|
US$769.00 ยท In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. DZ/T 0270-2014: Regulation of groundwater monitoring well construction Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| DZ/T 0270-2014 | English | 769 |
Add to Cart
|
6 days [Need to translate]
|
Regulation of groundwater monitoring well construction
| Valid |
DZ/T 0270-2014
|
PDF similar to DZ/T 0270-2014
Basic data | Standard ID | DZ/T 0270-2014 (DZ/T0270-2014) | | Description (Translated English) | Regulation of groundwater monitoring well construction | | Sector / Industry | Geological Industry Standard (Recommended) | | Classification of Chinese Standard | D14 | | Classification of International Standard | 07.060 | | Word Count Estimation | 31,362 | | Date of Issue | 12/5/2014 | | Date of Implementation | 1/1/2015 | | Quoted Standard | GB/T 2260; GB/T 12898; GB 50021; GB 50027; GB 50296; DZ/T 0017; DZ/T 0064.2; DZ/T 0133; DZ/T 0148; DZ/T 0181; ISO 9001 | | Regulation (derived from) | Ministry of Land & Resources Notice 2014 No. 28 | | Issuing agency(ies) | Ministry of Land and Resources | | Summary | This Standard specifies the design of groundwater monitoring well construction, drilling, construction, geophysical logging, into wells, pumping tests and water sampling, coordinates height measurement, measure and monitor wells to protect the installatio |
DZ/T 0270-2014: Regulation of groundwater monitoring well construction---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Regulation of groundwater monitoring well construction
ICS 07.060
D14
People's Republic of China geological mineral industry standard
Groundwater monitoring well construction specification
Released on.2014-12-05
2015-01-01 implementation
Ministry of Land and Resources of the People's Republic of China
Content
Foreword I
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General 2
5 Design 3
6 Drilling Construction 3
7 Hydrological exploration wells 3
8 Chengjing 4
9 pumping test and water sample collection 5
10 coordinate elevation measurement 6
11 Monitoring well protection and monitor performance requirements 6
12 Monitoring well acceptance and data archiving 6
Appendix A (Normative) Design Format 7
Appendix B (Normative) Groundwater Monitoring Well Code Requirements 8
Appendix C (Normative Appendix) Monitoring Well Drilling Construction 9
Appendix D (Normative Appendix) Pumping Test and Sampling Form 13
Appendix E (Normative) Coordinate elevation measurement 19
Appendix F (informative appendix) Recommended scheme for monitoring well orifice protection devices 20
Appendix G (Normative Appendix) Monitoring Well Acceptance and Data Archiving 23
Reference 27
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the Ministry of Land and Resources of the People's Republic of China.
This standard is under the jurisdiction of the National Land Resources Standardization Technical Committee (SCA/TC93).
This standard was drafted. China Geological Environment Monitoring Institute, Beijing Geological Environment Monitoring Station, Shandong Provincial Geological Environment Monitoring Station, Zhejiang
Provincial Geological Environment Monitoring Station, Hebei Province Geological Environment Monitoring Station, Guangxi Zhuang Autonomous Region Geological Environment Monitoring Station.
The main drafters of this standard. Li Wenpeng, Liu Jiurong, Yin Xiulan, Hu Yulu, Shao Xinmin, Liu Fengchuan, He Qishi, Wu Aimin, Wan Liqin.
Groundwater monitoring well construction specification
1 Scope
This standard specifies the design, drilling construction, object detection wells, well formation, pumping test and water sample collection of groundwater monitoring wells, and high coordinates.
Technical requirements for process measurement, monitoring well protection and monitor installation, monitoring well acceptance and data archiving.
This standard is applicable to the construction and protection of national-level groundwater monitoring wells. It is the design, construction, acceptance and acceptance of national-level groundwater monitoring wells.
The basis and guidelines for protection, etc., other groundwater monitoring wells can be used for reference.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2260 Administrative division code of the People's Republic of China
GB/T 12898 National Third and Fourth Level Measurement Specifications
GB 50021 Geotechnical Investigation Specification
GB 50027 Water supply hydrogeological survey specification
GB 50296 water supply well technical specification
DZ/T 0017 Engineering Geology Drilling Procedure
DZ/T 0064.2 Groundwater quality inspection method Collection and preservation of water samples
DZ/T 0133 Groundwater Dynamic Monitoring Procedure
DZ/T 0148 Hydrogeological Drilling Procedure
DZ/T 0181 Hydrological logging work specification
ISO 9001 quality management system requirements
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Groundwater dynamic groundwaterregime
The dynamic factors such as groundwater level, water quality, water temperature and water volume change with time.
3.2
Groundwater monitoring groundwatermonitoring
Select a representative spring, well, hole, etc. for a region, and carry out groundwater dynamic elements according to certain time intervals and technical requirements.
Observation, recording and data collation.
3.3
Monitoring target layer targetaquiferofmonitoring
Refers to a particular aquifer or aquifer group or segment selected for monitoring.
3.4
Single layer monitoring well onelayermonitoringwel
A tube well is placed in a borehole to monitor an aquifer or aquifer.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of DZ/T 0270-2014_English be delivered?Answer: Upon your order, we will start to translate DZ/T 0270-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of DZ/T 0270-2014_English with my colleagues?Answer: Yes. The purchased PDF of DZ/T 0270-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|