HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

FZ/T 92033-2017 English PDF

US$189.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
FZ/T 92033-2017: Suspended flyer of roving
Status: Valid

FZ/T 92033: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
FZ/T 92033-2017English189 Add to Cart 3 days [Need to translate] Suspended flyer of roving Valid FZ/T 92033-2017
FZ/T 92033-2006English319 Add to Cart 3 days [Need to translate] Flyer spindle Obsolete FZ/T 92033-2006
FZ/T 92033-1995English279 Add to Cart 3 days [Need to translate] Roving Suspended Flyer Flyer Obsolete FZ/T 92033-1995

PDF similar to FZ/T 92033-2017


Standard similar to FZ/T 92033-2017

FZ/T 93048.1   FZ/T 93019   FZ/T 92024   FZ/T 92036   FZ/T 92023   

Basic data

Standard ID FZ/T 92033-2017 (FZ/T92033-2017)
Description (Translated English) Suspended flyer of roving
Sector / Industry Spinning & Textile Industry Standard (Recommended)
Classification of Chinese Standard W93
Word Count Estimation 8,876
Date of Issue 2017-04-12
Date of Implementation 2017-10-01
Older Standard (superseded by this standard) FZ/T 92033-2006
Regulation (derived from) Ministry of Industry and Information Technology Bulletin 2017 No. 14; Industry Standard Filing Announcement 2017 No. 8 (Total No. 212)
Issuing agency(ies) Ministry of Industry and Information Technology of the People's Republic of China
Summary This standard specifies the product classification, requirements, test methods, inspection rules and signs, packaging, transportation and storage of roving suspension tablets.

FZ/T 92033-2017: Suspended flyer of roving

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Roving spindles) ICS 59.120.10 W93 People's Republic of China textile industry standards Replacing FZ/T 92033-2006 Roving Suspensions Flyer 2017-04-21 released 2017-10-01 implementation Ministry of Industry and Information Technology of the People's Republic of China

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard replaces FZ/T 92033-2006 "roving spindle spindles", compared with the FZ/T 92033-2006 main technical changes are as follows. --- Marks and parameters added to the range, expanding the scope of the standard (see Chapter 1); --- Removed the "structure type", modified classification, parameters and markers (see Chapter 3,.2006 version Chapter 3); --- Increasing the classification of flyer and pressure palm classification and map (see 3.1.1, 3.1.2 and Figure 2); --- Removed in Table 1 out of the product specifications, an increase of new product specifications (see Table 1,2006 version Table 2); --- Increased in Table 2 Self-descend Suspension spindle Wing spindle, the next spindle code (see Table 2); --- Increased tolerance requirements for spindle and bobbin diameter (see 4.1, version 4.1, 4.1); --- Increased flyer wing remaining imbalance (see 4.4,.2006 version 4.4); --- Raise, add, delete and adjust the open end of the single arm of the relevant flyer in Table 4 (see Table 4,2006 Table 3); --- Increasing the requirements of axial movement of the cuff pressure palm requirements (see 4.8,.2006 version 4.6); --- Increasing the spindle spine under the allocation of the inner radius of rotation with the minimum radius requirements (see 4.10); --- Remove the requirements of the flyer material; --- Improve the relevant sampling single pass rate requirements (see Table 5,2006 version of Table 4); --- Increasing the product single pass rate determination method (see 6.3.3). Please note that some of this document may be patentable. The issuing agencies of this document should not be held responsible for the identification of these patents. This standard proposed by the China Textile Industry Federation. This standard by the National Textile Machinery and Accessories Standardization Technical Committee spinning, dyeing and finishing machinery Technical Committee (SAC/TC215 / SC1) centralized. The main drafting units of this standard. Wuxi Zhongshi Machinery Co., Ltd., Taizhou Huarui Textile Machinery Parts Factory, Qingdao Global Group Co., Ltd. Division, the State Textile Machinery Quality Supervision and Inspection Center, Changzhou Bao-Ren Machinery Co., Ltd., Wuxi Feida Textile Machinery Co., Ltd., Tianjin grand Textile Machinery Co., Ltd., Hebei Taihang Textile Machinery Co., Ltd., Wuxi Hongyuan Electrical Technology Co., Ltd., Changzhou City, with the textile machinery Co., Ltd. The main drafters of this standard.He Zhiming, Hu Tangsong, Wang Chengji, Yuan Jingshan, Xu Xianghong, Bao Renzhong, Yu Jianfang, Feng Guangxuan, Di Hui, Liu Xu Hong, Ding Feng. This standard replaces the standards previously issued as. --- FZ/T 92033-1995, FZ/T 92033-2006. Roving Suspensions Flyer

1 Scope

This standard specifies the product classification, parameters and markings, requirements, test methods, inspection rules, marking, packaging, transportation And storage. This standard applies to cotton, wool, linen and chemical fiber pure spinning or blended spinning suspension spinning spindle (hereinafter referred to as flyer).

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 191 Packaging - Pictorial signs GB/T 9286 Paints and varnishes - Cross-hatch test FZ/T 90001 textile machinery product packaging FZ/T 90074 textile machinery product coating 3 Categories, parameters and tags 3.1 classification 3.1.1 flyer classification 3.1.1.1 According to the bobbin positioning method is divided into the upper spindle (see Figure 1); the lower spindle (see Figure 2). Figure 1 Figure 2

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of FZ/T 92033-2017_English be delivered?

Answer: Upon your order, we will start to translate FZ/T 92033-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of FZ/T 92033-2017_English with my colleagues?

Answer: Yes. The purchased PDF of FZ/T 92033-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version FZ/T 92033-2017?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version FZ/T 92033-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.