US$1629.00 · In stock Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. DZ/T 0219-2006: Specification of design and construction for landslide stabilization Status: Valid DZ/T 0219: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| DZ/T 0219-2006 | English | 1629 |
Add to Cart
|
8 days [Need to translate]
|
Specification of design and construction for landslide stabilization
| Valid |
DZ/T 0219-2006
|
| DZ 0219-2002 | English | RFQ |
ASK
|
3 days [Need to translate]
|
(Engineering geological rock and soil classification)
| Obsolete |
DZ 0219-2002
|
PDF similar to DZ/T 0219-2006
Basic data | Standard ID | DZ/T 0219-2006 (DZ/T0219-2006) | | Description (Translated English) | Specification of design and construction for landslide stabilization | | Sector / Industry | Geological Industry Standard (Recommended) | | Classification of Chinese Standard | P13 | | Classification of International Standard | 93.020 | | Word Count Estimation | 58,599 | | Date of Issue | 2006-06-05 | | Date of Implementation | 2006-09-01 | | Quoted Standard | GB 50010-2002; GB 50119-2003; GB 50204-2002; GB 50290-1998; JGJ 94-1994; SDJ 34-1989; SL 18-1991 | | Issuing agency(ies) | Ministry of Land and Resources | | Summary | This standard specifies the basic requirements landslide control engineering, landslide classification and control engineering survey, classification and design safety factor of landslide prevention works, drainage works, stabilizing piles, prestressed anchor, lattice anchor, gravity retaining wall, grouting, brush side load shedding, backfill presser foot, plant prevention, landslide control monitoring, construction organization, quality inspection and acceptance and so on. This specification applies to the guidance of landslide control engineering. |
DZ/T 0219-2006: Specification of design and construction for landslide stabilization---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification of design and construction for landslide stabilization
Book People's Republic of China Geology and Mineral Industry Standards
DZ/T 0219-2006
Technical code for design and construction of landslide prevention engineering
Released.2006-06-05
Implementation of.2006-09-01
Issued by the Ministry of Land and Resources of the People's Republic of China
Table of contents
Preface Ⅲ
Introduction Ⅳ
1 Scope 1
2 Normative references 1
3 Basic regulations for landslide prevention and control engineering design 1
4 Landslide classification and prevention engineering investigation 3
5 Classification and design safety factor of landslide prevention and control engineering 5
6 Drainage works 7
7 Anti-slide pile 12
8 Prestressed anchor cable 18
9 Lattice anchoring 24
10 Gravity retaining wall 28
11 Other prevention and control projects 32
12.Landslide prevention monitoring 35
13 Construction organization 36
14.Quality Inspection and Project Acceptance 37
Appendix A (normative appendix) landslide stability evaluation and thrust calculation formula 44
Appendix B (Normative Appendix) Calculation formula 49 for earth pressure of gravity retaining wall
Appendix C (Normative Appendix) Table 51 of foundation coefficients for anti-slide pile design
DZ/T 0219-2006
Foreword
Appendix A, Appendix B, and Appendix C of this specification are normative appendices.
This specification was proposed by the Department of Geology and Environment of the Ministry of Land and Resources.
This specification is under the centralized management of the Department of International Cooperation and Science and Technology of the Ministry of Land and Resources.
The main drafting unit of this code. China Geological Survey.
The main drafters of this specification. Yin Yueping, Zhang Zuochen, He Mohong, Pan Shibing, Hu Ruilin, Zhang Guoquan, Kang Hongda, Yan Yi, Tang Huiming,
Cheng Wenming, Li Li, Li Xiaochun, Zhang Kaijun, Liu Zhen.
This code is interpreted by the Department of Geology and Environment of the Ministry of Land and Resources.
DZ/T 0219-2006
Introduction
In order to improve the technical level of landslide prevention and control, unify technical standards, ensure sufficient geological basis, safety and reliability, economical and reasonable, technically feasible, and specially made
Make this specification.
This code is compiled on the basis of full study of domestic and foreign technical standards for landslide prevention and control and more mature methods and technologies.
Various methods have fully solicited the opinions of relevant units and experts across the country, and the resettlement and construction of the Three Gorges Project reservoir area, as well as other municipal and engineering construction
Design, the natural geological landscape protection landslide prevention project was tried out and repeatedly revised and improved, and the final draft was reviewed and finalized.
This code covers the feasibility plan design, preliminary design and construction drawing design of landslide prevention and control projects, as well as the design of emergency treatment projects
Provisions and regulations on drainage, anti-slide piles, prestressed anchor cables, lattice anchoring, gravity retaining walls, grouting reinforcement, brushing for load reduction, backfill
Technical methods such as foot and plant protection, as well as construction technical methods put forward requirements.
DZ/T 0219-2006
Technical code for design and construction of landslide prevention engineering
1 scope
This code stipulates the basic requirements for landslide prevention and control engineering design, landslide classification and prevention engineering investigation, landslide prevention engineering classification and design safety
Full coefficient, drainage engineering, anti-slide pile, pre-stressed anchor cable, lattice anchoring, gravity retaining wall, grouting reinforcement, brush square load reduction, backfill presser foot, plant protection,
Landslide prevention and control monitoring, construction organization, quality inspection and project acceptance, etc.
This code is applicable to guide the design of landslide prevention and control engineering.
2 Normative references
The clauses in the following documents become clauses of this standard after being quoted. For dated reference documents, all subsequent
Amendments (not including errata content) or revisions do not apply to this standard. However, all parties that have reached an agreement based on this standard are encouraged to study
Is the latest version of these files available? For undated references, the latest version is applicable to this standard.
GB 50010-2002 Code for Design of Concrete Structures
GB 50119-2003 Technical specification for application of concrete admixtures
GB 50204-2002 Code for Construction and Quality Acceptance of Concrete Structure Engineering
GB 50290-1998 Technical specification for application of civil composite materials
SL18-1991 Technical Specification for Canal Seepage Control Engineering
SDJ34-1989 Spillway design specification
JGJ94-1994 Technical Code for Building Pile Foundation
3 Basic regulations for landslide control engineering design
3.1 General provisions
3.1.1 The design of landslide prevention works can be divided into three stages. feasibility plan design, preliminary design and construction drawing design. For small scale,
Landslides with clear geological conditions can simplify the design phase.
3.1.2 Feasibility plan design. According to the prevention and control objectives, compile on the basis of the approved landslide prevention and control geological survey report;
Demonstrate the technical, economic, social and environmental benefits of the design scheme, and make engineering estimates; submit a feasibility scheme design report and feasible
Attached drawings for the design of the proposed plan, and submit the landslide engineering geological survey report and related test reports and other attachments; calculation and estimation content can be calculated
And the form of estimate is submitted as an attachment.
3.1.3 Preliminary design. Fully demonstrate and test the recommended design of the feasibility scheme; propose specific project implementation steps and related engineering
Process parameters, carry out structural design, prepare corresponding reports and drawings, carry out project estimates; submit preliminary design reports and design drawings, and submit
Submit related test reports and other attachments; calculations and budget estimates can be submitted as attachments in the form of calculations and budget estimates.
3.1.4 Construction drawing design. Carry out detailed design on the engineering drawing determined by the preliminary design; propose construction technology, construction organization and safety measures
Requirements; and meet the project construction and project bidding requirements; compile project construction drawings and instructions, make project budgets; submit construction design drawings and
Construction drawing manual, budget book, etc.
3.1.5 The emergency treatment engineering design is a special content in the landslide disaster prevention engineering design, which can simplify the above-mentioned design stage. But emergency management
It should be compatible with subsequent normal governance and provide a basis for normal governance.
3.2 Feasibility plan design of landslide prevention project
3.2.1 The feasibility scheme design of landslide prevention engineering is an important stage of landslide prevention engineering design. According to the requirements of the mandate, from the technical
Analysis and demonstration of more than two plans for prevention and control projects based on factors such as operation and economy, as well as social and environmental factors, conduct investment estimates and determine the best
化计划
DZ/T 0219-2006
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of DZ/T 0219-2006_English be delivered?Answer: Upon your order, we will start to translate DZ/T 0219-2006_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of DZ/T 0219-2006_English with my colleagues?Answer: Yes. The purchased PDF of DZ/T 0219-2006_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version DZ/T 0219-2006?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DZ/T 0219-2006 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|