangeably. 3.1.6 Degradation of performance (3.1.19) of equipment, transmission channels or systems caused by electromagnetic disturbance (3.1.5) 3.1.7 The equipment or system can work normally in its electromagnetic environment (3.1.1) and does not cause unacceptable electromagnetic disturbance to anything in the environment.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 4365-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 4365-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 4365-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 4365-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 4365-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 4365-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.