HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189760 (30 Nov 2024)

GB/T 16918-2017 PDF in English


GB/T 16918-2017 (GB/T16918-2017, GBT 16918-2017, GBT16918-2017)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 16918-2017English255 Add to Cart 0-9 seconds. Auto-delivery. Bursting disc safety devices for gas cylinders Valid
GB 16918-1997English519 Add to Cart 3 days [GB/T 16918-1997] Bursting discs specification for gas cylinder [including MODIFICATION 1] Obsolete
Standards related to (historical): GB/T 16918-2017
PDF Preview

GB/T 16918-2017: PDF in English (GBT 16918-2017)

GB/T 16918-2017 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 23.020.30 J 74 Replacing GB/T 16918-1997 Bursting Disc Safety Devices for Gas Cylinders ISSUED ON: OCTOBER 14, 2017 IMPLEMENTED ON: MAY 1, 2018 Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China; Standardization Administration of the People’s Republic of China. Table of Contents Foreword ... 3 1 Scope ... 4 2 Normative References ... 4 3 Terms and Definitions ... 4 4 Materials ... 6 5 Design ... 7 6 Manufacturing Requirements and Test Methods ... 9 7 Inspection Rules ... 14 8 Marking and Identification ... 15 9 Packaging, Transportation and Storage ... 16 10 Exit-factory Documents ... 16 11 Requirements for Use ... 17 Appendix A (informative) Structure, Installation, Use and Maintenance of Bursting Disc Safety Devices for Commonly Seen Gas Cylinders ... 18 Appendix B (normative) Fatigue Test of Bursting Discs for Gas Cylinders ... 21 Bursting Disc Safety Devices for Gas Cylinders 1 Scope This Standard specifies the terms and definitions, materials, design, manufacturing requirements, and test methods, inspection rules, marking, identification, packaging, transportation and storage, exit-factory documents and usage requirements for bursting disc safety devices for gas cylinders. This Standard is applicable to bursting disc safety devices for gas cylinders of various structures, filled with compressed gases, high (low) pressure liquefied gases, low-temperature liquefied gases, adsorbed gases and liquids with a standard boiling point equal to or lower than 60 C, and mixed gases (two or more gases). 2 Normative References The following documents are indispensable to the application of this document. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB/T 567.1 Bursting Disc Safety Devices - Part 1: Basic Requirement GB/T 567.4 Bursting Disc Safety Devices - Part 4: Type Test GB/T 8335 Special Threads for Gas Cylinders GB/T 17268 Non-refillable Steel Welded Cylinders for Industrial Use 3 Terms and Definitions The following terms and definitions are applicable to this document. 3.1 bursting disc safety device A non-reclosing pressure relief device composed of a bursting disc (or bursting disc assembly) and a holder (or support ring). At the set bursting temperature, when the pressure difference on both sides of the bursting disc reaches a pre-determined value, the bursting disc will immediately act (rupture or fall off) and release the fluid medium. 3.2 bursting disc In the bursting disc safety device, a pressure-sensitive component that quickly acts due to overpressure. During the bursting test of the bursting disc, the actual bursting pressure value at the moment of bursting. 3.13 bursting temperature When the bursting disc reaches the bursting pressure, the temperature of the diaphragm wall of the bursting disc. 3.14 performance tolerance The maximum allowable deviation of the actual test bursting pressure of the bursting disc relative to the specified bursting pressure, that is, the ratio of the difference between the test bursting pressure and the specified bursting pressure to the specified bursting pressure. 3.15 batch A group of bursting discs with the same category, type, specifications, specified bursting pressure and specified bursting temperature, and with identical materials (designation, batch No. and specifications) and manufacturing process is considered as one batch. 3.16 cylinder test pressure The hydraulic test pressure of gas cylinders. For gas cylinders undergoing air pressure test, it refers to the pressure of air pressure test. 4 Materials 4.1 The materials used for the bursting discs shall have good corrosion resistance, uniform and stable mechanical properties and thermal stability. 4.2 The maximum and minimum allowable operating temperatures of metals, non-metals and coating (plating) materials used on the bursting discs shall comply with the stipulations of GB/T 567.1. 4.3 The materials used for components, such as: bursting discs, bursting disc holder rings and screw plugs shall comply with the stipulations of corresponding national standards or industry standards, and shall have quality certification documents (including quality certificates and certificates of conformity) provided by the material manufacturing organization. 4.4 The materials used for bursting discs shall be re-inspected in accordance with the stipulations of the corresponding material standards and design drawings, and can only be used after reaching the requirements. 4.5 When the medium is corrosive to the materials of the bursting disc safety device, anti- corrosion treatment measures, such as: corrosion-resistant protective film or coating (plating) layer shall be adopted. The anti-corrosion treatment shall satisfy the following requirements: a) When using an anti-corrosion protective film, it shall be ensured that the protective film is airtight and provided in a set or as a whole with the bursting disc safety device; b) The anti-corrosion measures shall be completed in the bursting disc safety device manufacturing organization, and the measures cannot affect the design performance indicators of the bursting disc safety device; c) The anti-corrosion treatment shall be carried out before the performance inspection of the bursting disc safety device. 5 Design 5.1 Specified Bursting Temperature and Specified Bursting Pressure 5.1.1 The specified bursting temperature of the bursting discs shall be the upper limit of the ambient service temperature specified in the corresponding gas cylinder standards. 5.1.2 The specified bursting pressure of the bursting discs shall be determined in accordance with the cylinder test pressure. For bursting discs used for refillable gas cylinders, it shall generally not be greater than the cylinder test pressure; for bursting discs used for non-refillable gas cylinders, it shall comply with the corresponding stipulations of GB/T 17268. 5.2 Performance Tolerance The performance tolerance shall satisfy the stipulations of the corresponding gas cylinder standards. If it is not specified in the gas cylinder standards, for bursting discs used for refillable gas cylinders, the performance tolerance is 5%, and the lower limit of the specified bursting pressure shall not be less than 1.05 times the temperature rise pressure of the gas cylinders; for bursting discs used for non-refillable gas cylinders, the performance tolerance is 10%. 5.3 Clamping Elements 5.3.1 General requirements The clamping elements shall be designed, manufactured and used in conjunction with the bursting discs. When replacement is required, the bursting discs and clamping elements of the original manufacturing organization shall be replaced as a set. 5.3.2 Design The design of the clamping elements may adopt the following methods: a) Design methods established through experience in similar projects; b) Carry out pressure-bearing capacity test verification, and a pressure test at 1.5 times the cylinder test pressure. 6 Manufacturing Requirements and Test Methods 6.1 Material Verification From the same batch of materials, cut out at least three raw discs for test, process them into ordinary conventional domed bursting discs, and conduct the bursting test. The performance tolerance shall not exceed 2%. 6.2 Batch Size The bursting discs shall be produced in batches, with the quantity of each batch not exceeding 3,000 PCS. 6.3 Assembly 6.3.1 All components shall be assembled in batches after passing the inspection. 6.3.2 For replaceable components, trial installation shall be carried out in accordance with the requirements of the drawings, and spare parts shall be used in conjunction with the corresponding batch of products. 6.3.3 The assembly of bursting disc safety devices (provided in sets) with non-replaceable components shall satisfy the following requirements: a) The various components (bursting disc, bursting disc holder ring and screw plug, etc.) shall be connected by welding, riveting, threading and cementing, etc.; b) The connection materials, such as: welding materials and adhesives, etc., shall be compatible with the materials of the connecting parts, and shall satisfy the usage requirements; c) The connection shall have reliable sealing performance and pressure-bearing capacity; d) When the method of welding is used for connecting, the welding process shall be completed by welding personnel with corresponding qualifications; the welding process qualification of pressure-bearing welds shall be carried out in accordance with the requirements of corresponding standards; e) They shall be assembled into a whole, and be allowed to exit the factory after passing the inspections and tests. 6.4 Test Methods 6.4.1 Appearance inspection The requirements for appearance inspection are as follows: a) Visually inspect or use a 3x to 5x magnifying glass to inspect the inner and outer safety protection devices shall be installed; b) When measuring the bursting pressure, the test bursting temperature shall also be measured at the same time; c) During the sampling bursting test of reverse domed bursting disc, the pressure- bearing side of the bursting disc shall have sufficient gas phase space volume, so as to ensure that the bursting disc flips over and ruptures. 6.4.2.6 Pressure measuring instrument The installation position, quantity, accuracy and measuring range of the pressure measuring instruments in the test system shall satisfy the following requirements: a) The test system shall be equipped with at least three pressure measuring instruments, two of which are used to measure the bursting pressure and shall be set as close to the test bursting disc as possible; the other is used to indicate the pressure of the test system and shall be set in a visible part of the pressure source outlet; b) The accuracy of the bursting pressure measuring instruments shall not be lower than Level 1.0; c) The measuring range of the measuring instruments shall be 1.5 ~ 3.0 times the specified bursting pressure; d) The measuring instruments shall be within the calibration cycle, which shall not exceed 6 months. 6.4.2.7 Bursting test temperature The requirements for the bursting test temperature are as follows: a) The temperature measuring instrument shall be within the calibration period, which shall not exceed 6 months; b) The resolution of the temperature measuring instrument shall not be lower than 1.0 C; c) When measuring temperature, the temperature of the measuring point shall be able to reflect the wall temperature of the bursting disc; d) When performing bursting tests at high (low) temperatures, the temperature rise (fall) rate shall be slow. After reaching the specified bursting temperature, the temperature shall be kept for at least 10 minutes, so as to make the wall temperature of the bursting disc uniform. The temperature deviation of the test medium shall be controlled within the range of  10 C; e) The bursting test shall be carried out at the specified bursting temperature. 6.4.2.8 Pressure increase rate for bursting test During the bursting test, the inlet pressure of the test device shall be raised to 90% of the minimum bursting pressure. The pressure increase rate should be such that the minimum indication value of the pressure gauge can be accurately read; the pressure holding time shall be no less than 5 seconds. Afterwards, steadily and continuously increase the pressure. When increasing the pressure, the minimum indication value of the pressure gauge shall be accurately read, and the pressure increase rate per second shall not be less than 0.1% of the bursting pressure, until the bursting disc bursts. This process shall not exceed 2 minutes. 6.4.2.9 Determination of test conclusions When the measured bursting pressure values of the sampling bursting test of the same batch of bursting discs all satisfy the requirements for the performance tolerance, the bursting test result of this batch of bursting discs shall be determined as qualified. Otherwise, it shall be determined as disqualified. 6.4.2.10 Bursting test report The bursting test report shall at least include the following contents: a) Test date, bursting disc model, production batch No. and batch size, etc.; b) Information of the test bursting disc device: including the basic structure of the bursting disc, relief diameter of the bursting disc holder ring, material of the bursting disc, the specified bursting pressure, specified bursting temperature and performance tolerance, etc.; c) Test conditions and test methods: including the quantity of sampled bursting discs, test medium, medium temperature and ambient temperature, test device and equipment, test instruments, etc., as well as test method and process; d) Test results: including test bursting pressure, test bursting temperature, bursting pressure deviation and test conclusions, etc.; e) Signature of tester and auditor. 6.4.3 Sealing performance test All bursting disc safety devices provided in complete sets must undergo sealing performance test before exiting the factory. The test medium for the sealing performance test is air or nitrogen, and the test pressure is the nominal working pressure of the gas cylinder. During the test, increase the pressure of the bursting disc safety device to the test pressure and immerse it in the test water tank. The pressure holding time is at least 3 minutes. If there is no leakage, it shall be determined as qualified. 6.4.4 Discharge test c) Name or code of the manufacturing organization. 9 Packaging, Transportation and Storage 9.1 Packaging 9.1.1 The bursting disc safety device and its accessories shall be properly packed. 9.1.2 Bursting disc products shall be equipped with special-purpose packaging boxes (cases), which can be packed individually or in bulk. 9.1.3 When packaging, the packaging box (case) and bursting disc shall be dry and clean, and the bursting disc shall be prevented from moving and causing any damage that affects the bursting performance. 9.1.4 The outer surface of each packaging box (case) shall at least be marked with the following contents: a) Batch No.; b) Nominal diameter of the discharge outlet, expressed in (mm); c) Manufacturing organization’s name or code. 9.2 Transportation and Storage 9.2.1 Bursting disc products shall be packaged and pass the inspection before being transported. During transportation and handling, collision, impact, moisture and contamination shall be avoided. 9.2.2 Bursting disc products shall be stored in the original packaging box (case), with the front side facing up, and kept dry, so as to prevent environmental corrosion. The storage room shall be kept clean and ventilated. 10 Exit-factory Documents 10.1 The manufacturing organization shall provide the using organization with complete instructions and quality certification documents regarding the assembly, installation, use and maintenance of the bursting disc safety device. 10.2 Each batch of bursting disc products shall have at least the following documents: a) Product quality certificate; b) Product certificate of conformity; c) Product installation and operation instructions. 10.3 The product quality certificate shall at least include the following contents: a) Name and batch No.; b) Product model or type code; c) Manufacturing (batch) quantity; d) Nominal diameter of the discharge outlet; e) Material designation; f) Applicable medium and temperature; g) Specified bursting pressure; h) Performance tolerance; i) Specified bursting temperature; j) Manufacturing standard No.; k) Qualification mark and signature of the inspector; l) Manufacturing organization’s name or code, with the organization’s official seal or special inspection seal; m) Special equipment manufacturing license No. and license level; n) Date of manufacture. 10.4 The certificate of conformity of bursting disc products shall at least contain the product name, batch No., product model or type code, manufacturing organization’s name or code, manufacturing standard, special equipment manufacturing license No. and license level, etc. The content of the certificate of conformity of bursting disc products shall be consistent with the content of the quality certificate of this batch of bursting discs. 11 Requirements for Use See Appendix A for the requirements for the use of the bursting disc safety devices. Appendix B (normative) Fatigue Test of Bursting Discs for Gas Cylinders B.1 Test Device B.1.1 The test device shall have the function of adjusting and controlling circulating pressure, circulating frequency, pressure holding time and continuous pressure circulation. B.1.2 The test device shall be able to automatically record the number of pressure circulations, indicate and control the temperature of the test medium, and output the pressure circulation curve. B.1.3 When the test medium is liquid, the air in the test system shall be able to be completely discharged. B.1.4 The pressure-bearing pipelines and their accessories shall pass the pressure test. The pressure of the pressure test shall not be lower than 2.0 times the maximum allowable working pressure of the test device. The pressure holding time of the pressure test shall not be less than 3 minutes. B.1.5 At least two pressure measuring instruments that can simultaneously and correctly display the circulating pressure shall be installed on the test device. The accuracy level of the pressure measuring instruments shall not be lower than Level 1.0, and the measuring range shall be 2.0 ~ 3.0 times the circulating pressure of the bursting discs under test. The pressure measuring instruments shall be within the calibration cycle, which shall not exceed 6 months. B.2 Test Method B.2.1 Circulating pressure B.2.1.1 The upper limit of the circulating pressure of the fatigue test can be 80% of the specified bursting pressure of the bursting discs under test. B.2.1.2 The lower limit of the circulating pressure shall not exceed 10% of the upper limit of the circulating pressure. B.2.2 Pressure circulating frequency The pressure circulating frequency is 3 times/min ~ 8 times/min. Throughout the fatigue test process, the pressure increase - pressure holding - pressure decrease time curve shall remain basically the same, and the holding time of the upper limit of the circulating pressure shall not be less than one-third of the time of one pressure circulation. B.2.3 Test temperature ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.