|
Std ID |
Description (Standard Title) |
|
SY/T 6904-2012
|
The calibration method of production well logging surface system
|
|
SY/T 0530-2011
|
Determination of oil content in oilfield produced water. Spectrophotometry method
|
|
SY/T 5338-2011
|
Practice for sand control technology of strength and artificial borehole well
|
|
SY/T 5404-2011
|
Expansion packer
|
|
SY/T 5732-2011
|
Oil pump on-off connector
|
|
SY/T 5835-2011
|
Wellhead ball valve for fracturing
|
|
SY/T 5846-2011
|
Recommended practice for casing patch process
|
|
SY/T 5848-2011
|
Resistance to screw collar
|
|
SY/T 5872-2011
|
Inspection and repair regulations of sucker rod pumps
|
|
SY/T 5875-2011
|
Test method of oil well liquid level
|
|
SY/T 5924-2011
|
The operation method for water shut off producer. Water shut off operation by the mechanic method for open hole
|
|
SY/T 5757-2010
|
General specifications of bactericides for oilfield injecting water
|
|
SY/T 5889-2010
|
Oxygen scavenger performance evaluation method
|
|
SY/T 6124-2010
|
Practice for water drainage and gas production by gas lift technology
|
|
SY/T 6257-2010
|
Injection and production technology project design for steam huff and puff
|
|
SY/T 6378-2010
|
Technology method for fishing and tieback casing of oil and injection well
|
|
SY/T 6464-2010
|
Technical requirements for horizontal well completion technology
|
|
SY/T 0600-2009
|
Prediction of scaling tendency in oil-field water
|
|
SY/T 0601-2009
|
Determination of emulsified oil and soluble oil in water
|
|
SY/T 5733-2009
|
Procedures of stratified flow rate testing and adjusting on injection wells with eccentric water tube
|
|
SY/T 5746-2009
|
The establishment and application methods of dynamic control chart for electric submersible pump well
|
|
SY/T 5832-2009
|
The sucker rod string centralizer
|
|
SY/T 6121-2009
|
Recommended methods of packer releasing and fishing
|
|
SY/T 6130-2009
|
The parameter test and injection profile explanation method for steam injection well
|
|
SY/T 6300-2009
|
Specifications of paraffin removers and paraffin inhibitors applied in oil production
|
|
SY/T 6302-2009
|
Recommended practices for evaluating short term proppant pack conductivity
|
|
SY/T 5182-2008
|
Wire-wrapped stainless steel screen pipe
|
|
SY/T 5185-2008
|
Evaluation methods of water-based carrying fluid for gravel packing sand control
|
|
SY/T 5289-2008
|
Fracturing design, treatment and post-fracturing effect evaluation methods of oil, gas and injection wells
|
|
SY/T 5337-2008
|
Gravel packing tool
|
|
SY/T 5625-2008
|
Hydrostatic packer
|
|
SY/T 5626-2008
|
Sliding sleeve sand jet
|
|
SY/T 5627-2008
|
Steel ball deliver
|
|
SY/T 5628-2008
|
Hydraulic anchor
|
|
SY/T 5745-2008
|
Major terms of oil and gas production engineering
|
|
SY/T 5862-2008
|
Technical criterions of polymer for oil displacement
|
|
SY/T 6376-2008
|
General technical specifications of fracturing fluids
|
|
SY/T 6377-2008
|
The regulation of fish impression
|
|
SY/T 6380-2008
|
Test methods of breaker properties for fracturing
|
|
SY/T 6690-2008
|
Specification for well control technology of downhole operation
|
|
SY/T 5275.2-2007
|
The water segregator for water injection in oil field. Air-core movable water segregator
|
|
SY/T 5352-2007
|
Releasing drillable packers, bridge plugs and setting tools
|
|
SY/T 5580-2007
|
Technical managing rules of the demulsifier for crude oil and the treatment chemicals for produced water in oilfield
|
|
SY/T 5587.9-2007
|
Codes for conventional workover job. Part 9: Procedure of wellhead for replacing operating
|
|
SY/T 5764-2007
|
General technical specifications of natural plant gum for fracturing
|
|
SY/T 5791-2007
|
The operating procedures for lifting and laying down of hydraulic workover rigmast
|
|
SY/T 5825-2007
|
Procedures of temperature test by a electronic down-hole thermometer
|
|
SY/T 5834-2007
|
Performance specifications and measuring methods of low-solid killing fluid
|
|
SY/T 6084-2007
|
Using and maintaining for ground drive progressing cavity pumps
|
|
SY/T 6694-2007
|
Lifting technology designs for hydraulic piston pumps and jet pumps
|
|
SY/T 5108-2006
|
Specification and recommended testing practice for proppants used in hydraulic fracturing operations
|
|
SY/T 5184-2006
|
Recommended practices for testing sand used in gravel packing operations
|
|
SY/T 6125-2006
|
Technology procedures for gas well testing, gas producing and performance monitoring
|
|
SY/T 6127-2006
|
Specification of data collection items for downhole operation in oil, gas, water wells
|
|
SY/T 6264-2006
|
Specifications of major repair project design for oil, gas, water well
|
|
SY/T 6644-2006
|
Recommended practice for design of continuous flow gas lift installations using injection pressure operated valves
|
|
SY/T 6645-2006
|
Regulations drafted for the injection and production well of perforated completion design of the underground gas storage about the depleted sandstone reservoir
|
|
SY/T 6646-2006
|
Well abandonment and inactive well practices
|
|
SY/T 5107-2005
|
Recommended practices on measuring the properties of water-based fracturing fluid
|
|
SY/T 5372-2005
|
Regulation for workover job and method of quality evaluation for zonal injection of injector
|
|
SY/T 5827-2005
|
Process of releasing and fishing
|
|
SY/T 5873-2005
|
Recommended practice for design and execution of sucker rod pumping system
|
|
SY/T 5952-2005
|
Legend of downhole process strings and tools for hydrocarbon production well and water injection well
|
|
SY/T 6484-2005
|
Recommended practice for operations, maintenance, and trouble-shooting of gas lift installations
|
|
SY/T 6640-2005
|
The calibration methodology of the down hole electronic pressure gauge
|
|
SY/T 5587.12-2004
|
Codes for conventional workover job. Part 12: Fishing
|
|
SY/T 5587.4-2004
|
Codes for conventional workover job. Part 4: Finding and sealing of casing leak for cased wells
|
|
SY/T 5587.5-2004
|
Codes for conventional workover job. Part 5: Preparation of well bore for downhole operation
|
|
SY/T 5590-2004
|
Evaluation method for profile control agents properties
|
|
SY/T 5904-2004
|
Recommended practice for sizing and selection of electric submersible pump installation
|
|
SY/T 6596-2004
|
Recommended practice for produced-water reinjection in gas field
|
|
SY/T 5792-2003
|
Technical demands on whisper operation and well completion
|
|
SY/T 5810-2003
|
Design and downhole operation of continuous gas lift
|
|
SY/T 5874-2003
|
Evaluation method on oil well water plugging
|
|
SY/T 5906-2003
|
The method for plotting chart on pressure-loss curve through choke of water injection well
|
|
SY/T 6565-2003
|
Technique requirements for CO2 injection in petroleum or water well safety
|
|
SY/T 6566-2003
|
Hydraulic fracturing safety technique specification
|
|
SY/T 6570-2003
|
Regulations drafted for the lift technology design of oil-wells
|
|
SY/T 6571-2003
|
Evaluation methods for performance of ferric ion stabilizing agents in acidizing
|
|
SY/T 6572-2003
|
Evaluation methods of resin performance for sand control
|
|
SY/T 5252-2002
|
Natural gamma spectrographic method of analysing for core sample
|
|
SY/T 5341-2002
|
Sesbania gum for fracturing
|
|
SY/T 5790-2002
|
Process of casing reformation and strengthening seal
|
|
SY/T 5849-2002
|
The method for economic effect evaluation of removing plugging by chemicals in production and injection well
|
|
SY/T 6528-2002
|
Test method of the rock dielectric constant
|
|
SY/T 5181-2000
|
Recommended practice for gravel pack of sand control of the naked hole
|
|
SY/T 5183-2000
|
Evaluation method for sand control effect of oil well
|
|
SY/T 5273-2000
|
Evaluation method for behaviour of corrosion inhibitor for produced water of oilfield
|
|
SY/T 5274-2000
|
Resin-coated sand
|
|
SY/T 5289-2000
|
Evaluating method for hydraulic fracturing effect of oil well
|
|
SY/T 5338-2000
|
Recommended practice for sand consolidation of strengthen borehole wall
|
|
SY/T 5339-2000
|
Recommended practic e for sand control technology of artificial borehole wall
|
|
SY/T 5340-2000
|
Gravel paching method for sand control in cased hole
|
|
SY/T 5465-2000
|
Operating procedure for production profile logging in production well
|
|
SY/T 6446-2000
|
Specification for making quality control targets for testing shaped chargs of well
|
|
SY/T 6484-2000
|
Recommended practice for operation, maintenance, and trouble-shooting of gas lift installations
|
|
SY/T 6485-2000
|
Specification for oil production engineering project in polymer flooding
|
|
SY/T 6486-2000
|
Recommended opertional method for preventing of clay-swelling and fine-migration in acidizing of water injection well
|
|
SY/T 6487-2000
|
Recommended practices for liquid CO2 huff and puff
|
|
SY/T 6510-2000
|
Technical requirement for steam injection development project design of heavy oil reservoir
|