Code for the designing of regional groundwater level monitoring network
| Valid |
DZ/T 0271-2014
|
PDF similar to DZ/T 0271-2014
Basic data | Standard ID | DZ/T 0271-2014 (DZ/T0271-2014) | | Description (Translated English) | Code for the designing of regional groundwater level monitoring network | | Sector / Industry | Geological Industry Standard (Recommended) | | Classification of Chinese Standard | D14 | | Classification of International Standard | 07.060 | | Word Count Estimation | 39,370 | | Date of Issue | 12/5/2014 | | Date of Implementation | 1/1/2015 | | Quoted Standard | GB/T 958; GB/T 2260; GB/T 14538; GB 50027-2001; DZ/T 0133-1994; DZ/T 0157 | | Regulation (derived from) | Ministry of Land & Resources Notice 2014 No. 28 | | Issuing agency(ies) | Ministry of Land and Resources | | Summary | This Standard specifies the area of ??data collection and analysis of regional groundwater monitoring network design, monitoring network status of the investigation and evaluation, principles and methods of monitoring network design methods and the result |
DZ/T 0271-2014: Code for the designing of regional groundwater level monitoring network---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code for the designing of regional groundwater level monitoring network
ICS 07.060
D14
People's Republic of China geological mineral industry standard
Design specification for regional groundwater level monitoring network
Released on.2014-12-05
2015-01-01 implementation
Ministry of Land and Resources of the People's Republic of China
Content
Foreword I
Introduction II
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Basic requirements 2
5 Monitoring Area Background Survey 2
6 Regional Groundwater Level Monitoring Network Design 5
7 Results preparation and submission 8
Appendix A (normative appendix) Regional Groundwater Monitoring Network Design Drawing Requirements 9
Appendix B (informative appendix) Hydrogeological background survey content table 16
Appendix C (Normative Appendix) Schedule 21
Appendix D (informative appendix) Design density of regional groundwater level monitoring network 25
Appendix E (informative) Design method for regional groundwater level monitoring frequency 27
Appendix F (informative) Basic principles of Kriging interpolation 31
Appendix G (Normative Appendix) Design Report for Regional Groundwater Level Monitoring Network 32
Reference 34
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the Ministry of Land and Resources of the People's Republic of China.
This standard is under the jurisdiction of the National Land Resources Standardization Technical Committee (SAC/TC93).
This standard was drafted. China Geological Environment Monitoring Institute, Beijing Geological Environment Monitoring Station, Shandong Provincial Geological Environment Monitoring Station, Xinjiang
Uygur Autonomous Region Geological Environment Monitoring Institute.
The main drafters of this standard. Li Wenpeng, Yin Xiulan, Wang Qingbing, Dong Dianwei, Zhu Xi, Feng Wei, Wang Juntao, Zhang Yuan and so on.
Introduction
Groundwater monitoring and its results are to carry out hydrogeological research, master the status of groundwater resources, rational development and utilization, and management of groundwater resources.
The basis for the work of source and science to prevent and control geological disasters and effectively protect the geological environment.
China has carried out groundwater monitoring work for more than 50 years. Most of the special monitoring wells used are hydrogeological exploration and
Some of the remaining water source sites are used for the use of groundwater production wells as monitoring wells, as they are not built for monitoring networks (points).
If it is set up, it cannot fully meet the requirements of groundwater dynamics in the monitoring area, and the goal of groundwater monitoring cannot be achieved.
In order to carry out overall planning for groundwater monitoring, build a high-level and high-efficiency groundwater monitoring network, and actively promote the monitoring network.
(point) construction, comprehensively improve the decision support and information service level of groundwater monitoring work, need to monitor the design of regional groundwater level monitoring network
The background survey of the survey area, the investigation and evaluation of the status quo of the monitoring network, and the design of the density of the monitoring network are standardized, and the previous work experience is fully absorbed.
Based on this, this standard has been developed.
Design specification for regional groundwater level monitoring network
1 Scope
This standard specifies the regional data collection and analysis of the design of the regional groundwater level monitoring network, the investigation and evaluation of the current status of the monitoring network, and the monitoring network.
Requirements and methods, and the way in which results are produced.
This standard is applicable to the encryption and improvement of the groundwater level monitoring network in the existing area, and is also applicable to the monitoring of the groundwater level monitoring network in the blank area.
Layout.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 958 regional geological map legend
GB/T 2260 Administrative division code of the People's Republic of China
GB/T 14538 Comprehensive hydrogeological map legend and color code
GB 50027-2001 Water supply hydrogeological survey specification
DZ/T 0133-1994 Groundwater dynamic monitoring procedures
DZ/T 0157 1.50000 geological map geographic base map coding specification
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Groundwater level dynamic groundwaterlevelregime
The process by which the water level of the groundwater and its related elements change over time.
3.2
Groundwater level monitoring groundwaterlevelmonitoring
Select a representative spring, well, hole, etc. for a region, and carry out groundwater dynamic elements according to certain time intervals and technical requirements.
Observation, recording and data collation.
3.3
Groundwater level monitoring network groundwaterlevelmonitoringnetwork
A network of groundwater monitoring points (wells or springs) set up to grasp the dynamic elements of regional groundwater levels.
3.4
Monitoring area monitoring region
The monitoring area refers to the scope of monitoring network monitoring.
3.5
Groundwater level dynamics factors factorsaffectinggroundwaterlevelregime
Meteorological, hydrological, topographical, geological, ecological and human activities affecting groundwater level changes.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of DZ/T 0271-2014_English be delivered?Answer: Upon your order, we will start to translate DZ/T 0271-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of DZ/T 0271-2014_English with my colleagues?Answer: Yes. The purchased PDF of DZ/T 0271-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|