HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (12 Jan 2025)

QC/T 770-2020 PDF English


Search result: QC/T 770-2020_English: PDF (QC/T770-2020)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
QC/T 770-2020English230 Add to Cart 0-9 seconds. Auto-delivery. Dry type air cleaner assembly of automobiles Valid
QC/T 770-2006English519 Add to Cart 3 days Specifications for dry type air cleaner assembly of automobiles Obsolete
BUY with any currencies (Euro, JPY, GBP, KRW etc.): QC/T 770-2020     Related standards: QC/T 770-2020

PDF Preview: QC/T 770-2020


QC/T 770-2020: PDF in English (QCT 770-2020)

QC/T 770-2020 QC AUTOMOBILE INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 43.060.20 T 13 Replacing QC/T 770-2006 Dry type air cleaner assembly of automobiles ISSUED ON: AUGUST 31, 2020 IMPLEMENTED ON: JANUARY 01, 2021 Issued by: Ministry of Industry and Information Technology of PRC Table of Contents Foreword ... 5  1 Scope ... 7  2 Normative references ... 7  3 Terms and definitions ... 8  4 Technical requirements ... 8  5 Test method ... 14  6 Inspection rules ... 16  7 Marking, packaging, transportation, storage ... 17  Appendix A (Informative) Prefilter type ... 19  Dry type air cleaner assembly of automobiles 1 Scope This document specifies the technical requirements, test methods, inspection rules, marking, packaging, transportation, storage of dry-type air cleaner assemblies of automobiles. This document applies to dry-type air cleaner assemblies (hereinafter referred to as assemblies) of automobiles (excluding passenger cars), which have a volume flow of less than 4000 m3/h. For the dry air cleaners for construction machinery, agricultural and forestry machinery, ships and stationary power, they may also refer to this document. 2 Normative references The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, for dated reference documents, only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document. GB/T 2423.7-2018 Environmental testing - Part 2: Test methods - Test Ec: Rough handling shocks, primarily for equipment-type specimens GB/T 2423.38-2008 Environmental testing for electric and electronic products - Part 2: Test methods - Test R: Water test method and guidance GB/T 2423.55-2006 Environmental testing for electric and electronic products - Part 2: Test methods - Test Eh: hammer tests GB/T 2828.1 Sampling procedures for inspection by attributes - Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection GB/T 3730.1 Motor vehicles and trailers - Types - Terms and definitions GB/T 10125-2012 Corrosion tests in artificial atmospheres - Salt spray tests GB/T 28949 Inlet air cleaning equipment for internal combustion engines and compressors - Performance testing GB/T 28957.1 Road vehicles - Test dust for filter evaluation - Part 1: Silicon The outer surface of the assembly shall be free of obvious defects, such as scars, bumps, roughens, burrs. The coating and plating shall be free of defects, such as cracks, shedding, sagging, bottom exposure. 5 Test method 5.1 Cleanliness of assembly The air cleaner assembly shall be operated in accordance with the provisions of 5.1.1 in QC/T 32-2017. For the whole process of the initial weighing - disassembling - cleaning - re-assembling and restoration - secondary weighing of the assembly, it shall be finished within 30 min, under the specified laboratory environment. 5.2 Original air intake resistance of assembly According to the requirements of 5.1.2 of QC/T 32-2017, the test is carried out at the rated air volume flow. 5.3 Original filtration efficiency of assembly According to the absolute filter method of 5.1.4.1 OR the direct weighing method of 5.1.4.2 in QC/T 32-2017, the test is carried out at the rated air volume flow. 5.4 Pre-filtration efficiency According to requirement of 5.1.5 in QC/T 32-2017, the test is carried out at the rated air volume flow. 5.5 Laboratory life of assembly Carry out the laboratory life test of assembly, according to the requirements of 5.1.6 in QC/T 32-2017. Under the rated air volume flow, when the assembly reaches the test termination condition, that is, the air intake resistance reaches 6 kPa, OR the filtration efficiency of the assembly is that, the original filtration efficiency drops by 0.5%, the test ends. 5.6 Whole-life filtration efficiency of assembly Carry out the test of whole-life filtration efficiency of the assembly, according to the provisions of 5.1.6 in QC/T 32-2017. Under the rated air volume flow, when the assembly reaches the test termination condition, that is, the air intake resistance reaches 6 kPa, OR the filtration efficiency of the assembly is that, the original filtration efficiency drops by 0.5%, the test ends. 5.7 Ash capacity of assembly test of the assembly, in accordance with the requirements of 5.3 in QC/T 32- 2017. For the weather resistance test of the assembly, it may use a new assembly, OR use an assembly, that has been subjected to the air intake resistance/pressure loss test, the original filtration efficiency test, the pre- filtration efficiency test. The actual condition of the assembly shall be indicated in the test report. 5.13 Resistance to low-temperature shock Place the assembly in a low-temperature chamber, at -30 °C ± 2 °C, for 4 hours. Take it out. Quickly install it on the test bench. According to the test Ehc: vertical fall hammer, in Chapter 6 of GB/T 2423.55-2006, select the 500 g steel hammer, to carry out the test, by impacting the surface of the sample, at a height of 400 mm from the sample. 5.14 Resistance to free fall impact The test is carried out in accordance with 5.2 Free fall - method 1 in GB/T 2423.7-2018. For the test severity level, it shall select the fall height and mass, according to the preferred number, which is indicated in boldface in Table 1. 5.15 Corrosion resistance The assembly is tested according to the neutral salt spray (NSS) test procedure, which is specified in GB/T 10125-2012. 5.16 Seals The rubber seal of the assembly shall be tested in accordance with the requirements of HG/T 4785. 6 Inspection rules 6.1 Exit-factory inspection a) Each product can only be exit-factory, after passing the inspection by the quality inspection department AND being accompanied by a product certificate. b) The inspection items shall meet the requirements of 4.17. c) When the ordering organization randomly inspects the products, it shall be carried out in accordance with the provisions of GB 2828.1. The sampling scheme and the acceptance quality limit (AQL) shall be determined, through negotiation, between the supplier and the buyer. 6.2 Type inspection 6.2.1 Type inspection shall be carried out in one of the following situations: a) Identification of type finalization of new products; b) For normally produced products, when the major changes in structure, materials, processes, may affect performance; c) For the products that are normally produced, they shall be inspected once every two years; d) When there is a big difference between the result of the exit-factory inspection and the result of the last type inspection; e) When the national quality supervision agency puts forward a requirement for type inspection. 6.2.2 The items for type inspection are all the items specified in Chapter 4. The test of resistance to vibration fatigue of assembly is an optional test item. 6.2.3 The sampling scheme is determined, through negotiation, between the supplier and the buyer. However, it cannot be less than 3 pieces. 7 Marking, packaging, transportation, storage 7.1 Each product shall have the following markings: a) Factory logo or trademark; b) Product model and implementation standard; c) Instructions for use, which shall be clear and concise; the marking shall be clear; the location and size shall meet the requirements of the product drawing; d) It can be marked according to the requirements of the OEM; the specific content is determined, through negotiation, between the supplier and the buyer. 7.2 Each product shall be cleaned before packaging AND subjected to rust- prevention treatment. Dust prevention measures shall be taken at the entrance and exit. 7.3 The packaged products shall be packed into dry packaging boxes, which are lined with moisture-proof materials. It shall be guaranteed that they will not be damaged, during normal transportation. The outside of the packaging boxes shall have the following signs: ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.