HOME   Cart(3)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GA 518-2004 English PDF

US$759.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GA 518-2004: Installation regulation for transparency protect barrier in bank business places
Status: Obsolete
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GA 518-2004English759 Add to Cart 4 days [Need to translate] Installation regulation for transparency protect barrier in bank business places Obsolete GA 518-2004

PDF similar to GA 518-2004


Standard similar to GA 518-2004

GB 8108   GA 1051   GB 10408.3   GA/T 761   GA/T 841   GA 586   

Basic data

Standard ID GA 518-2004 (GA518-2004)
Description (Translated English) Installation regulation for transparency protect barrier in bank business places
Sector / Industry Public Security (Police) Industry Standard
Classification of Chinese Standard A91
Classification of International Standard 13.310
Word Count Estimation 19,198
Date of Issue 2004-10-18
Date of Implementation 2004-12-01
Quoted Standard GB/T 14683; GB 50210; GB 50221; GBJ 10; GBJ 17; GA 38; GA 165-1997; JGJ 18; JGJ 103
Summary This standard specifies the basic requirements, transparent protective barrier design, construction, installation, acceptance of the basic basis. This standard is applicable to the installation and modification of the transparent protective barrier in the cash register of the bank business premises. Other financial business premises to install and modify the transparent protective barrier can refer to the implementation (hereinafter referred to as a transparent protective barrier for the protective barrier).

GA 518-2004: Installation regulation for transparency protect barrier in bank business places

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Installation regulation for transparency protect barrier in bank business places ICS 13.310 A91 People's Republic of China Public Safety Industry Standard Bank business premises transparent protective barrier installation specification Released on October 10,.2004 Implementation of.2004-12-01 Ministry of Public Security

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Basic requirements 1 5 Installation requirements 3 6 Acceptance 4 7 handover 5 Appendix A (informative) Structural form of transparent protective barrier 7 Appendix B (informative) Transparent protective barrier installation engineering form (style) 13

Foreword

The full technical content of this standard is mandatory. Appendix A and Appendix B of this standard are informative annexes. This standard is proposed and managed by the National Security and Alarm System Standardization Technical Committee (SAC/TC100). This standard consists of the Henan Provincial Public Security Department Safety Technology Prevention Office, Sichuan Provincial Public Security Department Safety Technology Prevention Office, Chengdu City, Sichuan Province Great Wall Special Glass Factory jointly drafted. The main drafters of this standard. Zuo Tieliang, Yan Wei, Xie Fuyuan, Tian Jing, Shi Juling, Huang Jiming. Bank business premises transparent protective barrier installation specification

1 Scope

This standard puts forward the basic requirements for the installation of transparent protective barriers for bank business premises. It is the design, construction, installation and inspection of transparent protective barriers. The basic basis for receipt. This standard applies to the installation and modification of the transparent protective barrier of the cashier counter in the bank's business premises. Other financial business premises installation Refer to the implementation when modifying the transparent protective barrier. (The transparent protective barrier is referred to as the protective barrier below)

2 Normative references

The terms in the following documents become the terms of this standard by reference to this standard. All dated references, followed by all Modifications (not including errata content) or revisions do not apply to this standard, however, parties to agreements based on this standard are encouraged to Whether the latest version of these files can be used. For undated references, the latest edition applies to this standard. GB/T 14683 Silicone Building Sealant GB 50210 Building Decoration Engineering Quality Acceptance Specification GB 50221 Steel Structure Engineering Quality Inspection and Evaluation Standard GB J10 concrete structure design specification GB J17 steel structure design specification GA 38 Bank Business Location Risk Level and Protection Level Regulations GA 165-1997 bulletproof composite glass JGJ18 steel bar welding and acceptance procedures JGJ103 Plastic Door and Window Installation and Acceptance Specifications

3 Terms and definitions

The following terms and definitions established in GA 38 and GA 165-1997 apply to this standard. 3.1 A barrier with integral protection that consists of a transparent fender, frame and counter (base).

4 basic requirements

4.1 Development of the installation plan The installation plan shall be jointly formulated by the construction unit and installation unit of the protective barrier. Site surveys should be conducted prior to the development of the installation plan. 4.1.1 General requirements The installation plan should design the protective barrier as a relatively independent safety precaution and integrate with the building in its location. As one. The installation plan should have the prescribed procedures and complete drawings and materials. The protective barrier shall not affect the normal business of the place where it is located; if it is installed or is considering installation in its premises For his safety devices, the protective barrier should form a common protection with these devices. 4.1.2 Protection requirements The ballistic resistance of the protective barrier shall not be lower than the requirements of F79B in GA 165-1997, and it shall be protected against violent shocks, explosions, etc.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GA 518-2004_English be delivered?

Answer: Upon your order, we will start to translate GA 518-2004_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GA 518-2004_English with my colleagues?

Answer: Yes. The purchased PDF of GA 518-2004_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.