US$559.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 514-2004: Rules of engineering acceptance of TV monitoring system for traffic
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GA/T 514-2004 | English | 559 |
Add to Cart
|
4 days [Need to translate]
|
Rules of engineering acceptance of TV monitoring system for traffic
| |
GA/T 514-2004
|
PDF similar to GA/T 514-2004
Basic data | Standard ID | GA/T 514-2004 (GA/T514-2004) | | Description (Translated English) | Rules of engineering acceptance of TV monitoring system for traffic | | Sector / Industry | Public Security (Police) Industry Standard (Recommended) | | Classification of Chinese Standard | R87 | | Classification of International Standard | 03.220.20 | | Word Count Estimation | 16,145 | | Date of Issue | 2004-09-16 | | Date of Implementation | 2005-01-01 | | Quoted Standard | GB/T 15412-1994; GB/T 16572-1996; GB 50198-1994; SJ/T 10603-1994 | | Summary | This standard stipulates the basis, purpose, condition, organization and duty, procedure, content, conclusion, rectification and transfer of project acceptance of traffic TV surveillance system. This standard is applicable to the acceptance of traffic TV surveillance system engineering. |
GA/T 514-2004: Rules of engineering acceptance of TV monitoring system for traffic---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Rules of engineering acceptance of TV monitoring system for traffic
ICS 03.220.20
R87
People's Republic of China Public Safety Industry Standard
Traffic TV monitoring system engineering acceptance specification
Released on.2004-09-16
2005-01-01 implementation
Ministry of Public Security
Content
Foreword III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 basis and purpose 1
5 Acceptance conditions 1
6 Acceptance organization and responsibilities 3
7 Acceptance procedure 3
8 Acceptance content 3
9 Acceptance Report 4
10 monitoring system handover 5
Appendix A (Normative Appendix) Traffic TV Monitoring System Engineering Acceptance Form 6
Reference 13
Foreword
This standard is proposed and managed by the Ministry of Public Security Road Traffic Management Standardization Technical Committee.
This standard was drafted by the Traffic Management Science Research Institute of the Ministry of Public Security.
The main drafters of this standard. Yan Jianxin, Yuan Lei, Qiu Hongtong, Lu Zhenyi, Lu Liqiang.
Traffic TV monitoring system engineering acceptance specification
1 Scope
This standard stipulates the basis, purpose, conditions, organization and responsibilities, procedures, contents, conclusions and integrity of the traffic television monitoring system project acceptance.
Change, transfer, etc.
This standard applies to the acceptance of traffic television monitoring system engineering.
2 Normative references
The terms in the following documents become the terms of this standard by reference to this standard. All dated references, followed by all
Modifications (not including errata content) or revisions do not apply to this standard, however, parties to agreements based on this standard are encouraged to study
Is it possible to use the latest version of these files? For undated references, the latest edition applies to this standard.
GB/T 15412-1994 General technical conditions for the application of TV cameras
GB/T 16572-1996 burglar alarm center console
GB 50198-1994 Engineering technical specification for civil closed-circuit surveillance television system
SJ/T 10603-1994 General technical conditions for color monitors
3 Terms and definitions
The following terms and definitions apply to this standard.
3.1
Surveillance in the field of public security traffic management consisting of camera equipment, display equipment, control equipment transmission equipment and storage equipment
system.
3.2
Classification of evaluation of image quality.
4 basis and purpose
4.1 Acceptance basis
Contract (including bidding documents, bid documents), design documents, laws and regulations and related standards.
4.2 Acceptance purposes
Determine the degree of compliance between the monitoring system engineering and the acceptance basis.
5 Acceptance conditions
Before the system is accepted, it shall go through the trial operation, technical training and other processes, and submit the completion report and submit the acceptance documents.
5.1 Test run
After the commissioning of the monitoring system is commissioned, the test run is required according to the contract and the test run record is prepared (see Appendix A, Table A.1). Operation result is set
The requirements are approved by the construction unit and the supervision/project management unit and a trial operation report is submitted based on the test operation record. content include.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 514-2004_English be delivered?Answer: Upon your order, we will start to translate GA/T 514-2004_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA/T 514-2004_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 514-2004_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|