GA 1814.3-2023: Requirements for counter-terrorism of railway system - Part 3: Lines in operation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GA 1814.3-2023English289 Add to Cart 3 days [Need to translate] Requirements for counter-terrorism of railway system - Part 3: Lines in operation Valid GA 1814.3-2023

PDF similar to GA 1814.3-2023


Standard similar to GA 1814.3-2023

GA/T 1788.2   GB 8108   GB 10408.3   GA 1814.2   GA 1814.4   GA 1814.1   

Basic data

Standard ID GA 1814.3-2023 (GA1814.3-2023)
Description (Translated English) Requirements for counter-terrorism of railway system - Part 3: Lines in operation
Sector / Industry Public Security (Police) Industry Standard
Classification of Chinese Standard A91
Classification of International Standard 13.310
Word Count Estimation 14,124
Date of Issue 2023-02-28
Date of Implementation 2023-07-01
Issuing agency(ies) Ministry of Public Security

GA 1814.3-2023: Requirements for counter-terrorism of railway system - Part 3: Lines in operation


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 13:310 CCSA91 Public safety industry standards of the People's Republic of China Anti-terrorism prevention requirements for railway systems Part 3: Operational lines Part 3:Linesinoperation Published on 2023-02-28 2023-07-01 Implementation Released by the Ministry of Public Security of the People's Republic of China

Table of contents

PrefaceⅠ Introduction II 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Key objectives and key parts 2 5 Key target levels and prevention levels 3 6 Overall prevention requirements 3 7 Normal secondary prevention requirements 4 8 Normal level one prevention requirements 5 9 Abnormal prevention requirements 6 10 Technical requirements for security systems 6 Appendix A (Normative) Configuration of normal prevention facilities for operating lines 8 Reference 10

Foreword

This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document is Part 3 of GA 1814-2023 "Anti-Terrorism Prevention Requirements for Railway Systems": GA 1814-2023 has been released with Lower part: ---Part 1: Passenger transport station; ---Part 2: Passenger trains; ---Part 3: Operation lines; ---Part 4: Key places; ---Part 5: Transport of dangerous goods: This document is sponsored by the Office of the National Anti-Terrorism Leading Group, China State Railway Group Co:, Ltd:, Counter-Terrorism Bureau of the Ministry of Public Security, and the Ministry of Public Security: Proposed by the Railway Public Security Bureau and the Science and Technology Information Bureau of the Ministry of Public Security: This document is under the jurisdiction of the National Security Alarm System Standardization Technical Committee (SAC/TC100): This document was drafted by: China State Railway Group Co:, Ltd:, Counter-Terrorism Bureau of the Ministry of Public Security, Railway Public Security Bureau of the Ministry of Public Security, Science and Technology Information Technology of the Ministry of Public Security Bureau of Information and Chemical Industry, Railway Police Academy, Guangzhou Railway Public Security Bureau, Chengdu Railway Public Security Bureau, Jinan Railway Public Security Bureau, China Academy of Railway Sciences Group Ltd: The main drafters of this document: Lin Xiaodong, Hu Xiaohui, Zhao Xinbin, Lu Ping, Li Sheng, He Hengpan, Chen Ziqing, Shen Guanfu, Wu Xiangxing, Zhou Kai, Zhang Zongyuan, Li Dongdong, Sun Tao, Yang Yubo, Gao Feng, Tian Chuan, Zhang Zhengwei, Wang Shuhua, Lan Lihong, Liu Hui, Wang Zhanjun, Li Mingming, Li Jingshan, Zhou Rui, Liu Jinghui, Ji Jinglin:

Introduction

Railway is the main artery of the national economy and an important infrastructure of the country: It plays an important role in the sustained, rapid and high-quality development of the national economy: the supporting role: In order to establish a long-term mechanism for anti-terrorism prevention in the railway system and improve the ability and level of anti-terrorism prevention in the railway system, according to the "China The Anti-Terrorism Law of the People's Republic of China and other relevant laws, regulations and normative documents, and GA 1814-2023 "Anti-Terrorism Prevention and Control for Railway Systems" was formulated: Standard Requirements" series of standards: GA 1814-2023 implements anti-terrorism prevention regulations for key target management units in preventing terrorist attacks in the railway system: This provides a basis for relevant departments to supervise and inspect the implementation of anti-terrorism prevention responsibilities by key target management units: According to the specific structure and scene of the railway, the key targets and key parts of preventing terrorist attacks, and the needs of the current anti-terrorist situation According to requirements, GA 1814-2023 "Anti-Terrorism Prevention Requirements for Railway Systems" is divided into 5 parts: passenger stations, passenger trains, operating lines, and key sites: , transportation of dangerous goods: ---Part 1: Passenger station: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities at passenger stations in the railway system: ---Part 2: Passenger trains: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities for passenger trains in the railway system: ---Part 3: Operational lines: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities for railway system operating lines: ---Part 4: Key places: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities in key places on the railway system: ---Part 5: Transport of dangerous goods: The purpose is to provide information for the implementation of anti-terrorism prevention responsibilities for the transportation of dangerous goods in the railway system: in accordance with: Anti-terrorism prevention requirements for railway systems Part 3: Operational lines

1 Scope

This document stipulates the key objectives and key parts of anti-terrorism prevention on operational lines, the level of key objectives and prevention levels, and the overall prevention requirements: requirements, normal second-level prevention requirements, normal first-level prevention requirements, abnormal prevention requirements and security prevention system technical requirements: This document applies to the anti-terrorism prevention work and management of passenger train operating lines:

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document: GB/T 3836:1 Explosive atmosphere Part 1: General technical requirements for equipment GB 17565-2022 General technical conditions for anti-theft security doors GB/T 32581 Technical requirements for intrusion and emergency alarm systems GB 50348-2018 Safety prevention engineering technical standards GB 55029 General specifications for safety prevention engineering

3 Terms and definitions

The following terms and definitions as defined in GB 50348-2018 apply to this document: 3:1 linesinoperation It consists of tracks, roadbeds, bridges and culverts, tunnels, traction power supply, communication signals and other facilities and equipment outside the station's arrival signal: It has been opened for transportation: A railway line for trains to run at specified speeds: [Source: GB/T 50262-2013, 4:2:1, with modifications] 3:2 important subgrade importantsubgrade The roadbed of complex public security sections requires key protection according to anti-terrorism prevention requirements: 3:3 supermajorbridge Bridges with a length of more than 500m: [Source: GB/T 50262-2013,7:1:5] 3:4 superlongtunnel Tunnels with a length of more than 10,000m:

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GA 1814.3-2023_English be delivered?

Answer: Upon your order, we will start to translate GA 1814.3-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GA 1814.3-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GA 1814.3-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.