HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB/T 13749-2022 English PDF

US$189.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 13749-2022: Impact pile drive - Code of practice of safety operation
Status: Valid

GB/T 13749: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 13749-2022English189 Add to Cart 3 days [Need to translate] Impact pile drive - Code of practice of safety operation Valid GB/T 13749-2022
GB 13749-2003English78 Add to Cart 1 days [Need to translate] [GB/T 13749-2003] Diesel pile driver -- Safety operation rules Obsolete GB 13749-2003
GB 13749-1992English199 Add to Cart 2 days [Need to translate] Diesel pile driver--Safety operation rules Obsolete GB 13749-1992

PDF similar to GB/T 13749-2022


Standard similar to GB/T 13749-2022

GB/T 17300   GB/T 16936   GB/T 17301   GB/T 13750   GB/T 13751   

Basic data

Standard ID GB/T 13749-2022 (GB/T13749-2022)
Description (Translated English) Impact pile drive - Code of practice of safety operation
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard P97
Classification of International Standard 91.220
Word Count Estimation 10,193
Date of Issue 2022-10-14
Date of Implementation 2023-05-01
Older Standard (superseded by this standard) GB/T 13749-2003
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 13749-2022: Impact pile drive - Code of practice of safety operation

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Impact pile drive -- Code of practice of safety operation ICS 91.220 CCSP97 National Standards of People's Republic of China Replacing GB/T 13749-2003 Safety operation rules for impact pile driver Published on 2022-10-12 2023-05-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General Requirements 1 5 Working conditions 2 6 Pre-work inspection 2 7 Requirements for safe operation at work 3 8 Precautions after work 4 Appendix A (Normative) Wire Rope Clamp Selection and Installation 5 A.1 General 5 A.2 Installation 5 A.3 Number of rope clips5 A.4 Tightening torque 5 Figure A.1 Correct arrangement of wire rope clamps 5 Figure A.2 Outline dimensions of wire rope clamps5 Table A.1 Number of wire rope clamps and tightening torque6

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document replaces GB/T 13749-2003 "Safety Operating Regulations for Diesel Pile Drivers". Compared with GB/T 13749-2003, except for the In addition to structural adjustments and editorial changes, the main technical changes are as follows. --- Change the relevant requirements for the selection and installation of wire rope clamps (see 4.5, 3.5 of the.2003 edition); --- Increased the requirements for the safety factor of wire ropes (see 4.5); --- Increased the requirements for the special operating environment of the impact pile driver (see 4.6); --- Changed the requirements for "working at heights" (see 4.9, 3.9 of the.2003 edition); --- Added the provisions of the impact pile hammer "pile pulling operation", "air driving operation" and "when using hoisting" (see 4.10~4.12); --- Added the provisions of hydraulic pile hammer "control box and cable" (see 4.13); --- Added provisions for "piling on water" (see 4.14); --- Increased the operating conditions of the impact pile hammer landing gear (see 5.4); --- Increased the operating conditions of the hydraulic pile hammer "manipulation box" (see 5.5); --- Added the operating conditions for "piling on water" (see 5.7); --- Changed the requirements for wire rope inspection and scrapping (see 6.1, 5.1 of the.2003 edition); --- Increased the inspection content of pile frame and hydraulic pile hammer "hydraulic oil pipe" (see 6.2); --- Added the inspection content of "power station" and "accumulator" (see 6.3, 6.4); --- Changed the inspection requirements of "hoist" (see 6.6, 5.3 of the.2003 edition); --- Added the inspection content of impact pile hammer "hammer pad" and "buffer pad" (see 6.14, 6.15); --- Added the inspection content of "piling on water surface" (see 6.20); --- Increased the safety operation requirements in the operation of hydraulic pile hammers (see 7.8, 7.9, 7.22); --- Changed the operation requirements for correcting the verticality of the pile after the pile insertion (see 7.17, 6.15 of the.2003 edition); --- Increased the requirements for "pillar movement" in the operation (see 7.23); --- Added the operational requirements for "piling on water" (see 7.24~7.26); --- Added the precautions for "after water surface piling operations" (see 8.5); --- Added "Wire Rope Clamp Selection and Installation" (see Appendix A). Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by China Machinery Industry Federation. This document is under the jurisdiction of the National Standardization Technical Committee of Construction Machinery and Equipment (SAC/TC328). This document was drafted by. Zhejiang Yongan Construction Machinery Co., Ltd., Beijing Construction Mechanization Research Institute Co., Ltd., Wenzhou Yongan Heavy Industry Co., Ltd. Technology Co., Ltd., Tongji University, China Railway Bridge Bureau Group Co., Ltd., CCCC Third Navigation Engineering Bureau Co., Ltd., CCCC Fourth Navigation Bureau Second Project Co., Ltd., CCCC First Navigation Engineering Bureau Co., Ltd., CCCC Second Navigation Engineering Bureau Co., Ltd., CCCC Second Public Engineering Bureau First Engineering Co., Ltd. Company, Tianjin Port and Shipping Engineering Co., Ltd., Jiangsu Longyuan Zhenhua Offshore Engineering Co., Ltd., Jiangsu Huaxi Village Offshore Engineering Service Co., Ltd., Guangdong Jianji Foundation Engineering Co., Ltd., China Metallurgical Chengdu Exploration and Research Institute Co., Ltd., China Construction Education Association. The main drafters of this document. Lin Deng, Yu Youcun, Guo Chuanxin, Zhang Jian, Lu Hong, Qu Yaobao, Sun Guoguang, Li Yazhou, Yang Wu, Zhang Yachun, Wang Huiliang, Wu Kaijun, Chen Qiang, Ma Xiaoli, Cao Chuntong, Gong Jianjun, Cui Yuzhong, Luo Donglin, Chen Yuanwan, Chen Zengzeng, Yang Zhenyu, Weng Kai, Miao Yansui, Xiao Yangchun, Xu Bailong, Jia Min, Xiao Jisheng, Feng Xiaoxing, Liao Peng, Ren Dongxing, Liu Chenghuan, and Rome. The previous versions of this document and its superseded documents are as follows. ---First published in.1992 as GB 13749-1992, first revised in.2003, and converted to a recommended standard in.2017 GB/T 13749-2003; ---This is the second revision. Safety operation rules for impact pile driver

1 Scope

This document specifies the operating safety requirements for impact pile driver operators before, during and after work. This document is applicable to impact piling hammers (including diesel piling hammers and hydraulic piling hammers) and pile frames, cranes, engineering ships, etc. Operation of the hammer pile driver.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB/T 5972-2016 Maintenance, maintenance, inspection and scrapping of crane wire ropes GB/T 6067.1 Safety Regulations for Lifting Machinery Part 1.General GB/T 7920.6 Construction Machinery and Equipment Terminology and Commercial Specifications for Piling Equipment GB 22361-2008 Safety Specification for Piling Equipment JGJ80 Safety technical specifications for working at heights in building construction

3 Terms and Definitions

Terms and definitions defined in GB/T 7920.6 apply to this document.

4 General requirements

4.1 The operator should be specially trained to be familiar with the performance, structure, use and maintenance of the impact pile driver (hereinafter referred to as "piling driver") under operation. The maintenance method can only be operated after holding the operation certificate. 4.2 Before the operation, the surrounding environment, buildings and geological conditions of the work site should be fully understood. 4.3 The power device, hoist, hydraulic device and electrical device etc. equipped with the pile driver shall be operated according to their operating instructions. 4.4 The assembly, commissioning and disassembly of the pile driver should be operated according to the procedures specified in the instruction manual. 4.5 The steel wire rope should be fixed with wedge joints, pressing plates, rope clips, pressed joints or braided plugs corresponding to the diameter of the wire rope. steel wire rope When plugged and fixed, the length of the braided part should not be less than 20 times the diameter of the wire rope and should not be less than 300mm, and the braided part should be made of thin steel wire. tie up. When a wire rope clamp is used for fixed connection, the selection and installation of the wire rope clamp shall comply with the requirements of Appendix A. Pile frame wire rope safety factor It should comply with the provisions of 4.6.5 in GB 22361-2008, and the safety factor of the wire rope of the lifting pile driver should not be less than 6 times. 4.6 In case of severe weather such as level 6 and above strong wind or heavy rain, heavy snow and heavy fog, the operation should be stopped. When the wind is greater than seven, the piles should be driven Stop the machine in the windward direction, put down the impact piling hammer (hereinafter referred to as the impact hammer), and add a windproof cable. If necessary, the pile frame should be brought down. Pile driver should There are lightning protection measures, and personnel should stay away from the pile driver in case of lightning. In special operating environment, the operation can be continued after the operation review and approval. 4.7 When installing the impact hammer, the impact hammer should be transported to within 2m in front of the guide column of the pile frame, and at least two free ends of the impact hammer should be fastened. Pull the rope to ensure that the impact hammer does not sway left and right during the ascending process, and at the same time avoid the impact with the pile frame column. 4.8 When the pile driver is running, personnel should not enter within 3m below the impact hammer.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 13749-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 13749-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 13749-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 13749-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 13749-2022?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 13749-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.