HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

CQC-C0501-2014 English PDF

US$1239.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
CQC-C0501-2014: China Compulsory Certification Implementation Detailed-Rules - Power Tools
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
CQC-C0501-2014English1239 Add to Cart 6 days [Need to translate] China Compulsory Certification Implementation Detailed-Rules - Power Tools CQC-C0501-2014

PDF similar to CQC-C0501-2014


Standard similar to CQC-C0501-2014

BJS 201706   CQC-C0401   CQC-C0601   CQC-C0302   CQC-C0901   CQC-C0701   

Basic data

Standard ID CQC-C0501-2014 (CQC C0501-2014; CQC-C05-01-2014; CQC-C0501-2014)
Description (Translated English) China Compulsory Certification Implementation Detailed-Rules - Power Tools
Sector / Industry China Quality Certification Center - CCC Implementation Detailed-Rules
Classification of Chinese Standard CQC
Word Count Estimation 31,399
Date of Issue 7/16/2014
Date of Implementation 9/1/2014
Older Standard (superseded by this standard) CQC-01C-014-2007
Regulation (derived from) Notice of the State Commission of the People Republic of China on the 23rd of
Issuing agency(ies) China Quality Certification Center
Summary This document specifies the China Compulsory Certification (CCC) implementation Detailed-Rules for Power Tools. This document defines the Power Tools's certification unit; certification entrusting; document requirements; sample requirements; certification

CQC-C0501-2014: China Compulsory Certification Implementation Detailed-Rules - Power Tools

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Mandatory product certification implementation rules electrical tools September 1, 2014 release September 1, 2014 implementation China Quality Certification Center Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools

table of Contents

I. INTRODUCTION .3 0.1 Definition .. 3 0.2 Production enterprise management requirements ..4 1. Scope 5 2. Standards for Certification ..5 3. Authentication Mode 6 3.1 Certified basic model ..6 Refinement ..6 3.2 authentication mode 3.3 Applicability authentication mode 6 4. Certification application unit ..6 5. Certification commissioned 7 5.1 application for certification and acceptance .7 5.2 application data ..7 5.3 implementation arrangements ..8 6. Certification 8 6.1 Type test ..8 10 6.2 Initial factory inspection 6.3 Evaluation and Certification decisions .12 6.4 Time frame for certification .12 7. up inspection 12 Follow-up examination after ..12 7.1 certified 7.2 Production site sampling ..13 7.3 Market sampling 13 7.4 Frequency and time of follow-up inspection ..14 7.5 Follow-up inspection records ..14 After 7.6 up inspection results of the evaluation .14 Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools 8. Certification ..14 8.1 holding certificates .14 8.2 certified products change ..14 8.3 certified products extended ..15 8.4 certificate cancellation, suspension and revocation of .15 8.5 Certificate use .15 9. The certification mark ..16 10. Pay ..16 11. Certification Responsibility .16 12. and technical disputes, complaints and appeals process and time-related requirements 16 Annex 1. The same principle of classification of 17 Category Tools Annex 2. Factory Quality Assurance Ability 18 Annex 3. power tools manufacturer quality control testing requirements 26 Annex 4. Key components and materials and a list of important changes to the requirements .27 Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools 0 Introduction Power Tools compulsory certification implementation details (hereinafter. the Regulations) is based on electricity Dynamic tools Rules for Compulsory Certification (CNCA-C05-01.2014) (hereinafter referred to as. Implementation Rule) requirements for the preparation, implementation rules as the supporting documents, together with the implementation of the rules to use. These Rules apply to all content and implementation of the rules of product range, based on certification, etc. Consistent with the relevant provisions, and (hereinafter according to the National Commission on Certification and Accreditation Administration Said CNCA) published catalog defined directory adjustment announcement being adjusted. CQ C certification and implementation in accordance with the rules and the spirit of maintaining the effectiveness of product certification, improve Product quality, service certification and certification risk control principles, develop and publish this certification Implementing Rules. Rule by establishing production enterprises category management requirements, combined with the company Classification, clear power tools mandatory product certification implementation requirements. 0.1 Definition of Terms 0.1.1 the use of detection equipment manufacturers (referred TMP mode) By a designated laboratory engineer with factory laboratory testing equipment for testing, work Plant should send inspectors to assist. Approval by the relevant designated laboratory test report issued. 0.1.2 producers witnessed detection (abbreviated way WMT) So by a designated laboratory engineer witnessed the factory laboratory and factory laboratory conditions With their own equipment to complete all tests or test plan for factory submitted witness part Test conditions and test items factory laboratory personnel responsible for the original record issued, and with Witnessed the designated laboratory engineer to draft inspection report prescribed format specified by the relevant Laboratory approval test report issued. 0.1.3 ODM (Original Design Manufacturer) production enterprises The ability to use the same quality assurance requirements, the same product design, manufacturing process control and inspection Inspection requirements for one or more producers design, processing, producing the same products factory. 0.1.4 ODM initial certificate holder ODM product for the first time to obtain tissue product certificates. 0.1.5 OEM (Original Equipment Manufacturer) Manufacturer Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools According to the design provided by the client, production process control and inspection requirements of the production of certified products The production plant can be certified principal or principal producers; OEM manufacturer based on trust Design, production process control and inspection requirements provided in OEM equipment manufacturers Under the production of certified products. 0.2 Production enterprise management requirements CQ C collect, collate and all kinds of certified products and their manufacturers quality-related information, On producing dynamic classification management certification clients, producers, manufacturers Should cooperate. Producers divided into four categories, each with a Class A, Class B, Class C, Class D represents .CQ C According to the basic principles of the following categories to classify grading company, and according to all kinds of information Regular or irregular production enterprises reclassifying grading, dynamic management. Subject to change Oriented to CQ C public documents. In principle, the company shall be in accordance with the classification results DCBA Order progressively improved, the step-down in the order ABCD, or directly after a risk assessment Adjusted to the appropriate category. The basic principle of classification is as follows. ① A Class. In principle, providing compliance information to CQ C by the class B enterprises, CQ C the collected Quality business information and data provided by a comprehensive risk assessment and determine the classification results. Assessment The contents include at least the following aspects. a) factory inspection Nearly two years (including the year) factory inspection in line with all items. b) product testing, inspection results Nearly two years (including the year) follow-up inspection found no detection of nonconformity, national, Provincial and CCC and other special inspection conclusions are "qualified." c) product testing capabilities The company should have the ability to detect, and through CQ C review. d) research and development capabilities Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools The company has research and development capabilities, such as participation in the revision of the standard power tools with electric Tools product patents. e) Others with quality certified products and producers of information. ② Class B. In addition to Class A, Class C, other manufacturers like D. There is no quality information for students Production companies, classified as a default rating class B. ③ Class C (meet one of the following). a) factory inspection judged to be "field-proven" (except for the standard version for the reason); b) product quality problems and the Department of corporate responsibility, but not serious enough to suspend the certificate; c) CQ C relevant quality information and comprehensive evaluation of the company according to results certified products That the need to adjust for the class C. ④ Class D (meet one of the following). a) factory inspection determined that "no-go" of; b) Follow-up inspection test results for safety item failed; c) unjustified refusal inspection and/or sampling of; d) the quality of products there is a big problem and the Department of corporate responsibility, to suspend, revoke certification card Books; e) national, provincial and CCC and other special inspection concluded that failure and the impact of the product Safety issues; f) CQ C relevant quality information and comprehensive evaluation of the company according to results certified products recognize The need to adjust the class D.

1. Scope

Implementation with a rule. 2. Standards for Certification With the implementation of Rule 2. Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools 3. Authentication Mode 3.1 Basic authentication mode The basic mode to electric tools mandatory product certification are. After type testing up inspection Refinement 3.2 authentication mode According to the basic authentication mode, combined with production enterprise management principles, for different classes Do not related enterprises to increase authentication features, as appropriate, in the authentication mode, specific and detailed as follows. Mode 1. Type test certified oversight Mode 2. Type tests corporate quality assurance and product consistency check (initial Factory inspection) Follow-up inspection Follow-up inspection refers to the follow-up inspection Follow-up inspection, sampling and testing company or market Sampling one or a combination of three ways. 3.3 Applicability authentication mode Class A. Mode 1 can be used for certification. Class B, Class C, Class D Manufacturer. 2 mode should be used for certification. Certified clients according to their own actual situation, apply the applicable certification model. CQ C certified products based on the principle of control and certification risk characteristics, combined with the company Category management As a result, the client can determine the applicable certification authentication mode. 4. Certification application unit In principle, the same producers, the same producers of the same class tools, the same electric Machine type, the rated voltage of the same level, the same motor stator and rotor plate dimensions, the basic The same security structure of the product can be certified as a unit. Different certification clients, producers, Manufacturers of products, should be used as different authentication unit. Tools 4.1 in the same category. Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools Multiple security standards applicable to specific tools and standards for the safety of a single tool, not a The same authentication unit; Under normal circumstances, the same principle of classification tools category in Annex 1. 4.2 the same motor type. (A) single-phase series, single-phase induction motor does not belong to the same certification unit; (B) DC, AC motors do not belong to the same certification unit; (C) single-phase induction three-phase induction motor does not belong to the same certification unit. 4.3 the same rated voltage Common voltage rating of 380V class, 220 V level, 110 V-class, ultra-low voltage levels. 4.4 the same motor stator and rotor plate size, the same basic security structure. (A) different insulation levels of power tools do not belong to the same certification unit When the windings insulation class B and above, should be required to GB/T 11021 were Insulation assessment. (B) the different types of protection against electric shock electric tools do not belong to the same certification unit; (C) aluminum, copper stator windings tools do not belong to the same certification unit; 5. Certification commission 5.1 application for certification and acceptance Certification principal basis having to write the necessary corporate information and product information according to the relevant .CQ C Requirements Applications are reviewed, accepted or issued without notice admissible in two working days, Or principal certification requirements after rectification to re-apply for certification. 5.2 Application Information Principal certification certification scheme should be required to CQ C and/or designated in the application acceptance Lab provides the application information and technical materials typically include. (1) certification application or certification contract; Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools (2) Certification clients, producers, production enterprises certificate of registration (such as business licenses, Organization code certificate, etc.); (3) industrial policy compliance certificate (if necessary); (4) The agreement signed between the authentication client, producer, manufacturer, or combination With (released as ODM, OEM agreement, power of attorney, etc.) (if necessary); (5) Product description (including. the main technical parameters, structure, the model shows, off Key components and/or materials list, the same authentication unit contains different specifications of the product Difference description, etc.); (6) factory inspection questionnaire; (7) factory quality assurance ability to self-assessment report (if applicable); (8) For the application, and documents related to the change of the project; (9) Other necessary documents. 5.3 Implementation Arrangements CQ C certification scheme developed after accepting, and notifies the client authentication. Authentication scheme Typically include the following. (1) Authentication mode and the unit used is divided; Application lists (2) to be submitted; (3) type test sample delivery requirements; (4) specify the laboratory information; (5) required certification process and time frame; (6) Estimated cost of certification; (7) about the CQ C staff contact details; (8) Other matters to be noted. 6. Certification 6.1 Type tests 6.1.1 Type test program Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools Type test program include. real sample requirements and the number of test items and type testing Shi, etc., see the specific requirements of Rule 6.1.2, 6.1.3, 6.1.4. 6.1.2 Type test sample request 6.1.2.1 Samples are usually tested by the certification requirements of the client by sending a representative sample of CQ C For detection. 6.1.2.2 Authentication Client shall ensure the consistency of the sample and the actual production of products which it provides, Shall not borrow, rent, buy samples, etc. for testing. The samples designated laboratories true Of doubt, it shall explain the situation CQ C, CQ C make the appropriate treatment. 6.1.2.3 type test sample size and quantity CQ C select a representative for major types of products according to the authentication unit product type Type test, the main subject of the authentication unit to send four models, increasing the number of samples based on differences in coverage situations. When the stator winding of certified products using aluminum, which covers each product type are sent to three, Complementary pilot projects include at least. start, input power and current, heat, leakage current, Moisture resistance, electrical strength, durability, abnormal operation. Main Unit models selected according to the following principles. (A) the maximum rated power input products seized products; (B) to the widest range of products rated voltage detection products; (C) the maximum rated capacity of the products seized products; (D) with the highest speed products seized products; (E) to adopt electronic speed control switch, reversing switch different components of the products seized product. 6.1.2.4 list of critical components and key materials and related requirements 4 "critical components and materials lists and important change request" in the annex. For critical components and materials for purchase within the territory of mandatory product certification range Materials, manufacturers should provide compulsory product certification; other critical components and materials Materials, manufacturers should provide relevant CQ C logo certification, voluntary certification, CNAS Accredited laboratory test reports issued within the validity period or to do random testing. 6.1.3 Test items and requirements With the implementation of the rules 6.1.3. Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools Implementation 6.1.4 type testing 6.1.4.1 On principle, the type test should be completed by the national commission designated laboratories. 6.1.4.2 only a mass production, will no longer produce the product, or other special circumstances, It can be used to detect resource company specific requirements based on the use of CQ C inspection company Measured resource requirements of implementation. 6.1.4.3 type test takes no more than 30 working days (from the date designated laboratories received samples From stage to type test report issued to the date), not including the rectification time when there is the type test When the project failed, allowing the client authentication for rectification, the rectification should in principle within 3 months Finished and CQ C and/or effective corrective designated laboratories submitted data and/or samples, ultra Through the certification period can be regarded as terminated. 6.1.5 Type test report With the implementation of the rules 6.1.5. 6.2 Initial factory inspection The initial inspection should cover the certified/certificated products and all processing premises. "Covered for Certification/certified product "refers to products covered by the consistency check, for each type of product consistency check Factory defined coding (see Table 6-1) of product implementation; "processing premises" refers to the quality of product certification All relevant departments, places, people, events. CQ C If you are unable to complete the production site in the annex 2 requires factory inspection can be Extending to the authentication client, producer, etc. to be checked. Table 6-1 Power Tools range of products factory defined coding Factory sector Given encoding Product Category Code Name 0501, 0503 ~ 0505, 0508 ~ 0510, 0513 ~ 0516 Drills and impact drills, grinders, polishers and disc sanders, disc sanders non Machines and polishing machines, circular saws, electric scissors and electric punching, tapping machine, reciprocating saws (curve Saws, saber saws), planer, pruning shears, routers and edge trimmers, stone cutting machine 05020506 hammer tool 05,030,507 non-flammable liquid spray guns 05,040,511 concrete vibrator 05050512 chain saw 05,060,502 screwdrivers and impact wrenches Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools 6.2.1 check the contents Check the contents of the company quality assurance ability assessment and the products consistency check. 6.2.2 factory quality assurance ability examination Annex 2 "factory quality assurance capability requirements" and Annex 3 "power tool manufacturer Quality control testing requirements "implementation. 6.2.3 product consistency check The main contents certified product consistency requirements are. identification, related to security and/or electromagnetic and Contents structure, key components and materials. 6.2.3.1 Logo Logo certified products such as. nameplate, product technical documentation and product names indicated on the package He said model specifications, technical parameters should meet the standard requirements and consistent with the results of the approval. 6.2.3.2 Product Structure Certified products related to safety and/or EMC structure shall comply with the requirements and standards The results of the approval of the (type test reports, change approval information, product description, etc.) consistent. 6.2.3.3 critical components and materials Critical components and materials used in certified products should meet the following requirements. (A) comply with the relevant standards; (B) consistent with the CQ C approval or production companies responsible for technical approval. 6.2.4 Checking time Normally, type test after passing the initial factory inspection; under special circumstances, Type testing and factory inspection can be carried out simultaneously. After type testing, factory inspection principle On should be completed within one year, or should be re-type testing. Initial factory inspection, factory should apply for certification of products within the scope of the production factory Check the time depending on the size of the number of units of certified products and manufacturers identified a Like each processing premises 1-4 man-days. 6.2.5 Inspection findings Inspection Unit report inspection results to the CQ C. Check the conclusion to be ineligible, the inspection team directly Shall report to the CQ C; factory inspection presence of non-conformity, the factory should be specified Mandatory product certification implementation rules CQ C-C0501-2014 Power Tools Complete the rectification within the time limit, the inspection team to take appropriate corrective way to verify the results. Could not Period to complete the rectification, the factory inspection fails. 6.3 Evaluation and Certification decisions With the implementation of Rule 6.2. 6.4 Time frame for certification With the implementation of Rule 6.3. 7. Supervision after inspection Combined with production enterprise management and the actual situation, certified after supervision mode selection table 7-1. Select Table 7-1 certified after supervision mode enterprise Types of Certified after supervision frequency Notice/ Without notice

content

Tracking production site inspection sampling and testing sampling market A 2-year notice 1 √ √ / B 1 once a year inform √ √ / C at least once a year, if necessary, the priority is not notified √ √ (Note) D at least twice a year, without notice, if necessary √ √ (Note) Note. The production site sampling and mar...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of CQC-C0501-2014_English be delivered?

Answer: Upon your order, we will start to translate CQC-C0501-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of CQC-C0501-2014_English with my colleagues?

Answer: Yes. The purchased PDF of CQC-C0501-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.