HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

DZ/T 0227-2010 English PDF

US$1669.00 ยท In stock
Delivery: <= 10 days. True-PDF full-copy in English will be manually translated and delivered via email.
DZ/T 0227-2010: Geological core drilling regulations
Status: Valid

DZ/T 0227: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
DZ/T 0227-2010English1669 Add to Cart 10 days [Need to translate] Geological core drilling regulations Valid DZ/T 0227-2010
DZ/T 0227-2002EnglishRFQ ASK 3 days [Need to translate] (Landslides; collapse monitoring measurement specification) Valid DZ/T 0227-2002

PDF similar to DZ/T 0227-2010


Standard similar to DZ/T 0227-2010

DZ/T 0080   MT/T 1090   MT/T 1042   DZ/T 0441.3   DZ/T 0226   DZ/T 225   

Basic data

Standard ID DZ/T 0227-2010 (DZ/T0227-2010)
Description (Translated English) Geological core drilling regulations
Sector / Industry Geological Industry Standard (Recommended)
Classification of Chinese Standard D10
Classification of International Standard 7.06
Word Count Estimation 68,682
Date of Issue 11/11/2010
Date of Implementation 12/31/2010
Quoted Standard GB/T 1.1; GB/T 3787; GB/T 5005; GB 6722; GB/T 9151; GB 15848; GB/T 16950; GB/T 16951; GB/T 18376.2; GB 50194; AQ 2004; DZ/T 0032-1992; DZ/T 0053; DZ/T 0054; DZ/T 0078; DZ/T 0088
Regulation (derived from) Ministry of Land & Resources About publishing "geological core drilling procedures" recommended Industry Standard's Notice
Issuing agency(ies) Ministry of Land and Resources
Summary This standard specifies the technical requirements for the drilling process and the construction process all relevant regulations. The standard definition of "core" in a broad sense, refers to the various types can be collected rock samples, that is, except the cylindrical core, but also includes a variety of rock, rock samples and cuttings, so all kinds of reverse circulation continuous Coring is also included in the scope of core drilling. This standard applies to the geological core drilling, construction engineering survey of small diameter drilling, construction, hydrology and water well drilling and oil and gas well drilling, you can refer to this standard. This standard applies to deep hole drilling construction within 3000m.

DZ/T 0227-2010: Geological core drilling regulations

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Geological core drilling regulations People's Republic of China geological mineral industry standard Geological core drilling procedures Released on.2010-11-11 2010-12-31 implementation Ministry of Land and Resources of the People's Republic of China

Content

Foreword V 1 Scope 1 2 Normative references 1 3 Basic provisions 1 3.1 Drilling hole series 1 3.2 Drilling depth 2 3.3 Rock drilling characteristics 2 3.4 Drilling method 4 4 Drilling Engineering Design 5 4.1 Basic requirements for design 5 4.2 Design basis 5 4.3 Main contents and requirements of design writing 5 5 Drilling equipment selection and installation 8 5.1 Selection of drilling equipment 8 5.2 Equipment Installation 9 5.3 Installation Acceptance 10 6 Carbide Drilling 10 6.1 Selection of Carbide Drills 10 6.2 Cemented carbide drilling technical parameters 11 6.3 Needle Carbide Drilling 12 6.4 Carbide drilling considerations 12 7 Diamond Drilling 13 7.1 Selection of Abrasives for Drills and Reamers 13 7.2 Diamond drill and reamer selection 14 7.3 Reasonable use of diamond drill bits 15 7.4 Diamond Core Drill 16 7.5 Diamond core drilling technical parameters 16 7.6 Diamond drilling operation technical requirements 18 8 Diamond rope core drilling 19 8.1 Selection of rope core drills and reamer 19 8.2 Rope core drilling tool 19 8.3 rope core drilling technical parameters 21 8.4 Mud drilling operation requirements 22 8.5 Drilling rod inner wall scaling prevention measures 22 9 Impact rotary drilling 22 9.1 Impact rotary drilling conditions 22 9.2 Hydraulic Impactor Type 23 9.3 Selection of drilling equipment and attachments 23 9.4 Hydraulic Impact Rotary Drilling Process Requirements 23 10 Directional drilling and directional coring 24 10.1 Directional Drilling Applicable Conditions 24 10.2 Primary Directional Drilling 24 10.3 Controlled Directional Drilling 24 10.4 Correction drilling 25 10.5 Core Orientation Technology 26 11 Air Reverse Circulation Sampling Drilling 26 11.1 Technical characteristics and applicable conditions 26 11.2 Equipment Selection and Support 27 11.3 Drill Assembly 27 11.4 Drilling Process 28 11.5 Types and characteristics of air media 30 11.6 Dust removal and defoaming 30 11.7 Collection and reduction of samples 31 11.8 How to Deal with Common Problems 31 12 rinse solution 31 12.1 Type and Application Stratum 31 12.2 Common materials and chemical treatments for rinses 32 12.3 Main Performance Indicators of Flushing Fluid 32 12.4 Preparation and maintenance of on-site rinses 32 12.5 Maintenance and Management 33 12.6 Preventing the performance of flushing fluid on the inner wall of the coring rod of the rope 12.7 Waste slurry treatment 33 13 Wall and plugging 33 13.1 Wall protection measures for different formations and stress anomalies 33 13.2 Casing retaining wall 34 13.3 Plugging and Stopping 35 14 Drilling track measurement 36 14.1 General Provisions 36 14.2 Simple calculation method for drilling axis trajectory 37 15 Classification and prevention of accidents in the hole 37 15.1 Accident classification in the hole 37 15.2 Basic requirements for prevention of accidents in the hole 37 15.3 Basic requirements for handling accidents in holes 38 15.4 Prevention and Treatment of Card, Buried and Burning Drills 38 15.5 Prevention and treatment of drill breakage, shedding and running accidents 39 15.6 Treatment of casing accidents 40 15.7 Treatment of falling into the tool object in the hole 40 15.8 Prevention and treatment of logging accidents 41 15.9 Safety Regulations for Handling Accidents 41 16 Drilling Engineering Quality 41 16.1 Drilling Quality Requirements 41 16.2 Measures to ensure the quality of drilling projects 43 17 Health, Safety, and Environmental (HSE) Management 44 17.1 Health Management 44 17.2 Security Management 44 17.3 Environmental Protection Management 47 18 Production Management 47 18.1 Basic provisions for construction management 47 18.2 Management System 48 19 Drilling Construction Technology File 50 19.1 Basic Requirements for Establishing Drilling Construction Technical Files 50 19.2 Basic Contents of Drilling Engineering Technical Archives 50 Appendix A (informative) Flushing liquid chemical treatment agent, performance test and basic calculation of pulping 52 Appendix B (informative appendix) Drilling Engineering Construction Technical Report Compilation Outline 57 References 59

Foreword

This procedure includes the preparation of core drilling engineering design, drilling methods and equipment selection, general process methods, flushing media and construction. The code, drilling quality assurance, personal health, safety, environmental protection and production management of drilling construction are cores in different fields. Basic procedures for drilling engineering and various special drilling techniques. This regulation is an important basis and criterion for the design, construction, management, inspection and acceptance of geological core drilling engineering. For different Some special requirements and technical indicators that have been changed in the survey object, exploration stage, and exploration purpose shall comply with relevant regulations, specifications, or The agreement and the contract are clearly defined. This procedure is in accordance with the drafting rules of GB/T 1.1-2009 and is published for the first time in the form of technical standards. This procedure was proposed by the China Geological Survey. This procedure is under the jurisdiction of the Ministry of Land and Resources. This procedure was drafted by. Institute of Exploration Technology, Chinese Academy of Geological Sciences. The main drafters of this regulation. Wang Da, Zhao Guolong, Xiao Yamin, Chen Xingqing, Tang Songran, Sun Jianhua, Zhang Linxia, Liu Xiumei, Dai Zhichang. This procedure is interpreted by the Ministry of Land and Resources. Geological core drilling procedures

1 Scope

This regulation specifies the technical requirements and relevant management regulations for all processes in the drilling construction process. The definition of "core" in this regulation is broad and refers to the various types of rock samples that can be collected, that is, in addition to the cylindrical core, including each Rock blocks, rock samples and cuttings, so various reverse circulation continuous cores are also included in the core drilling range. This procedure is mainly applicable to geological core drilling, engineering survey, engineering construction, hydrological well drilling and small bore drilling of oil and gas well drilling. For construction, please refer to this regulation. This procedure is applicable to drilling construction with a hole depth of less than 3000m.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this file. For undated references, the latest edition (including all amendments) applies to this document. GB/T 1.1 Standardization Work Guide Part 1. Standard Structure and Compilation Safety technical regulations for the management, use, inspection and maintenance of GB/T 3787 hand-held power tools GB/T 5005 drilling fluid material specification GB 6722 blasting safety regulations GB/T 9151 drilling engineering terminology GB 15848 uranium mine geological exploration radiation protection and environmental protection regulations GB/T 16950 Diamond Core Drilling Equipment GB/T 16951 diamond rope core drilling drilling equipment GB/T 18376.2 Carbide grades Part II. Carbide grades for geological and mining tools GB 50194 Construction site safety requirements for construction and supply of electricity AQ2004 Geological Exploration Safety Regulations DZ/T 0032-1992 General Rules for Geological Exploration Drilling Rock Core Management DZ/T 0053 Technical Specifications for Hydraulic Impact Rotary Drilling DZ/T 0054 Directional Drilling Technical Specifications DZ/T 0078 Solid Mineral Exploration Primitive Geological Cataloging Regulations DZ/T 0088 Drilling tower series for geological drilling

3 Basic regulations

3.1 Drilling caliber series The geological core drilling caliber series is the most basic regulation of drilling engineering. R, E, A, B, N, H, P, S are adopted according to internationally accepted standards. As the code name, the specification code and the corresponding nominal diameter are shown in Table 1. Table 1 Specification code and corresponding nominal diameter in millimeters Specification code REABNHPS Nominal diameter 30 38 48 60 76 96 122 150

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of DZ/T 0227-2010_English be delivered?

Answer: Upon your order, we will start to translate DZ/T 0227-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of DZ/T 0227-2010_English with my colleagues?

Answer: Yes. The purchased PDF of DZ/T 0227-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version DZ/T 0227-2010?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DZ/T 0227-2010 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.