HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GA/T 70-2014 English PDF

US$1059.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GA/T 70-2014: Compiling methods of expense budget for security engineering construction and maintaining service

GA/T 70: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GA/T 70-2014English1059 Add to Cart 6 days [Need to translate] Compiling methods of expense budget for security engineering construction and maintaining service GA/T 70-2014
GA/T 70-2004English679 Add to Cart 3 days [Need to translate] Compiling method of budget for security and protection engineering expense Obsolete GA/T 70-2004
GA/T 70-1994English719 Add to Cart 3 days [Need to translate] (Budgeting method of budget for security and prevention project) Obsolete GA/T 70-1994

PDF similar to GA/T 70-2014


Standard similar to GA/T 70-2014

GB 8108   GA 1051   GB 10408.3   GA/T 74   GA/T 73   GA/T 72   

Basic data

Standard ID GA/T 70-2014 (GA/T70-2014)
Description (Translated English) Compiling methods of expense budget for security engineering construction and maintaining service
Sector / Industry Public Security (Police) Industry Standard (Recommended)
Classification of Chinese Standard A91
Classification of International Standard 13.310
Word Count Estimation 33,358
Date of Issue 2014-08-05
Date of Implementation 2014-10-01
Older Standard (superseded by this standard) GA/T 70-2004
Quoted Standard GB 50500-2013
Regulation (derived from) Notice on Publication of Public Safety Industry Standard (Year of 2014); Industry Standard Record Announcement No. 4 of 2015 (No. 184)
Issuing agency(ies) Ministry of Public Security
Summary This standard stipulates the composition and calculation method of the expenses for the construction of security and prevention projects and the maintenance expenses, and is the basis for the budgeting, budgeting and finalizing of the expenses for the con

GA/T 70-2014: Compiling methods of expense budget for security engineering construction and maintaining service


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Compiling methods of expense budget for security engineering construction and maintaining service ICS 13.310 A91 People's Republic of China Public Security Industry Standards Replacing GA/T 70-2004 Security Project Construction and Maintenance Cost budgeting Issued on. 2014-08-05 2014-10-01 implementation People's Republic of China Ministry of Public Security

Table of Contents

Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Security Project construction costs 4 4.1 Construction cost composition 4 4.2 Project cost 4 Construction of other costs 4.3 5 4.4 9 contingencies 9 4.5 Special charges 5 Maintenance Fee 10 5.1 cost composition 10 5.2 Maintenance survey and design fees 10 5.3 Maintenance service charges 10 Maintenance and other costs 11 5.4 Composition and Examples 12 Appendix A (informative) fixed pricing budget document Annex B (informative) Bill of Quantities budget document composition and example 19 References 30

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard is GA/T 70-2004 "Security Project cost budgeting" amendment, and the standard name changed to "security Full guard Construction and maintenance costs budgeting. " This standard compared with GA/T 70-2004, the main technical changes are as follows. --- Expanding the scope of the standard; --- Update relevant references; --- Required standard content increases, amended some of the terms and definitions (3.1,3.2,3.9,3.18,3.20 ~ 3.23,3.25,3.26, 2004 Version 3.2, 3.3 ~ ~ 3.5,3.7,3.10 3.12,3.14,3.15); --- Increasing the calculation of the Bill of Quantities (4.2.3); --- The construction unit management fee calculation has been revised (4.3.2); --- To calculate the tender agent fees were revised (4.3.4); --- Costs of engineering investigation, engineering design fee calculation has been revised (4.3.5,4.3.6); --- Construction supervision fee calculation has been revised (4.3.7); --- Increase the feasibility study costs, maintenance costs of maintenance calculation (4.3.5, Chapter 5). This standard by the National Security Alarm System Standardization Technical Committee (SAC/TC100) and focal points. This standard was drafted. First Research Institute of Ministry of Public Security, Beijing Univision Aegis Security Technology Co., Ltd., Beijing Sound Xun Electronics Company Limited Division, Beijing Fusheng Electronic Co., Ltd. The main drafters of this standard. Shi Yanlin, Wang L, Li Ying, Cai Shaohua, Nie Rong, Lou Jian, King Lam quarter. From the date of implementation of this standard instead of GA/T 70-2004. This standard replaces the standards previously issued as follows. --- GA/T 70-1994, GA/T 70-2004. Security Project Construction and Maintenance Cost budgeting

1 Scope

This standard specifies the security and maintenance of the Project Cost structure and calculation method of maintenance costs, is the preparation of security engineering construction Set up and maintenance cost estimates, budgets and accounts basis. This standard applies to new construction, expansion and renovation project of the building of security and maintenance services.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 50500-2013 construction engineering bill pricing norms

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Fixed ration Provisions in the amount of security engineering and construction unit of the product of labor, materials, machinery, capital consumption. 3.2 Budget quota budgetration Security to the various sub-projects (ie in the project can be divided entity apart) was measured, the provisions consumed in the unit project Artificial (man-days), materials, mechanical (equipment) sets the number of standard class. 3.3 Labor costs laborexpense Constitute gross wage provisions in the fees paid to the construction and installation works of production workers and production units affiliated workers. 3.4 Materials and engineering equipment costs materialexpense Consuming construction process cost raw materials, auxiliary materials, components and parts, components, semi-finished or finished products, engineering equipment. 3.5 Construction equipment fee constructionequipmentexpense Construction machinery, instruments royalties construction work occurred or rental fee. 3.6 Enterprise management fees enterpriseadministrationexpense Construction and installation of construction enterprises needed to organize production and management costs. 3.7 Fees fees According to the national laws and regulations, by the relevant provincial governments and provincial authorities must pay or provisions to take into account the cost.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GA/T 70-2014_English be delivered?

Answer: Upon your order, we will start to translate GA/T 70-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GA/T 70-2014_English with my colleagues?

Answer: Yes. The purchased PDF of GA/T 70-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GA/T 70-2014?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GA/T 70-2014 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.