HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 30805-2024 (GB/T 30805-2014) PDF English

US$90.00 · In stock · Download in 9 seconds
GB/T 30805-2014: Thermal insulating products for building applications -- Determination of short term water absorption by partial immersion
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 30805: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB/T 30805-2024English274 Add to Cart 3 days Thermal insulating products for building applications - Determination of short-term water absorption by partial immersion Valid
GB/T 30805-2014English90 Add to Cart 0-9 seconds. Auto-delivery Thermal insulating products for building applications -- Determination of short term water absorption by partial immersion Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB/T 30805-2014
      

Similar standards

GB/T 30806   GB/T 30803   GB/T 30802   GB/T 30807   

GB/T 30805-2014: Thermal insulating products for building applications -- Determination of short term water absorption by partial immersion


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT30805-2014
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 91.120.10 Q 25 GB/T 30805-2014 / ISO 29767.2008 Thermal insulating products for building applications - Determination of short term water absorption by partial immersion (ISO 29767.2008, IDT) Issued on: JUNE 24, 2014 Implemented on: FEBRUARY 1, 2015 Issued by. General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration Committee.

Table of Contents

Foreword... 3 1 Scope... 4 2 Normative references... 4 3 Principle... 4 4 Apparatus... 4 5 Test specimens... 6 6 Procedure... 6 7 Calculation and expression of results... 8 8 Accuracy of measurement... 8 9 Test report... 9

Foreword

This Standard was drafted in accordance with the rules given in GB/T 1.1-2009. This Standard, using translation method, identically adopts ISO 29767.2008 Thermal insulating products for building applications - Determination of short term water absorption by partial immersion. This Standard was proposed by China Building Materials Federation. This Standard shall be under the jurisdiction of National Technical Committee on Insulation Material of Standardization Administration of China (SAC/TC 191). The drafting organizations of this Standard. Nanjing Glass Fiber Research & Design Institute Co., Ltd., National Glass Fiber Products Quality Supervision and Inspection Center. Main drafters of this Standard. Cui Jun, Chen Lihua, Jiang Pengfei, Yang Chao. Thermal insulating products for building applications - Determination of short term water absorption by partial immersion

1 Scope

This Standard specifies the equipment and procedures for determining the short-term water absorption of specimens by partial immersion. This Standard is applicable to thermal insulating products. NOTE The procedure specified by this Standard is intended to simulate the water absorption caused by a 24 h raining period during construction work.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. ISO 29768 Thermal insulating products for building applications - Determination of linear dimensions of test specimens ISO 5725-2 Accuracy (trueness and precision) of measurement methods and results - Part 2.Basic method for the determination of repeatability and reproducibility of a standard measurement method

3 Principle

A specimen is placed with its lower part in water for a period of 24 h and the change in its mass is measured. The excess water adhering to the surface but not absorbed by the specimen is removed by drainage (method A) or taken into account by deduction of the initial water uptake (method B).

4 Apparatus

4.1 Balance, capable of determining the mass of a specimen to an accuracy 6) date of testing, 7) general information relating to the test including a reference to the method used (A or B) and, if relevant, the initial water uptake, 8) any events that can have affected the results; d) results. all individual values and the mean value. NOTE It is expected that information about the apparatus and identity of the person responsible for the test be available in the laboratory, but it is not necessary that it be recorded in the report. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.