|
US$599.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 515.2-2019: Specifications for the design of public security traffic command system -- Part 2: Public security traffic command system for provinces and autonomous regions Status: Valid GA/T 515.2: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GA/T 515.2-2019 | English | 599 |
Add to Cart
|
5 days [Need to translate]
|
Specifications for the design of public security traffic command system -- Part 2: Public security traffic command system for provinces and autonomous regions
| Valid |
GA/T 515.2-2019
|
| GA/T 515.2-2011 | English | 839 |
Add to Cart
|
4 days [Need to translate]
|
Specifications for the design of public security traffic command system. Part 2: Province (autonomous region) public security traffic command system
| Obsolete |
GA/T 515.2-2011
|
PDF similar to GA/T 515.2-2019
Basic data | Standard ID | GA/T 515.2-2019 (GA/T515.2-2019) | | Description (Translated English) | Specifications for the design of public security traffic command system -- Part 2: Public security traffic command system for provinces and autonomous regions | | Sector / Industry | Public Security (Police) Industry Standard (Recommended) | | Classification of Chinese Standard | Q87 | | Classification of International Standard | 93.080.79 | | Word Count Estimation | 26,246 | | Date of Issue | 2019 | | Date of Implementation | 2020-01-01 | | Issuing agency(ies) | Ministry of Public Security |
GA/T 515.2-2019: Specifications for the design of public security traffic command system -- Part 2: Public security traffic command system for provinces and autonomous regions ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specifications for the design of public security traffic command system - Part 2.Public security traffic command system for provinces and autonomous regions
ICS 93.080.79
Q87
Public Safety Industry Standard of the People's Republic of China
Replace GA/T 515.2-2011
Code for design of public security traffic command system
Part 2.Provincial (autonomous region) public security traffic command system
Published on October 31,.2019
2020-01-01 implementation
Issued by the Ministry of Public Security of the People's Republic of China
Contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Design requirements 2
Appendix A (Normative Appendix) Preliminary Design Technical Scheme Requirements 8
Reference 20
Foreword
GA/T 515 "Code for Design of Public Security Traffic Command System" is divided into the following parts.
---Part 1.General Provisions;
---Part 2.Provincial (autonomous region) public security traffic command system;
---Part 3.Urban Public Security Traffic Command System;
---Part 4.Drawing;
This part is part 2 of GA/T 515.
This section was drafted in accordance with the rules given in GB/T 1.1-2009.
This part replaces GA/T 515.2-2011 "Code for Design of Public Security Traffic Command System Part 2.Provincial (Autonomous Region) Public Security Traffic Guide
Swing System". Compared with GA/T 515.2-2011, except for editorial changes, the main technical changes are as follows.
--- Modify the "Scope" (see Chapter 1, Chapter 1 of the.2011 edition);
--- Modify the "normative references" (see Chapter 2, Chapter 2 of the.2011 edition);
--- Revised "Terms and Definitions" (see Chapter 3, Chapter 3 of the.2011 edition);
--- Added the term "integrated application platform" (see 3.1);
--- Added the term "application support system" (see 3.2);
--- Added the term "operational support system" (see 3.3);
--- Added the term "basic supporting facilities" (see 3.4);
--- Revised "Compile Design Task Book" (see 4.2, version 4.2 in.2011);
--- Revised the survey requirements for "Basic Situations of Provinces (Autonomous Regions)" (see 4.3.1, 4.3.1 of the.2011 edition);
--- Revised the "road conditions" investigation requirements (see 4.3.2.1, the.2011 version of 4.3.2.1);
--- Increased the "road traffic safety situation" investigation requirements (see 4.3.2.2);
--- Increased the "road traffic operation status" investigation requirements (see 4.3.2.3);
--- Amended the investigation requirements of "Public Security Traffic Management System Situation" (see 4.3.2.4, the.2011 edition of 4.3.2.2);
--- Added the investigation requirements of "Public Security Traffic Management Mechanism Situation" (see 4.3.2.5);
--- Modify the investigation requirements of "Provincial (Autonomous Region) Highway Traffic Management Measures" (see 4.3.3,.2011 version 4.3.3);
--- Revised the investigation requirements of "Provincial (Autonomous Region) Public Security Traffic Management Technology Construction" (see 4.3.4.1, 4.3.4.1 of the.2011 edition);
--- Added the investigation requirements of "Science and Technology Construction of Public Security Traffic Management in Districts (Regions, States, Leagues)" (see 4.3.4.2);
--- Added the investigation requirements of "Science and Technology Construction of Other Public Security Departments" (see 4.3.4.3);
--- Added the investigation requirements of "Science and Technology Construction of Related Units" (see 4.3.4.4);
--- Modify the requirements of "Site Investigation of Construction Site" (see 4.4, 4.4 in.2011 edition);
--- Removed the requirements of "Survey Command Center Situation", "Front-end Site Investigation" and "Site Investigation Report" (see 4.4.1 of the.2011 edition)
4.4.2, 4.4.3);
--- Added the requirement of "investigation report" (see 4.5);
--- Revised the content of "Preliminary Design Basis" (see 4.6.1, version 4.5.1 of.2011 edition);
--- Modify the requirements of "Preliminary Design Technical Scheme" (see 4.6.2.1, 4.5.2.1 of.2011 edition);
--- Modify the requirements of "Preliminary Design Drawing Composition" (see 4.6.2.2.1,.2011 version 4.5.2.2.1);
--- Revised the content of "Preliminary Design Estimates" (see 4.6.2.4, 4.5.2.4 of the.2011 edition);
--- Modify the requirements of "Preliminary Design Review" (see 4.6.3, version 4.5.3 of the.2011 edition);
--- Modify the requirements of "Design basis for construction drawings" (see 4.7.1, 4.6.1 of the.2011 edition);
--- Modify the requirements of "Construction Design Technical Scheme" (see 4.7.2.1, 4.6.2.1 of.2011 edition);
--- Modify the requirements of "Construction drawing design drawings" (see 4.7.2.2, 4.6.2.2 of.2011 edition);
--- Revised the content of "Design Requirements for Equipment and Materials" (see 4.7.2.3, 4.6.2.3 of the.2011 edition);
--- Added the content of "Construction Drawing Budget" (see 4.7.2.4);
--- Modified Appendix A (see Appendix A, Appendix A of the.2011 edition).
This part is proposed and managed by the National Road Traffic Management Standardization Technical Committee (SAC/TC576).
This section was drafted. Traffic Management Science Institute of the Ministry of Public Security, Traffic Police Corps of Guangdong Provincial Public Security Department, Traffic Police of Shanxi Provincial Public Security Department
General Corps, Wuxi Huatong Intelligent Transportation Technology Development Co., Ltd.
The main drafters of this section. Li Biao, Dong Kaifan, Feng Chunfang, Zhu Zibo, Dong Keran, Miao Jianxin, Gu Jiayue, Zhang Keng, Cai Gang, Yang Yuexiang,
Wang Qinfeng, Qiu Hongtong, Lu Zhenyi.
The previous releases of this section are.
---GA/T 515.2-2011.
Code for design of public security traffic command system
Part 2.Provincial (autonomous region) public security traffic command system
1 Scope
This part of GA/T 515 stipulates the design requirements and preliminary design technical plan requirements of the provincial (autonomous region) public security traffic command system.
This section applies to the design of provincial (autonomous region) public security traffic command systems.
2 Normative references
The following documents are essential for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For the cited documents without date, the latest version (including all amendments) applies to this document.
GB/T 2887 General specification for computer field
GB/T 22239 Information Security Technology Network Security Level Protection Basic Requirements
GB/T 28181 Technical requirements for information transmission, exchange and control of public security video surveillance networking system
GB 50034 Architectural Lighting Design Standard
GB 50174 Data Center Design Specification
GB 50217 Power Engineering Cable Design Code
GB 50311 Engineering Design Code of Integrated Wiring System
GB 50343 Lightning Protection Technical Specification for Building Electronic Information System
GB 50370 Code for design of gas fire extinguishing system
GB 50395 video security monitoring system engineering design specification
GB 50396 Engineering Design Code for Access Control System
GB 50736 Design Code for Heating, Ventilation and Air Conditioning of Civil Buildings
GB 50898 Technical Specification for Water Mist Fire Extinguishing System
GA/T 515.1 Design Code for Public Security Traffic Command System Part 1.General Provisions
GA/T 515.4 Public Security Traffic Command System Design Code Part 4.Drawing
GA/T 1049 (all parts) communication protocol for integrated command platform of public security traffic
GA/T 1389 Information Security Technology Network Security Level Protection Rating Guidelines
YD/T 5024 SDH local network optical cable transmission engineering design specification
YD5102 Communication Line Engineering Design Code
YD5137 Local Communication Line Engineering Design Code
3 Terms and definitions
The terms and definitions defined in GA/T 515.1 and the following apply to this document.
3.1
Integrated application platform
An application software system integrating road traffic monitoring, decision-making, control and service.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 515.2-2019_English be delivered?Answer: Upon your order, we will start to translate GA/T 515.2-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA/T 515.2-2019_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 515.2-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GA/T 515.2-2019?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GA/T 515.2-2019 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|