HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

QC/T 897-2011 PDF English

US$125.00 · In stock · Download in 9 seconds
QC/T 897-2011: Technical specification of battery management system for electric vehicles
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Obsolete
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
QC/T 897-2011English125 Add to Cart 0-9 seconds. Auto-delivery Technical specification of battery management system for electric vehicles Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: QC/T 897-2011
      

Similar standards

QC/T 824   QC/T 1023   QC/T 895   QC/T 821   

QC/T 897-2011: Technical specification of battery management system for electric vehicles

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/QCT897-2011
QC Automotive Industry Standard of the People��s Republic of China ICS 43.040 E 35 Technical Specification of Battery Management System for Electric Vehicles Issued on. DECEMBER 20, 2011 Implemented on. JULY, 2012 Issued by. Ministry of Industry and Information Technology of the People's Republic of China

Table of Contents

Foreword... 3 1 Scope... 4 2 Normative References... 4 3 Terms and Definitions... 4 4 Requirements... 5 5 Test Method... 10 6 Inspection rules... 18 7 Marking... 20 Annex A (Informative) Typical Charge-discharge Conditions of Battery System ... 21

1 Scope

This Standard specifies the terms and definitions, requirements, test methods, inspection rules and marking of the battery management system for electric vehicles. This Standard applies to the power battery management system for electric vehicles.

2 Normative References

The following documents are essential to the application of this standard. For dated references, only the dated editions apply to this standard. For undated references, the latest edition (including all amendments) applies to this standard. GB/T 191-2008 Packaging - Pictorial Marking for Handling of Goods GB/T 2423.4 Basic Environmental Testing Procedures for Electric and Electronic Products - Test Db. Damp Heat, Cyclic GB/T 2423.17 Environmental Testing for Electric and Electronic Products - Part 2. Test Method-Test Ka. Salt Mist GB/T 2423.22 Environmental Testing for Electric and Electronic Products - Part 2. Test Method - Test N. Change of Temperature GB/T 17619 Limits and Methods of Testing for Immunity of Electrical/ Electronic Sub-assemblies in Vehicles to Electromagnetic Radiation GB/T 19596 Terminology of Electric Vehicles

3 Terms and Definitions

For the purpose of this Standard, the following terms and definitions and those defined in GB/T 19596 apply. 3.1 Battery electronics It is an electronic device which acquires the data of battery monomers (integrated) or battery modules (integrated) related to electricity and heat and provides such data for the battery control unit. 3.2 Battery control unit It is an electronic control unit which controls or manages the electrical or thermal performance of the battery system and is capable of information interaction with other control units in the vehicles. 3.3 Battery management system It is an electronic device composed of battery electronics and battery control system. 3.4 Battery pack It is the energy storage unit, including integration of battery monomers or battery modules, battery electronics, high-voltage circuit, low-voltage circuit, cooling unit and mechanical assembly. 3.5 Battery system It is the energy storage unit, including integration of battery monomers or battery modules, battery management system, high-voltage circuit, low-voltage circuit, cooling unit and mechanical assembly.

4 Requirements

4.1 General requirements 4.1.1 The battery management system shall be capable of detecting the data of batteries related to electricity and heat, at least including the parameters such as voltage of battery monomers or battery modules, current of battery group return circuit and internal temperature of battery pack. 4.1.5 When the battery management system is used in an electric vehicle with the plug-in charging function, it shall capable of controlling and managing the charging process by real-time communication or other signal interaction modes with on-board or off-board battery charger. 4.2 Technical requirements 4.2.1 Insulation resistance. The insulation resistance value between the live parts, which are connected with the battery management system and power battery, and the shell shall not be less than 2 M��. 4.2.2 Insulation voltage withstand performance. The battery management system shall be capable of withstanding the insulation withstand voltage test as required by 5.3, without disruptive discharges such as breakdown or flashover during the test. 4.2.6 Overvoltage operation The battery management system shall be capable of operating normally at the supply voltage specified in 5.7, and shall meet the requirements of 4.2.3 for the accuracy for the measurement of the state parameters. 4.2.7 Undervoltage operation The battery management system shall be capable of operating normally at the supply voltage specified in 5.8, and meet the requirements of 4.2.3 for the accuracy for the measurement of the state parameters. 4.2.12 Resistance to temperature changes The battery management system shall be capable of withstanding the temperature change test specified in 5.13, and shall be capable of normal operation after the test, and shall meet the requirements of 4.2.3 for the accuracy for the measurement of the state parameters. 4.2.15 Resistance to vibration The battery management system shall be capable of withstanding the vibration test specified in 5.16, and shall be capable of normal operation after the test, and shall meet the requirements of 4.2.3 for the accuracy for the measurement of the state parameters. 4.2.16 Resistance to power polarity reversal The battery management system shall be capable of withstanding the power supply polarity reversal test specified in 5.17, and shall be capable of normal operation after the test, and shall meet the requirements of 4.2.3 for the accuracy for the measurement of the state parameters.

5 Test Method

5.1 Test conditions. Unless otherwise specified, the test shall be carried out at an ambient temperature of 18��C to 28��C, a relative humidity of 4.5% to 75%, and an atmospheric pressure of 86 kPa to 106 kPa. 5.1.2 Test voltage. 14V �� 0.2 V (nominal 12 V) or 28 V �� 0.4 V (nominal 24 V), unless otherwise noted or specific to the manufacturer. 5.1.3 Test instrumentation. All test instruments, equipment shall have sufficient accuracy and stability, whose accuracy is higher than the measured index accuracy by an order of magnitude or error is less than 1/3 of the measured parameter tolerance. 5.2 Insulation resistance Measure the insulation resistance by applying a voltage of 500 V DC between the voltage-sensing circuit of the battery management system and its shell. 5.3 Voltage withstand performance insulation A sinusoidal waveform AC voltage of 50 Hz is applied between the voltage sampling circuit of the battery management system (corresponding to the positive pole of the battery system) and its shell. The test voltage (effective value) is the maximum operating voltage that can occur in this circuit (if less than 550V, the test voltage is 550 V). It lasts for 1 min. 5.4 Accuracy for the measurement of state parameters 5.5 Accuracy for SOC estimation 5.5.1 General rules 5.5.2 Available capacity test Conduct the test in accordance with the procedures as follows. 5.5.3 SOC Test. 5.6 Battery fault diagnosis Establish the triggering conditions for the fault items listed in Table 2 through the simulation system, and record the corresponding fault items and their triggering conditions. Conduct function check for the other fault diagnosis items in accordance with the requirements of the manufacturer��s specifications. 5.7 Overvoltage operation Adjust the power supply voltage to 16 V or 32 V, operate continuously under the power supply voltage, record the data acquired by the battery management system during the test (not less than 2 voltage acquisition channels and not less than 1 temperature acquisition channel for the monomers or modules), and compare it with the corresponding data tested by the testing equipment. 5.10 Low-temperature operation Place the battery management system in the operating state into an incubator with the initial temperature of room temperature, lower the temperature to -25��C �� 2��C before maintaining it for 1 h, record the data acquired by the battery management system during the test (not less than 2 voltage acquisition channels and not less than 1 temperature acquisition channel for the monomers or modules), and compare it with the corresponding data tested by the testing equipment. 5.11 Resistance to high temperature Place the battery management system into an incubator with the initial temperature of room temperature, and maintain the temperature for 4 h after reaching 85��C �� 2��C. Make the battery management system start to work after recovering to room temperature, record the data acquired by the battery management system (not less than 2 voltage acquisition channels and not less than 1 temperature acquisition channel for the monomers or modules), and compare it with the corresponding data tested by the testing equipment. 5.15 Resistance to heat and humidity Conduct the damp heat test for the battery management system in accordance with the specifications of GB/T 2423.4 (at the high temperature 55��C). The test lasts for 2 cycles (48 h). 5.16 Resistance to vibration Fix the battery control unit and the control unit of battery electronics (if any) on the vibration generator in accordance with the actual installation state of the complete vehicle or substantially equivalent conditions thereof, and conduct the sweep frequency vibration test in the three directions including up and down, left and right and front and back. The test in each direction lasts for 8 h. The vibration waveform of the test is sinusoidal. 5.17 Resistance to power polarity reversal Set the input power supply to the reverse voltage value before connecting the power supply of the battery management system, and then maintain it for 1 min. Make sure the power supply of the battery management system is normal after the test, determine whether it is in a normal operating state, and record the data acquired by the battery management system if normal (not less than 2 voltage acquisition channels and not less than 1 temperature acquisition channel for the monomers or modules), and compare it with the corresponding data tested by the testing equipment. 5.18 Immunity to electromagnetic radiation Conduct the test in accordance with the specifications of GB/T 17619.During the test, record the data acquired by the battery management system (not less than 2 voltage acquisition channels and not less than 1 temperature acquisition channel for the monomers or modules), and compare it with the corresponding data tested by the testing equipment.

6 Inspection rules

6.1 Inspection categories The inspection can be divided into exit-factory inspection and type inspection. 6.2 Exit-factory inspection 6.2.1 The battery management system can only be delivered after it passes the inspection of the quality inspection department of the manufacturer, and shall be accompanies by the certificate of conformity. 6.2.2 Batch. the products produced each day is a batch. 6.3 Type inspection 6.3.1 A type inspection shall be conducted in one of the following cases. 6.3.3 In the type inspection, if there are unqualified items, the number of samples shall be doubled from the batch of battery management systems for a reinspection on the unqualified items; and if the reinspection fails to pass, then the type inspection fails to pass.

7 Marking

7.1 The battery management system shall be marked as follows. 7.2 The exterior of the packing case shall be marked as follows. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of QC/T 897-2011 be delivered?

Answer: The full copy PDF of English version of QC/T 897-2011 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of QC/T 897-2011_English with my colleagues?

Answer: Yes. The purchased PDF of QC/T 897-2011_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- QC/T 897-2011 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of QC/T 897-2011?

A step-by-step guide to download PDF of QC/T 897-2011_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "QC/T 897-2011".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9