|
US$979.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. CNCA C13-01-2014: China Compulsory Certification Implementation Rules - Safety glass
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| CNCA C13-01-2014 | English | 979 |
Add to Cart
|
5 days [Need to translate]
|
China Compulsory Certification Implementation Rules - Safety glass
| |
CNCA C13-01-2014
|
PDF similar to CNCA C13-01-2014
Standard similar to CNCA C13-01-2014 GB/T 30020 GB/T 32061 JC/T 897
Basic data | Standard ID | CNCA C13-01-2014 (CNCA-C13-01-2014) | | Description (Translated English) | China Compulsory Certification Implementation Rules - Safety glass | | Sector / Industry | China Compulsory Certification (CCC) Implementation Rules | | Classification of Chinese Standard | Q30 | | Classification of International Standard | CNCA Announcement No. 23 of 2014; CNCA Announcement No. 23 of 2014 | | Word Count Estimation | 28,287 | | Date of Issue | 7/16/2014 | | Date of Implementation | 9/1/2014 | | Older Standard (superseded by this standard) | CNCA 04C-028-2009 | | Regulation (derived from) | CNCA Announcement No. 23 of 2014; CNCA Announcement No. 23 of 2014 | | Issuing agency(ies) | China National Accreditation Administration for Certification and Accreditation | | Summary | This standard specifies the China Compulsory Certification (CCC) implementation rules for Safety glass. This standard defines the Safety glass's certification unit; certification entrusting; document requirements; sample requirements; certification proced |
CNCA C13-01-2014: China Compulsory Certification Implementation Rules - Safety glass---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Number. CNCA -C13-01.2014
Mandatory product certification and implementation rules
Safety glass
Issued on. 2014-07-16
2014-09-01 implementation
China Certification and Accreditation Administration Commission issued
table of Contents
0 .1 Introduction
1. Scope ..1
2 Standards for Certification ..1
3 authentication mode 2
4 Authentication unit divided ..2
5 3 certification commission
5.1 proposed commission of the certification and acceptance of .3
5.2 application information .3
5.3 implementation arrangements .3
6 3 Certification
6.1 Type test 3
6.2 Initial factory inspection 4
6.3 Evaluation and Certification decisions 5
6.4 Time frame for certification .5
7-up inspection 5
Follow-up examination after ..6 7.1 certified
7.2 certified production site sample or to check ..6
7.3 certified sample testing or inspection market .6
7.4 up inspection frequency 7
7.5 certified after supervision records ..7
After 7.6 rating ..7 up inspection results
8 7 Certification
8.1 certificate is valid ..7
7 8.2 Certificate Content
Change 8.3 Certification/expansion .7
8.4 certificate cancellation, suspension and revocation of 8
Use certificates 8 8.5
8 9 certification mark
9.1 Flag Shape 8
9.2 Gasch requirements .9
10 charges .9
11 certification responsibilities 9
12 Certification Rules 9
Annex 1. safety glass partition scheme compulsory certification unit 11
Annex 2. Summary of performance and security-related glass varieties and specifications of models ..14
Annex 3. safety glass type test project, and the number of test ..21
0 Introduction
These rules follow the laws and regulations of the basic requirements for safety glass market access based on safety glass
Security risks and the risk of glass certified product formulation, specifies the safety glass products implement mandatory product recognition
Certified basic principles and requirements.
The rules and CNCA issued a "compulsory product certification and implementation rules, the company classification
Management, authentication mode selection and determination "," compulsory product certification and implementation rules, the company detected
Resources and other certification results of use "," mandatory product certification factory inspection common implementing rules
Requirements "and supporting the use of general implementing rules.
The certification body should be based on common rules and the implementation of this rule requires the preparation of certification implementation details, and supporting
General Implementing Rules and the Rules implemented jointly.
Manufacturers should ensure that certified products can continue to meet the certification requirements and applicable standards.
1 Scope
This rule applies to safety-related vehicles (including construction machinery, agricultural and forestry machinery vehicles),
Laminated glass, automotive glass architectural and regional railway vehicle glass, including cars, car
Hollow glass, automotive glass, automotive glass plastic composite materials, laminated glass used in construction, building
Built with tempered glass, construction (security) insulating glass, laminated glass used in construction of solar photovoltaic, too
Solar energy PV module encapsulation of tempered glass, laminated glass for railway vehicles, railway vehicles with tempered glass,
Railway vehicle insulating glass.
This rule does not apply to chemical tempered glass, tempered glass used solely for furniture, appliances and other products.
Since laws and regulations or relevant product standards, technology, industrial policy and other factors caused by changes
The scope of the adjustment should be based on the CNCA announcement shall prevail.
2 Standards for Certification
(1) and related automotive safety glass
GB 9656 "automotive safety glass" standard mandatory provisions.
(2) and safety-related performance glass used in construction
GB 15763.2 "architectural safety glass - Part 2. glass", GB 15763.3 "building
Safety glass - Part 3. Laminated glass ", GB 29551" construction of solar photovoltaic laminated glass "
Standard mandatory provisions, GB/T 11944-2012 "hollow glass" standard of 6.3, 6.4, 6.5
Provisions.
(3) and safety-related railway vehicle glass
GB 14681.2 "locomotives and ships Electrically heated glass - Part 2. Electric Locomotive heated glass" standard
Registration mandatory provisions, GB 18045-2000 "railway vehicle safety glass" standard in Chapter 5 and
Physical and mechanical properties of the relevant provisions, which accelerated durability railway vehicle according to standard insulating glass
Class I test level test.
Should be running the latest version of the national standardization administrative department issued the above criteria in principle. When required
When using the other version of the standard, it should apply the relevant standards issued by the CNCA announcement
carried out.
3 authentication mode
Basic authentication mode implementation of safety glass products mandatory certification are.
Initial type testing facility after checking up inspection
Said certified after supervision refers to the follow-up inspection Follow-up inspection, production site inspection or sample detection
Investigation, inspection or sampling the market in one of three ways.
The certification body shall "compulsory product certification and implementation rules production enterprise management, certification
Mode selection and determination "requirements, the production enterprises category management, category management combined with results
On the basis of basic authentication mode appropriate changes on the relevant factors, to determine the principal certification can apply
Authentication mode.
4 certification application unit
On the principle of division of the authentication unit of certified products according to the type, thickness, structure, transmission ratio, dense
Same way seal products and materials unit division. Same manufacturer, the production of different visual processing site
For the different units. Principal certification program for certification according to cell division commissioned specifically classified annex
1 "Safety Glass Compulsory Certification unit division scheme."
5 certified delegate
5.1 certification commission proposed and accepted
Certification principal needs in an appropriate manner to the certification commission for accreditation bodies, certification bodies respond recognize
Certificate commissioned processing, and certified in accordance with the Regulations of the deadlines of feedback admissible or inadmissible
information.
The certified products should be all kinds of normal production and comply with state laws and regulations and relevant
Industrial policy requires otherwise, the certification agency shall not accept the relevant certification commission.
5.2 Application Information
The certification body should be based on laws, regulations, standards and certification and implementation of the invention requires certification implementing regulations
Indeed delegate lists (certification shall include at least the power of attorney or contract, certified principal/producer/production
Proof of registered enterprises, etc.).
Certification Certification principal shall provide the information requested details and delegate lists
"Glass varieties and safety-related performance and specification model summary table" (Annex 2). The certification body responsible for review
Nuclear, management, preservation, confidential information, and data audit results to the authentication principal.
5.3 Implementation Arrangements
The certification body and certification should be the principal sides agreed to implement various aspects of the responsible safety certification
Row, and according to their actual production and management of classification, according to the rules and implementation of certification rules to
Seeking to determine the authentication scheme and inform the authentication principal.
6 Certification
6.1 Type tests
After the certification agency to receive certification commission and determine the authentication scheme before type testing. Type Test
General inspection after the implementation of factory inspection, if necessary, before the factory inspection may be implemented.
6.1.1 Type test sample request
The certification body should be clearly based on enterprise management in the case of certification or implementing regulations for unit
Unit combination sampling/sample delivery specific requirements. Type test samples shall be taken by the certification body pumping site
Sample/seal-like manner.
Certification principal should ensure that they provide a sample of normal production and confirm the actual production capacity
Product conformance certification body and/or laboratory samples provided by the client response authentication authenticity
Review of laboratory doubt the authenticity of the sample, it should explain the situation to the certification body, and make the phase
It should be handled.
6.1.2 Type test project and requirements
Type of pilot projects, based on the number and certification standards, see "safety glass type test project,
Quantity and testing standards "(Annex 3), shall meet the certification requirements based on standards related provisions.
Implementation 6.1.3 type testing
Type tests specified by CNCA Laboratory Laboratory samples for type test
Experience, should ensure that the detection conclusion is true, accurate, complete the detection of the whole process of making records and keep them in archives,
To ensure that the testing process and results recorded with traceability.
As manufacturers have "compulsory product certification and implementation rules and other manufacturers testing resources
Using the authentication result of "testing conditions and certification requirements of the standard, manufacturers can take advantage of real testing resources
Shi production site testing, test report issued by designated laboratories; manufacturers do not have such standards and
Certification test conditions required by the Regulations, samples should be sent to the designated laboratory.
6.1.4 Type test report
The certification body should specify a uniform type test report format. After completion of the type test, the laboratory shall
Timely issue type test report, which shall be accurate, clear and complete. Certification principal in prison after inspection
Christ should be able to provide a complete and valid type test reports to the accreditation bodies and law enforcement agencies.
6.2 Initial factory inspection
Initial factory inspection, including certification bodies to produce factory quality assurance ability and product consistency control
The system can meet the certification requirements of the evaluation.
6.2.1 Basic Principles
The certification body should clearly factory quality assurance ability and product consistency control certification implementing regulations
The basic system requirements.
Certification principal and manufacturers should be in accordance with the relevant provisions of the basic requirements for establishing, implementing and continually
Factory quality assurance ability to maintain product consistency and control system to ensure that certified products continue to meet
Certification requirements.
The certification body shall produce factory quality assurance ability and product consistency control for compliance check
check.
6.2.2 factory quality assurance ability inspection requirements
Mandatory product certification inspector certification body should appoint a national registered qualifications composed inspection
Investigation Team, the production enterprises factory quality assurance ability examination.
Check shall cover all production sites involved in the authentication unit. If necessary, the certification body to be produced
Place outside the enterprise implementation of extended inspections.
6.2.3 product consistency inspection requirements
Certification bodies to confirm compliance by the enterprise products, randomly selected authentication products including, but not
Limited to the following contents of inspection.
a. Check product certification marks;
b. Certified products on-site tests;
c. Certification and Application/filing of key raw materials, consistency checks;
Product consistency check shall cover at least each type of product certification.
6.3 Evaluation and Certification decisions
The certification body of type testing, initial factory inspection conclusions and relevant data/information integrated
Evaluations, through the issuance of the certificates by the unit; do not pass the evaluation, certification terminated.
6.4 Time frame for certification
The certification body shall limit certification to make clear that all sectors, and to ensure that related work by age
Required to complete.
Principal certification certification activities shall be actively cooperate.
Under normal circumstances, accepting the certification issued by the commission from the client to the authentication certificate within 90 days,
But for technical reasons or because the standard test cycle is too long and should be in the relevant rules
Instructions.
7-up inspection
Certified after supervision refers to the certification body according to the production enterprise management and production of the certified product
Enterprises supervision.
The certification body should be combined with the production of enterprise management and the actual situation, specifically in Certification Conditions
Follow-up inspection requirements for specific mode selection.
Follow-up examination after 7.1 certified
7.1.1 Principles
The certification body should be based on the production and enterprise management, the certified products and their manufacturers real
Implement effective follow-up checks to ensure that certified products meet standard requirements and keep up with the type test sample
Product consistency, quality assurance verification manufacturers the ability to continue to meet certification requirements.
After follow-up examination should be certified in the production of normal production, preferred without prior notice subject
Conduct inspections side manner.
7.1.2 Content
The certification body should be certified after the Regulations expressly certified follow-up examination of the content and requirements. Track
Check the contents of the way business should be based on the classification of the corresponding management.
7.2 certified production site after the sample or to check
7.2.1 Principles
Production site sample detection or certified check shall cover at least the product category. Production is now taken
Field sample or to check the way after the implementation of follow-up inspection, the certification clients, producers, students
Production enterprises should cooperate.
7.2.2 Content
The certification body shall be established at the production site certification implementation details or to check the sample
Content and requirements, the certification body should specify the sampling and testing program classification according to business principles and product features,
Produced designated officer qualified products (including production line, warehouse or port, etc.) by sampling
Extraction program.
As manufacturers have "compulsory product certification and implementation rules and other manufacturers testing resources
Testing conditions using the authentication result of "standards and certification requirements, the certification body can make use of the subject company
Implementation measured resource production site sampling, test reports issued by designated laboratories; producing enterprises
Does not have the certification standards and test conditions required by the Regulations, samples should be sent to the designated laboratory.
7.3 certified market sampling and testing or inspection
7.3.1 Principles
Take the market or to check a sample embodiment embodiment supervision of certified clients, students
Producers, manufacturers and should be confirmed with samples taken from the market.
7.3.2 Content
The certification body should develop market sampling or to check the content and requirements of the Regulations.
7.4 up inspection frequency
The certification body should be based on the production of enterprise management, production of different types of enterprises to adopt
After various post-up inspection content and frequency of inspection certificates, specific principles should be certified in the implementing regulations
clear.
7.5 up inspection records
The certification body shall record the whole process of follow-up inspection and archive retained to ensure that certified
Processes and results traceable.
After 7.6 certified evaluation of inspection results
The certification body based on follow-up inspection after inspection, sample testing and the conclusions about comprehensive information on
Evaluated by the evaluation, you can continue to maintain certification, the use of certification marks; evaluation is not adopted,
The certification body should make cancellation/suspend/revoke certification process in accordance with the respective circumstances, and to the public.
8 Certification
8.1 certificate is valid
Covered by this rule certificate is valid for 5 years within the validity period, valid certificates
After relies certified certification bodies inspection. Expiry of the certificate is valid, you need to continue to make
Use, certified accreditation commission principal shall, before the expiry of the permit certificate valid for 90 days
After the last card is valid within the scope of the results of monitoring conformity, the certification body may issue a new certificate directly.
8.2 Certificate Content
Certificate content should follow the "compulsory product certification regulations," Article 21 of the request,
And in accordance with the requirements of the principle of division of cells.
Change 8.3 Certification/expansion
Follow-up, when the certification, product features, other issues related to the certification body change occurs
When more time, or need to extend the authentication client has obtained a certificate of coverage range of products for Certification
People should certification bodies change/extension commission, change/extension before implementation after approval by the certification body.
The certification body should be under the premise of risk control, certification implementing rules explicitly change/extension to
Seek, and change/extend the content document review, inspection and/or inspection (where applicable), evaluation
After the adoption be approved change/extension.
8.4 certificate cancellation, suspension and revocation
Cancellation of certificates, suspension and revocation based on "compulsory product certification regulations," and "strong
Compulsory product certification cancellation, suspension, revocation of the implementation of the relevant provisions of the rules' implementation and certification bodies.
The certification body shall determine does not meet the certification requirements and the scope of product categories, and to adopt appropriate methods of foreign public
Advertisement is canceled, suspended and revoked certificates.
8.5 Use of certificates
Use of the certificates shall comply with the "Regulations for Compulsory Product Certification" requirements.
9 certification mark
Certification mark of the management, use should follow the "Compulsory Certification Mark" requirements.
9.1 Shape Flag
Safety-related automotive glass and glass for rolling stock should be used molding, screen printing,
Etching or sandblasting method applied on permanent signs and symbols should be clear and permanent mark pattern as shown below.
Permanent signs molding, screen printing, etching or sandblasting production
Security-related architectural glass can be applied on the National CCC mark grant and manage administration issued
Standard logo hair can also be used molding, screen printing, etching or sandblasting method plus Shiyong
Durability flag. When not to use permanent markers or standard part of the construction sign on a glass body, should
Or accompanying documents on the minimum packaging (such as certificates) are used flag standard emblem is in the following figure.
Standard logo
9.2 Gasch requirements
Safety glass products using molding, screen printing, etching or sandblasting own printing plus Shiyong
When long signs, signs should be in place at the filling facility code, and by the National CCC certification mark issued
Approval put regulatory agencies.
10 charges
Certification fees by the certification bodies and laboratories on the national compulsory product certification fees in accordance with
Provisions of the standard fee.
The certification body shall be in accordance with national mandatory product certification fees on the initial factory inspection, eligible
After the card man-days follow-up inspection fee standards, reasonably determine the specific charges man-days.
11 certification responsibilities
Certification bodies and their certification decision made by its personnel should be responsible for certification results.
The laboratory shall be responsible for test results and test reports.
Certification bodies and their appointed Inspectors shall be responsible for the factory inspection.
Certification principal responsible for the authenticity of their information and samples submitted legitimacy.
12 Certification Rules
The certification body should be based on the principles and implementation of the requirements of this rule, the development of scientific, ...
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of CNCA C13-01-2014_English be delivered?Answer: Upon your order, we will start to translate CNCA C13-01-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of CNCA C13-01-2014_English with my colleagues?Answer: Yes. The purchased PDF of CNCA C13-01-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|