Integrated water chilling (heat pump) package
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: JB/T 12839-2016
JB/T 12839-2016: Integrated water chilling (heat pump) package---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/JBT12839-2016
JB
MACHINERY INDUSTRY STANDARD
ICS 27.200
J 73
File No.. 55146-2016
Integrated water chilling (heat pump) package
Issued on: APRIL 05, 2016
Implemented on: SEPTEMBER 01, 2016
Issued by. Ministry of Industry and Information Technology of the People's
Republic of China
Table of Contents
Foreword... 3
1 Scope... 4
2 Normative references... 4
3 Terms and definitions... 5
4 Type and basic parameters... 6
4.1 Types... 6
4.2 Model... 7
4.3 Basic parameters... 7
Table 1 -- Relevant names and functions of the package... 7
Table 2 -- Temperature/flow conditions at nominal operating conditions... 8
Table 3 -- Nominal operating condition fouling factor... 8
Table 4 -- Temperature conditions for partial load conditions... 9
Table 5 -- Cooling performance coefficient... 10
5 Requirements... 10
5.1 General requirements... 10
5.2 Air tightness, vacuum and leakage requirements... 14
5.3 Operation... 14
5.4 Nominal operating performance... 15
5.5 Partial load performance... 16
5.6 Design and use... 16
Table 6 -- Design conditions of the package... 16
Table 7 -- Variable operating performance temperature conditions... 17
5.7 Noise and vibration... 18
5.8 Safety requirements... 18
5.9 Appearance... 18
6 Test methods... 18
6.1 Instrumentation... 18
6.2 Installation and testing regulations... 19
Table 8 -- Test temperature, flow rate and head deviation of the package... 19
Table 9 -- Temperature deviation during defrosting... 20
6.3 Test methods... 20
7 Inspection rules... 25
7.1 Inspection items... 25
Table 10 -- Inspection items... 25
7.2 Exit-factory inspection... 26
7.3 Type inspection... 26
8 Marking, packaging and storage... 27
8.1 Marking... 27
Table 11 -- Nameplate content... 27
8.2 Accompanying documents... 28
8.3 Packaging and storage... 29
Integrated water chilling (heat pump) package
1 Scope
This Standard specifies the terms and definitions, types and basic parameters,
requirements, test methods, inspection rules, marking, packaging and storage of
integrated water chilling (heat pump) package (hereinafter referred to as the package).
This Standard applies to the integrated water chilling (heat pump) package driven by
electric motors using a vapor compression cooling cycle.
2 Normative references
The following referenced documents are indispensable for the application of this
document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
GB/T 191, Packaging and storage marks
GB/T 3216, Rotodynamic pumps -- Hydraulic performance acceptance tests --
Grades 1 and 2
GB 6388, Transport package shipping mark
GB/T 10870-2014, The methods of performance test for water chilling (heat pump)
packages using the vaper compression cycle
GB/T 13306, Plates
GB/T 13384, General specifications for packing of mechanical and electrical
product
GB/T 18430.1-2007, Water chilling (heat pump) packages using the vapor
compression cycle - Part 1.Water chilling (heat pump) packages for industrial and
commercial and similar application
GB 25131, Safety requirements for water chillers (heat pump) using the vapor
compression cycle
GB/T 29044-2012, Water quality for heating and air conditioning systems
GB 50736, Design code for heating ventilation and air conditioning of civil
buildings
JB/T 4330, Determination of noise emitted by refrigerating and air conditioning
equipment
JB/T 7249, Terminology of cooling equipment
JB/T 9099, Axial flow fans for cooling tower
JB/T 10391, Specification for Y-series (IP44) three-phase asynchronous motor
(Frame size 80~355)
NB/T 47012, Pressure vessels for refrigerant equipment
3 Terms and definitions
For the purposes of this document, the terms and definitions defined in JB/T 7249 and
GB/T 18430.1 as well as the followings apply.
3.1 integrated water chilling (heat pump) package
A central air conditioning or process water chilling (heat pump) package that adopts
vapor compression cooling cycle, integrates cold (hot) water distribution and treatment
system, cold (heat) source system and centralized control system.
3.2 integrated water chilling (heat pump) package with cooling tower
An integrated water chilling (heat pump) package that the cooling tower is used as the
cold source equipment of the package, and the cold source system includes the cooling
tower and the cooling water system.
3.3 integrated water chilling (heat pump) package with evaporative condenser
An integrated water chilling (heat pump) package that the evaporative condenser is used
as the cold source equipment of the package, and the cold source system includes the
evaporative condenser and the spray water system.
3.4 air-cooled integrated water chilling (heat pump) package
An integrated water chilling (heat pump) package using air cooling (air heat source).
3.5 integrated water-source (ground-source) heat pump package
A water (ground) source heat pump package that adopts a vapor compression cooling
cycle, integrating a cold (hot) water distribution and treatment system, a cold (hot)
source water distribution and treatment system, and a centralized control system.
3.6 COP of integrated water chilling (heat pump) package
COPI
Under nominal operating conditions, the ratio of the package's cooling (heating)
capacity to the total power consumption of the integrated package.
3.7 IPLV of integrated water chilling (heat pump) package
IPLVI
The comprehensive part-load performance coefficient is calculated based on the
performance coefficient of the integrated package under part-load conditions. The
performance coefficient of the part-load condition is the ratio of the package's cooling
capacity to the total power consumption of the integrated package.
3.8 total power consumption of integrated water chilling (heat pump) package
Under rated conditions, the difference between the total input electrical power of the
integrated package and the electrical power of the water pump consumed by the
package to provide external head.
3.9 external pump head
The static pressure difference at the inlet and outlet of the package after the package
water system overcomes its own resistance, measured in meters (m).
3.10 total pump head
The sum of the package's water system's own resistance and the external head, in meters
(m).
3.11 water side power output
The mechanical power transferred to the water by the package is measured in kilowatts
(kW).
3.12 effective water flow rate
The water flow rate when the package is running at partial load and the temperature
difference on the user side is not less than 4 K. If the temperature difference is less than
4 K, the corresponding flow rate is converted according to the cooling capacity (heating
capacity) and the 4 K temperature difference.
4 Type and basic parameters
4.1 Types
4.1.1 According to the type of cold (heat) source.
- integrated water chilling (heat pump) package with evaporative condenser;
c) Filters or sludge removers shall be installed as needed on the package's inlet main
pipe or the inlet pipes of the heat exchanger, circulating water pump, and make-
up water pump.
5.1.3 Water replenishment requirements are as follows.
a) The amount of water to be replenished on the heat source side (or heat release side)
of the package shall be calculated and determined based on the sum of the
system's evaporation, drift, blowdown, and leakage losses;
b) For packages without water collecting tanks, water shall be added at the chassis.
For systems with water collecting tanks, water shall be added at the water
collecting tanks;
c) The water replenishment point of the side water system used by the package shall
be set at the suction port of the circulating water pump. When a high-level
expansion water tank is used to set the pressure, water shall be directly
replenished to the system through the expansion water tank. When other constant
pressure methods are used, if the water replenishment pressure is lower than the
water replenishment point pressure, a water replenishment pump shall be installed.
The head of the water replenishment pump shall ensure that the water
replenishment pressure is 30 kPa~50 kPa higher than the working pressure of the
water replenishment point. The total hourly flow rate of the water replenishment
pump shall be 5%~10% of the system water capacity;
d) The design water make-up volume (hourly flow rate) of the package's side water
system shall be calculated based on 1% of the system's water capacity.
5.1.4 The antifreeze requirements for the water system are as follows.
a) In areas where antifreeze is required, the water system shall have antifreeze
measures. When not in operation, the equipment and its outdoor pipes shall be
able to drain;
b) For evaporative cooling packages and cooling tower packages, antifreeze
measures shall be taken on the heat release side during winter cooling operation.
Antifreeze shall be added on the heat source side during heating to ensure that the
heat source side does not freeze;
c) The packages that add antifreeze shall have appropriate antifreeze regeneration
equipment and antifreeze adding devices to ensure that the antifreeze
concentration on the heat source side does not decrease.
5.1.5 Water quality and water treatment requirements are as follows.
a) The circulating water quality on the user side of the package shall comply with
the requirements of Table 2 of GB/T 29044-2012.When the hardness of the make-
up water on the user side is high, the make-up water of the package's hot and cold
water system shall be softened and meet the requirements of Table 2 of GB/T
29044-2012;
b) The evaporative condenser or cooling tower of the package shall include a water-
side dirt collection device and an automatic sewage discharge device;
c) For evaporative cooling packages or cooling tower packages that use antifreeze,
the antifreeze used shall not corrode the contact surfaces of the packages and shall
meet environmental protection requirements;
d) The water treatment on the water source side of the water source heat pump
package shall meet the requirements of GB 50736.
5.1.6 The requirements for parts are as follows.
a) Evaporative condensers and cooling towers shall use flame-retardant materials
and meet fire protection requirements. When installing the filler, the gaps shall be
uniform, the top surface shall be flat, there shall be no collapse or overlapping,
and the filler sheets shall not be perforated or broken;
b) The fan shall comply with the provisions of JB/T 9099.Its main accessories (such
as motors and reducers) shall comply with relevant technical regulations. For fans
with belt drive, both the pulley and the fan shall be subjected to static balance
tests;
c) The motor shall comply with the provisions of JB/T 10391.Outdoor motors shall
be used.
5.1.7 Monitoring and control requirements are as follows.
a) Monitoring and control contents may include parameter detection, parameter and
equipment status display, automatic adjustment and control, automatic conversion
of working conditions, equipment interlocking and automatic protection, etc.;
b) The package shall be able to detect the following parameters.
1) Inlet and outlet water temperature and pressure of hot and cold water;
2) Inlet and outlet water temperature and pressure of cold and hot source;
3) When setting up an intermediate heat exchanger, the inlet and outlet
temperature and pressure of the primary and secondary sides of the heat
exchanger;
4) When setting up the manifold, the temperature and pressure (or pressure
difference) of the manifold;
4) When installed or laid in places with freezing hazards.
b) The requirements for anti-corrosion treatment are as follows.
1) The main materials of evaporative condensers, cooling towers and auxiliary
structures shall be treated with anti-corrosion or made of anti-corrosion
materials, and can pass the 500 h neutral salt spray test (NSS test).
2) The materials of heat exchangers, pipes and their parts and accessories shall be
determined according to the nature, concentration and use environment of the
contact medium, combined with the corrosion resistance of the material, the
importance of the use location and economic factors.
3) In addition to the protective layer of non-ferrous metals, stainless steel pipes,
stainless steel plates, galvanized steel pipes, galvanized steel plates and
aluminum plates, the outer surface of metal equipment and pipes is generally
painted for corrosion protection. The coating type shall be able to withstand
the corrosion of the ambient atmosphere. The primer and topcoat of the coating
shall be used in combination. Pipes with an external insulation layer shall be
primed. The treatment of the outer surface of the pipe before painting shall
meet the corresponding requirements of the coating product.
5.2 Air tightness, vacuum and leakage requirements
5.2.1 When using an electronic halogen leak detector or a helium leak detector, the
single-point leakage rate of the package's cooling system shall not exceed 14/a. The
airtightness of the package shall be fully guaranteed during its application cycle.
5.2.2 During the vacuum test, there shall be no abnormal deformation in any part of the
cooling system. The pressure rise shall not exceed 0.15 Pa.
5.2.3 When the water system on the user side and heat source side (heat release side) is
pressure tested, the system shall be leak-free and the pressure shall not drop.
5.2.4 The water tanks of the drainage system, condensate system, evaporative
condenser and cooling tower shall be leak-free during the water filling test.
5.2.5 For packages assembled on site and packages charged with refrigerant on site, the
cooling system shall be blown clean and subjected to air tightness test, vacuum test and
refrigerant charge leak test.
5.3 Operation
5.3.1 The package shall be subjected to an operation test before leaving the factory. If
the test conditions are not complete or for packages with a rated voltage of 3 V or above,
an operation test may be carried out at the site of use.
5.3.2 When the water system is in operation, the following requirements shall be met.
a) The water system has no water leakage, water overflow during shutdown, and the
water pump has no cavitation;
b) The spray water pump and cooling water pump can self-prime and absorb water.
The height difference between the lowest water level of the cooling tower water
collection tray or water collection tank and the cooling water pump suction port
shall be greater than the resistance of the pipeline, pipe fittings, and equipment;
c) The effective water storage capacity of the chassis or water collection tank of the
evaporative condenser and cooling tower is greater than the amount of water
required to wet the cooling tower fill. Fill the empty pipe space when the package
is shut down, and is greater than the water capacity that flows into the chassis or
water collection tank by gravity when the pump is stopped. After the package is
shut down, there is no overflow.
5.3.3 When the whole machine is running, there shall be no abnormal sound, all parts
shall operate normally, there shall be no friction or collision between pipelines or
between pipelines and parts, and safety protection components shall not be activated to
stop operation.
5.4 Nominal operating performance
5.4.1 When the package is operating under nominal conditions of cooling and heat
pump heating, its maximum deviation shall not exceed the following provisions.
a) The cooling capacity and heating capacity of the heat pump shall not be less than
95% of the nominal value;
b) The total input power of the package shall not be greater than 110% of the nominal
total input power of the package (the total input power of the heat pump heating
does not include the power consumption of auxiliary electric heating);
c) The cooling performance coefficient of the package under nominal working
conditions shall meet the requirements of Table 5 and shall not be less than 92%
of the package's indicated value (when 92% of the package's indicated value is
higher than the value specified in Table 5);
d) The flow rate of the package shall not be less than 95% of the package's nominal
value;
e) The package's external head shall not be less than 95% of the package's nominal
value;
f) The package's water-side output power shall not be less than 92% of the package's
nominal value.
When the package operates according to the maximum load conditions in Table 6, the
motor, electrical components, connecting wires and other parts shall be able to operate
normally.
5.6.3 Low temperature conditions
The package shall be able to operate normally when operating under low temperature
conditions as shown in Table 6.
5.6.4 Heat pump heating conditions
The package shall be able to operate normally when operating under the heating
conditions in Table 6.Safety protection components shall not be activated and stop
operating.
5.6.5 Defrosting conditions
When the package with automatic defrost device is operated according to the defrosting
conditions in Table 6, it shall meet the following requirements.
a) The safety protection components shall not be activated and the operation shall
stop;
b) Defrosting shall be performed automatically;
c) The melted water during defrosting and the condensed water of the heat exchanger
on the heat source side during heating operation can be discharged or processed
normally;
d) In the continuous operation after the initial defrosting, the total time required for
defrosting shall not exceed 20% of the operation cycle time. For packages with
more than two independent cooling cycles, the total defrosting time of each
independent cycle shall not exceed 20% of the total operation time of each
independent cycle.
5.6.6 Variable operating conditions performance
The package’s variable operating performance temperature conditions are shown in
Table 7.
Table 7 -- Variable operating performance temperature conditions
Celsius
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of JB/T 12839-2016 be delivered?Answer: The full copy PDF of English version of JB/T 12839-2016 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of JB/T 12839-2016_English with my colleagues?Answer: Yes. The purchased PDF of JB/T 12839-2016_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- JB/T 12839-2016 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of JB/T 12839-2016?A step-by-step guide to download PDF of JB/T 12839-2016_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "JB/T 12839-2016". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|