|
US$739.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GA 793.2-2008: Conformity assessment of city area monitoring and alarming network system--Part 2: Testing specification of management platform softweare
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GA 793.2-2008 | English | 739 |
Add to Cart
|
4 days [Need to translate]
|
Conformity assessment of city area monitoring and alarming network system--Part 2: Testing specification of management platform softweare
| |
GA 793.2-2008
|
PDF similar to GA 793.2-2008
Basic data | Standard ID | GA 793.2-2008 (GA793.2-2008) | | Description (Translated English) | Conformity assessment of city area monitoring and alarming network system--Part 2: Testing specification of management platform softweare | | Sector / Industry | Public Security (Police) Industry Standard | | Classification of Chinese Standard | A91 | | Classification of International Standard | 13.310 | | Word Count Estimation | 21,258 | | Date of Issue | 2008-08-04 | | Date of Implementation | 2008-08-04 | | Quoted Standard | GB/T 8567-2006; GA/T 669.1-2008; GA/T 669.2-2008; GA/T 669.7-2008 | | Issuing agency(ies) | Ministry of Public Security | | Summary | This standard stipulates the procedures, methods, procedures and criteria for the software testing of the network management system of the city monitoring and alarming network, which is used to guide the development side to develop the management platform software and guide the testing party to test the management platform software, To effectively guarantee the quality of software products. This standard is applicable to the testing and quality assessment of the management platform software of city monitoring and alarming networking system. |
GA 793.2-2008: Conformity assessment of city area monitoring and alarming network system--Part 2: Testing specification of management platform softweare ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Conformity assessment of city area monitoring and alarming network system - Part 2. Testing specification of management platform softweare
ICS 13.310
A91
People's Republic of China Public Security Industry Standards
Urban network alarm monitoring system conformity assessment
Part 2. Test Specification Management Platform software
Posted 2008-08-04
2008-08-04 implementation
People's Republic of China Ministry of Public Security
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Basic requirements 3
5 Test Procedure 3
5.1 acceptance test 3
5.2 Test Preparation 3
Description 3 5.3 Test Environment
5.4 Test Tool 3
5.5 Category 3 test cases
5.6 Test Results and Treatment 3
6 Software Functional Test and Evaluation Method 3
6.1 Software Installation Test 3
6.2 application module and application integration module test 4
7 security testing and evaluation methods 12
8 Software Reliability Test and Evaluation 13
9 software usability testing and evaluation methods 14
10 Software Efficiency Test and Evaluation Method 15
11 software maintainability testing and evaluation methods 15
12 software portability testing and evaluation methods 16
13 user documentation Testing and Evaluation Method 16
References 18
Foreword
Please note that elements of this section GA 793 has the potential to involve patents, this part of the release mechanism should not bear the identification of these patents
Responsibility.
GA 793 "urban network alarm monitoring system conformity assessment" is divided into three parts.
--- Part 1. System function test performance specifications;
--- Part 2. Test Specification management software platform;
--- Part 3. System acceptance.
This section is part of the 2 GA 793.
This part is proposed by the Ministry of Public Security Technology Bureau.
This part of the National Security Alarm System Standardization Technical Committee (SAC/TC100) centralized.
This section drafted by. National Security Alarm System Product Quality Supervision and Inspection Center (Beijing), Ministry of Public Security First Research Institute, China
Shanghai Research Institute of Telecommunications, Alcatel Shanghai Bell Co., Ltd., Hangzhou H3C Technologies Co., Ltd.
The main drafters of this section. Zheng Zheng, Hu Ang, Shiju Ling, Liu Jun, Tang Meng, Zheng Zemin, Zhang Peng, Wang increase.
Urban network alarm monitoring system conformity assessment
Part 2. Test Specification Management Platform software
1 Scope
The provisions of section GA 793 urban network alarm monitoring system (network system) management platform software testing procedures, methods,
Processes and decision criteria to guide management platform software developer for developing and guiding the tested party management platform software for testing to
Effectively guarantee the quality of software products.
This section applies to testing and quality urban network alarm monitoring system management platform software evaluation.
2 Normative references
The following documents contain provisions which, through reference in this GA 793 constitute provisions of this part. For dated references,
All subsequent amendments (not including errata content) or revisions do not apply to this section, however, encourage the agreement on this section
Whether the parties can study the latest versions of these documents. For undated reference documents, the latest versions apply to this section.
GB/T 8567-2006 computer software documentation
GA/T 669.1-2008 urban network alarm monitoring system of technical standards - Part 1. General technical requirements
GA/T 669.2-2008 urban network alarm monitoring system of technical standards for Part 2. Safety requirements
GA/T 669.7-2008 urban network alarm monitoring system technology standards - Part 7. Requirements management platform technology
3 Terms and Definitions
GA/T 669.1-2008 established in the following terms and definitions apply to this section.
3.1
All or part of the program information processing system, a collection of procedures, rules, and any related documents.
[GB/T 5271.1-2000, 01.01.08 term does not include injection]
3.2
Urban network alarm monitoring system, the core management software, a variety of information resources, video, audio, alarm and other networking within the system set
And a processing device networking system, user, network, security, business and other integrated management, networked system as defined in the relevant
Features.
3.3
By a given product, process or measured in accordance with procedures and services of one or more characteristics of the technical operation.
[GB/T 17544-1998, Appendix A4.1]
3.4
Complete set of documents in print or non-print form obtained provides user documentation in favor of application of the product and the product is
An essential part.
[GB/T 17544-1998,2.4]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA 793.2-2008_English be delivered?Answer: Upon your order, we will start to translate GA 793.2-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GA 793.2-2008_English with my colleagues?Answer: Yes. The purchased PDF of GA 793.2-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|