Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 32898-2016 English PDF

US$499.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32898-2016: Configuration guide of relay protection for pump-storage generator and transformer unit
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32898-2016499 Add to Cart 4 days Configuration guide of relay protection for pump-storage generator and transformer unit Valid

Similar standards

GB/T 38953   GB/T 37155.2   GB/T 19826   GB/T 32897   GB/T 32890   

Basic data

Standard ID: GB/T 32898-2016 (GB/T32898-2016)
Description (Translated English): Configuration guide of relay protection for pump-storage generator and transformer unit
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K45
Classification of International Standard: 29.120.50
Word Count Estimation: 25,218
Date of Issue: 2016-08-29
Date of Implementation: 2017-03-01
Regulation (derived from): National Standard Announcement 2016 No.14
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32898-2016: Configuration guide of relay protection for pump-storage generator and transformer unit


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Configuration guide of relay protection for pump-storage generator and transformer unit ICS 29.120.50 K45 National Standards of People's Republic of China Pumped Storage Power Generation Motor Transformer Group Relay Protection Configuration guidelines transformerunit 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface III 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 General 2 5 Generator motor protection 2 6 Transformer protection 8 7 Requirements for related circuits and equipment 10 Appendix A (informative) Pumped Storage Power Station Generating Motor Transformer Group Protection Configuration Reference Example 12 Appendix B (informative) Pumped storage power station Generating motor Transformer group Protection outlet mode Reference example 15 Appendix C (informative) Pumped storage power plant Generating motor Transformer group Protection latching Logic reference example 18 Reference 21

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents. This standard is proposed by the China Electricity Council and centralized. The main drafting unit of this standard. State Grid New Source Holdings Limited, the South network peak shunting power generation company, Nanjing Nairui following the electrical limited company Division, East China Tongbai Pumped Storage Power Co., Ltd., Hubei Bailianhe Pumped Storage Co., Ltd., State Grid New Source Holdings Limited Beijing Shisanling storage power plant, east of Yixing Pumped Storage Company Limited. The main drafters of this standard. Feng Yiping, Li Jianguang, Hao Guowen, Li Hua, Wang Guang, He Rufei, Ye Weimin, Jingcheng, Lu Zhijuan, Meng Congcong, Li Dehua, Cai Zhaohui, Chen Jun, Wang Kai, Zhang Yonghui, Huang Jiande, Li Jianhui, Shen Quanrong, Huang Kun, Yu Xiaoyan, Yang Jianhong, Zhang Lei. Pumped Storage Power Generation Motor Transformer Group Relay Protection Configuration guidelines

1 Scope

This standard specifies the basic configuration principle of power generation motor, main transformer and excitation transformer relay of pumped storage power station. Type, latching logic, associated circuits and equipment requirements. This standard is applicable to the installation of stand-alone capacity of 150MW and above the reversible pump water turbine generator sets, power generation motor terminal installation Design of Relay Protection for Generator Transformer Group of Pumped Storage Power Station of Circuit Breaker and Commutation Switch. Stand-alone capacity of 150MW or other main wiring of the pumped storage power station can refer to the implementation.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. GB/T 2900.1 Basic terminology for electrical terminology Electrician Terminology Relays Electrotechnical terminology - Power system protection GB/T

3 terms and definitions

The terms and definitions defined in GB/T 2900.1, GB/T 2900.17, GB/T 2900.49 and the following terms and definitions apply to this document. 3.1 Power generation conditions generatormode From the reservoir on the water flow down the reservoir, the drive unit pump turbine wheel rotation, the water potential energy into the energy of the operating state. 3.2 Pumping conditions Units from the reservoir up the reservoir pumping, the energy into the water potential energy of the operating state. 3.3 Power generation phase modulation conditions Rotary chamber after the water wheel rotation in the air, the unit power generation and the state of the grid operation. 3.4 Pumping phase adjustment conditions pumpcondensermode Rotary chamber after the pressure of the wheel in the air rotation, the direction of the unit pumping and running the state. 3.5 Static variable start staticfrequencyconverterstartup The use of static frequency conversion device by starting the circuit drive unit to start the pumping direction of the start mode. 3.6 Back-to-back start backtobackstartup A unit starts with a drag condition and drives the start-up mode of the other unit in the direction of pumping by starting the loop.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32898-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32898-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32898-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32898-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.