|
US$1679.00 · In stock Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. CQC-C0301-2014: China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| CQC-C0301-2014 | English | 1679 |
Add to Cart
|
7 days [Need to translate]
|
China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment
| |
CQC-C0301-2014
|
PDF similar to CQC-C0301-2014
Basic data | Standard ID | CQC-C0301-2014 (CQC C0301-2014; CQC-C03-01-2014; CQC-C0301-2014) | | Description (Translated English) | China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment | | Sector / Industry | China Quality Certification Center - CCC Implementation Detailed-Rules | | Classification of Chinese Standard | CQC | | Word Count Estimation | 42,425 | | Date of Issue | 7/16/2014 | | Date of Implementation | 9/1/2014 | | Older Standard (superseded by this standard) | CQC-01C-010-2013 | | Regulation (derived from) | Notice No. 23 of the State Certification and Accreditation Administration, No. 23 of the State Certification and Accreditation Administration | | Issuing agency(ies) | China Quality Certification Center | | Summary | This document specifies the China Compulsory Certification (CCC) implementation Detailed-Rules for Low-voltage switchgear and low voltage electrical equipment. This document defines the Low-voltage switchgear and low voltage electrical equipment's certifi |
CQC-C0301-2014: China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
China Compulsory Certification Implementation Detailed-Rules-Low-voltage switchgear and low voltage electrical equipment
Implementation details of compulsory product certification Low-voltage electrical low-voltage switchgear CQC-C0301-2014
Classification management requirements of manufacturing enterprises
Collection, analysis, evaluation and preservation of various quality products related to certified products and their manufacturing companies
Relevant information, dynamic classification management of production enterprises. Certification client, producer,
Production enterprises should cooperate.
There are four types of production enterprises. The classification is based on the following information.
① Factory inspection (including initial factory inspection and follow-up inspection after certification);
② Supervision sampling test results (sampling at production site or market);
③ National, provincial and special spot checks;
④ Media exposure and quality information feedback from product users and the public;
⑤ Quality status of certified products;
⑥ Other information.
Classification and classification of production enterprises based on the basic principles of classification, and according to various types of information
Regularly or irregularly reclassify and grade production enterprises to achieve dynamic management.
The basic principles of classification are carried out in accordance with the public documents of the Management Requirements for Enterprise Classification.
Selection of authentication mode and related requirements
Basic mode of authentication
The basic modes of implementing compulsory product certification for low-voltage switchgear are.
Follow-up inspection after type test certification;
Follow-up inspection after the type test of design appraisal for some items.
Specific details of the authentication model
According to the basic mode of certification, combined with the classification management principles of production enterprises, the details are as follows.
Mode. Supervision after Type Test
Mode. Type test enterprise quality assurance capability and product consistency check (initial
Factory inspection) supervision after certification
Mode. Supervision after type approval of some projects of design appraisal
Mode. Design and appraisal of part of project type test enterprises' quality assurance capabilities and
Product consistency check (initial factory inspection) Supervision after certification
For the mode and mode, it is considered necessary, and it can be
Perform design capability evaluation.
Post-certification supervision generally refers to follow-up inspection after certification. For businesses in different categories,
After obtaining the certificate, supervision can be added to the production site to take samples for testing or inspection, market sampling testing or
Check for other pattern elements.
Applicability of the certification model
Does not use design certification
For production enterprises to obtain certificates for products within the scope of this rule
Line of initial certification application,
Production enterprises. can adopt the mode to implement certification;
Category, category, and category manufacturing enterprises. should adopt a model to implement certification.
For production enterprises that have obtained certificates for products within the scope of this rule
Re-certification application, and the factory definition code is different from the certified factory definition code, and cannot be
Covered by a certified factory definition code,
Category and category manufacturing enterprises. can adopt the mode to implement certification;
Category and category manufacturing enterprises. They should adopt a model for certification.
For production enterprises that have obtained certificates for products within the scope of this rule
Re-certification application, and the factory definition code is the same as the certified factory definition code, or
Covered by certified factory definition codes,
Class, class, class, and class production enterprises. The model can be used for certification.
Adopt design certification
Only class and class manufacturers can use the model when applying for certification
Or model implementation certification, and the producer and manufacturer should have the corresponding design capabilities and
Benchmark data for design qualification.
Design Capability Evaluation
Evaluate producers' production enterprises through document review and/or on-site review
Whether the industry has the corresponding design capabilities and benchmark data for design qualification. On-site review can
In conjunction with the enterprise quality assurance capability check.
If the design capability evaluation meets the requirements, certification can be implemented by using a model or a model;
If the design capability evaluation does not meet the requirements, the certification shall be implemented using a model or models.
For production enterprises without obtaining certificates for products within the scope of these rules
Application for initial certification,
Production enterprises. can adopt the mode to implement certification;
Production enterprises. should adopt the model for certification.
In principle, for integrated power capacitor compensation devices, the compensation capacity can cover the minimum voltage.
Container capacity
The division of the distribution cabinet (box) with compensation is based on the table,
In principle, the lower limit of its compensation capacity coverage is the minimum branch capacitor capacity.
Coverage principles for products within the same certification unit
Standard series products can have multiple rated voltage levels in the same unit.
Under the same rated short-time withstand current, the same insulation voltage, and the same structure, the high amount
Constant voltage products can cover low rated voltage products.
Under the condition of the same rated current and the same structure, products with high protection level can be covered.
Covering products with low protection level; the same certification unit can also have different housing protection levels.
When applying for certification, the certificate client shall describe the products with different protection levels and shall evaluate them.
Corresponding temperature rise limit and necessity of protection level verification.
The principle of moderately relaxing the division of units according to the classification management of production enterprises
In principle, under the premise of ensuring that the certification results are valid and the management is controlled,
The application of the certificate client is moderately combined with the classification management and certification risk control principles of the manufacturing enterprise.
Wide cell division.
Planning of certification units for different certification clients, different producers, and different production enterprises
Implementation,
Sub-principle
Different certification clients, different producers (manufacturers), different production enterprises (production
Factory) products should be used as different application units.
The same product produced by the same producer (manufacturer) and different production enterprises (production plants)
When the production enterprise is a class, the type test design identification can be performed in only one unit.
Products produced by other types of manufacturing enterprises must provide product conformity declarations, product descriptions
And other materials are checked by the laboratory; for products of the manufacturing enterprises of the same type, each unit requires
Carry out type test design qualification.
The same product produced by different producers and the same production enterprise, and the product design side is the same,
Then the type test design identification can be performed on only one sample of the unit.
Sample data shall be provided for consistency check, and if necessary, it may be verified through tests.
Certification process and time frame requirements
Application for and acceptance of certification
The certification client submits an application for certification via the Internet (). Shen
When requested, you should fill in the company information and product information, and if necessary, provide the business registration certificate,
Organization code, industrial policy compliance certificate, product description, agreement, etc.
Review the application in accordance with relevant requirements and send it for acceptance or rejection within one working day
Notification of acceptance, or requesting the certification client to re-apply for certification after rectification.
After accepting the certification application, determine the application site according to the classification management requirements of the manufacturing enterprise.
Applicable certification models and divisions, formulate certification schemes and notify certification clients.
The authentication client can propose the authentication mode and
Unit division requirements, providing the necessary information, will be based on the classification management results of production enterprises and
The client negotiates and determines the applicable authentication mode and unit division. Consensus accepted
Please also formulate an authentication scheme; if the negotiation is inconsistent, the client may use other applicable authentication models
Application for modification of formula and unit.
Certification scheme
The certification center shall formulate a certification scheme within one working day after acceptance and notify it of certification
Client. Certification schemes usually include the following.
() The authentication mode and unit division used;
() List of application materials to be submitted;
() Laboratory information;
() The required certification process and time limit;
() Estimated certification costs;
() Contact information of the staff of the certification center;
() Responsibility arrangements of certification parties in all aspects of certification implementation;
() Other matters that need to be explained.
Application Information Review
After the application is accepted, the accreditation client shall submit to
Provide relevant application materials and technical materials.
And or the laboratory shall, within one working day, update the relevant information provided by the certification client
Audit, and send notification of the results of the data review to the certification client. If the data does not meet the requirements,
The certification client shall make corrections as required.
5.4
The certification client shall be responsible for the authenticity of the information provided. And laboratory commissioned for certification
The authentication information provided by a person shall be managed and stored, and shall bear the obligation of confidentiality.
Type test
For certification applications that require type testing, and the application data is qualified,
Formulate a type test plan within one working day and notify the certification client. Type test party
The plan includes sample requirements and quantities, testing standards and items, and laboratory information.
Usually, the certification client prepares the samples according to the requirements of the type test plan and sends them to
Designated laboratories; if necessary, for type and type manufacturing enterprises, type tests
The requirements of the plan are to obtain samples by way of on-site sampling and sealing and send them to the client
Scheduled laboratory.
After receiving the samples, the laboratory shall check the samples according to the relevant regulations within the working day.
Review the authenticity and notify the results of the review
Test results, issue test notices or take appropriate action
The laboratory arranges sample testing after receiving the test notification, and the test time generally does not exceed
Working days (calculated from the date of issuing the test task, excluding the
Time required for rectification and retesting), and type test time may be appropriate when there are environmental test items
When extended to working days
When there are unqualified items in the test, the certification client is allowed to make rectifications;
It is completed within the prescribed time limit. If the time limit is exceeded, the client shall be deemed to have abandoned the application;
The trustee may also voluntarily terminate the application.
After the type test is completed, the laboratory shall issue a type test report in the prescribed format, and
The relevant provisions of the prototype verification shall dispose of the test samples and related materials.
Design qualification
For certification applications that use design certification for certification, the certification client must provide
The design appraisal report and related materials completed by the producer shall be sent to the laboratory within one working day
Notice of design qualification review.
Design identification provided by the laboratory within one working day after receiving the relevant information
Report and related information for review, issue audit report (including audit results,
Step test recommendations, etc.).
After receiving the audit report, formulate a type test plan within working days and notify
Certification client. The requirements of other processes and time frames are the same as those of "type test".
Within a working day
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of CQC-C0301-2014_English be delivered?Answer: Upon your order, we will start to translate CQC-C0301-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of CQC-C0301-2014_English with my colleagues?Answer: Yes. The purchased PDF of CQC-C0301-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|