US$879.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 515.3-2020: Specifications for the design of public security traffic command system - Part 3: City public security traffic command system Status: Valid GA/T 515.3: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GA/T 515.3-2020 | English | 879 |
Add to Cart
|
6 days [Need to translate]
|
Specifications for the design of public security traffic command system - Part 3: City public security traffic command system
| Valid |
GA/T 515.3-2020
|
| GA/T 515.3-2011 | English | RFQ |
ASK
|
5 days [Need to translate]
|
Specifications for the design of public security traffic command system. Part 3: City public security traffic command system
| Obsolete |
GA/T 515.3-2011
|
PDF similar to GA/T 515.3-2020
Basic data | Standard ID | GA/T 515.3-2020 (GA/T515.3-2020) | | Description (Translated English) | Specifications for the design of public security traffic command system - Part 3: City public security traffic command system | | Sector / Industry | Public Security (Police) Industry Standard (Recommended) | | Classification of Chinese Standard | Q87 | | Classification of International Standard | 93.080.79 | | Word Count Estimation | 38,352 | | Date of Issue | 18/12/2020 | | Date of Implementation | 1/5/2021 | | Older Standard (superseded by this standard) | GA/T 515.3-2011 | | Issuing agency(ies) | Ministry of Public Security |
GA/T 515.3-2020: Specifications for the design of public security traffic command system - Part 3: City public security traffic command system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Design Specification for Public Security Traffic Command System - - Part 3.Urban Public Security Traffic Command System)
ICS 93.080.79
CCSQ87
Public Safety Industry Standards of the People's Republic of China
Replace GA/T 515.3-2011
Design Specification for Public Security Traffic Command System
Part 3.Urban Public Security Traffic Command System
2020-12-18 release
2021-05-01 implementation
Issued by the Ministry of Public Security of the People's Republic of China
Table of contents
Foreword Ⅰ
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 2
4 Design requirements 2
Appendix A (informative) Design task book 9
Appendix B (Normative) Technical proposal requirements for preliminary design 10
Appendix C (informative) Engineering design fee calculation method 30
References 32
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
This document is the third part of GA/T 515 "Code for Design of Public Security Traffic Command System". GA/T 515 has released the following parts.
---Part 1.General Provisions;
---Part 2.Provincial (Autonomous Region) Public Security Traffic Command System;
---Part 3.Urban Public Security Traffic Command System;
---Part 4.Drawing.
This document replaces GA/T 515.3-2011 "Public Security Traffic Command System Design Specification Part 3.Urban Public Security Traffic Command System
Compared with GA/T 515.3-2011, in addition to structural adjustments and editorial changes, the main technical changes are as follows.
a) Changed the "scope" (see Chapter 1, Chapter 1 of the.2011 edition);
b) The "normative references" (see Chapter 2, Chapter 2 of the.2011 edition) have been changed;
c) Changed "Terms and Definitions" (see Chapter 3, Chapter 3 of the.2011 edition);
d) Changed the "Preparation of Design Tasks" (see 4.2, 4.2 of the.2011 edition);
e) The survey requirements for "road traffic conditions" have been changed (see 4.3.2.1, 4.3.2 of the.2011 edition);
f) The survey requirements of "Traffic Management Situation" are changed (see 4.3.2.2, 4.3.3 of the.2011 edition)
g) The investigation requirements of "Public Security Traffic Management Mechanism" have been added (see 4.3.2.3);
h) The survey requirements of "Public Security Traffic Management Technology Construction" are changed (see 4.3.3.1, 4.3.4.1 of the.2011 edition);
i) The investigation requirements of "Science and Technology Construction and Application of Other Public Security Departments" have been added (see 4.3.3.2);
j) The survey requirements of "Science and Technology Construction of Related Units" are changed (see 4.3.3.3, 4.3.4.2 of the.2011 edition);
k) Deleted the content of the "investigation report" (see 4.3.6 of the.2011 edition);
l) The survey requirements of "Outfield Survey" are changed (see 4.4.1, 4.4.1 of the.2011 edition)
m) The survey requirements of "Command Center Survey" are changed (see 4.4.2, 4.4.2 of the.2011 edition);
n) Deleted the content of "Site Investigation Report" (see 4.4.3 of the.2011 edition);
o) The requirement of "research report" has been added (see 4.5);
p) The requirements of "Preliminary Design Basis" are changed (see 4.6.1, 4.5.1 of the.2011 edition);
q) The requirements of "Preliminary Design Technical Scheme" are changed (see 4.6.2.1, 4.5.2.1 of the.2011 edition);
r) The requirements of "drawing composition" are changed (see 4.6.2.2.1, 4.5.2.2.1 of the.2011 edition);
s) The requirements of "project estimate" are changed (see 4.6.2.4, 4.5.2.4 of the.2011 edition);
t) The requirements of "Preliminary Design Review" are changed (see 4.6.3, 4.5.3 of the.2011 edition);
u) The requirements of "design basis for construction drawings" are changed (see 4.7.1, 4.6.1 of the.2011 edition);
v) The requirements of "Technical Description of Construction Design" are changed (see 4.7.2.1, 4.6.2.1 of the.2011 edition);
w) The requirements of "Construction Drawing Design Drawing" are changed (see 4.7.2.2, 4.6.2.2 of the.2011 edition);
x) The requirement of "project budget" has been added (see 4.7.2.4);
y) Added "design task book" (see Appendix A);
z) Changed the "Requirements for the Preliminary Design Technical Scheme" (see Appendix B, Appendix A of the.2011 edition);
aa) Added "Engineering Design Cost Calculation Method" (see Appendix C).
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed and managed by the National Road Traffic Management Standardization Technical Committee (SAC/TC576).
Drafting organizations of this document. Traffic Management Research Institute of the Ministry of Public Security, Wuhan Municipal Public Security Bureau Traffic Management Bureau, Wuxi Municipal Public Security Bureau Traffic Police
Detachment, Jintan City Public Security Bureau Traffic Police Brigade, Wuxi Huatong Intelligent Transportation Technology Development Co., Ltd.
The main drafters of this document. Qiu Hongtong, Feng Chunfang, Gu Jiayue, Zhu Zibo, Zhao Yangyang, Li Biao, Dong Kaifan, Zhang Jianhua, Yang Hao, Wang Dashuang,
Chen Shuai, Dong Keran, Qi Xingzhi, Gao Shutao.
The previous versions of this document and the documents replaced are as follows.
---First released in.2011 as GA/T 515.3-2011;
---This is the first revision.
Introduction
The public security traffic command system applies intelligent traffic technology and methods to systematically, efficiently, comprehensively and scientifically manage road traffic, which is a solution
The important way of road traffic problems has become a hotspot of international and domestic research. The design work is the construction of the public security traffic command system
The key links and necessary procedures directly affect the construction quality of the entire project. In order to standardize the design of my country’s public security traffic command system,
Set relevant standards for the design of the public security traffic command system, so as to better guide the construction of the project, and continuously improve the application of public security traffic command system.
level. The "Code for Design of Public Security Traffic Command System" aims to determine the overall framework, main content and design of different types of public security traffic command systems.
Depth requirements, etc., are planned to consist of four parts.
---Part 1.General Provisions. The purpose is to establish the general principles and principles applicable to the design of the public security traffic command system.
Claim.
---Part 2.Provincial (Autonomous Region) Public Security Traffic Command System. The purpose is to design the provincial (autonomous region) public security traffic command system
The work establishes the work content and work requirements at different stages.
---Part 3.Urban Public Security Traffic Command System. The purpose is to establish a difference for the design of the urban public security traffic command system.
The work content and work requirements of the stage.
---Part 4.Drawing. The purpose is to establish the classification, requirements and drawing methods of the engineering design drawing of the public security traffic command system.
In order to standardize and guide the design of the urban public security traffic command system, my country issued GA/T 515.3-2011 "Public
Safety Traffic Command System Design Specification Part 3.Urban Public Security Traffic Command System, which stipulates the design of the urban public security traffic command system
Process and content and preliminary design technical plan requirements. It has been 8 years since GA/T 515.3-2011 was released and implemented.
The business needs of the public security have changed greatly, and the related technologies of the public security traffic command system have developed rapidly. The standard content is in line with the current public security traffic command system design requirements.
Ask for incompatibility, and the professional terminology, system function requirements, system interface requirements, etc. of relevant national or industry standards that have been revised
There are inconsistencies. In view of this, it is indeed necessary to revise and improve GA/T 515.3-2011 to continuously adapt to new changes in relevant standards and business
The new management requirements ensure the overall coordination of the relevant standards of the public security traffic command system.
Design Specification for Public Security Traffic Command System
Part 3.Urban Public Security Traffic Command System
1 Scope
This document specifies the design requirements of the urban public security traffic command system.
This document is applicable to the design of urban public security traffic command system.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 2887 General Specification for Computer Site
GB 14887 Road Traffic Signal Light
GB/T 21255 Motor Vehicle Speedometer
GB/T 22239 Information Security Technology Network Security Level Protection Basic Requirements
GB 23826 Highway LED Variable Speed Limit Sign
GB 25280 road traffic signal control machine
GB/T 28181 Technical Requirements for Information Transmission, Exchange and Control of Public Security Video Surveillance Networking System
GB/T 35658 Technical requirements for the platform of the satellite positioning system for road transport vehicles
GB/T 35786 General Specification for Reading and Writing Equipment of Motor Vehicle Electronic Identification
GB/T 35787 Safety Technical Requirements for Reading and Writing Equipment of Motor Vehicle Electronic Identification
GB/T 35788 Safety Technical Requirements for Motor Vehicle Electronic Identification
GB/T 35789.1 General Specification for Motor Vehicle Electronic Marking Part 1.Automobile
GB 50034 Architectural Lighting Design Standard
GB 50174 Data Center Design Specification
GB 50217 Power Engineering Cable Design Code
GB 50311 Code for Design of Generic Cabling System Engineering
GB 50343 Technical Specification for Lightning Protection of Building Electronic Information System
GB 50370 Code for Design of Gas Fire Extinguishing System
GB 50395 Video Security Monitoring System Engineering Design Code
GB 50396 Engineering Design Code for Entrance and Exit Control System
GB 50736 Civil Building Heating Ventilation and Air Conditioning Design Code
GB 50898 Technical Specification for Water Mist Fire Extinguishing System
GA/T 484 LED Road Traffic Guidance Variable Information Sign
GA/T 489 Road Traffic Signal Controller Installation Specification
GA/T 496 General technical conditions for automatic red light recording system
GA/T 497 General technical requirements for intelligent monitoring and recording system of road vehicles
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 515.3-2020_English be delivered?Answer: Upon your order, we will start to translate GA/T 515.3-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA/T 515.3-2020_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 515.3-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GA/T 515.3-2020?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GA/T 515.3-2020 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|