| CART (Up to 12 items/PDFs). How to add more items? Search 'GB/T 1.1' --> Add to Cart |
| Delete | 1 | DL/T 734-2017_ENGLISH | Technical guide of welding repair for boiler drum for fossil-fired power plant | 1 | 4 | 399 | | Need to translate |
| Delete | 2 | DL/T 1773-2017_ENGLISH | (Technical Guidelines for Power System Voltage and Reactive Power) | 1 | 3 | 299 | | Need to translate |
| Delete | 3 | DL/T 636-2017_ENGLISH | Conductor car for live working | 1 | 3 | 209 | | Need to translate |
| Delete | 4 | DL/T 1778-2017_ENGLISH | (Flexible DC protection and control equipment technical conditions) | 1 | 6 | 579 | | Need to translate |
| Delete | 5 | DL/T 1177-2012_ENGLISH | Guide for technology supervision of 1000kV AC transmission and transformation equipment | 1 | 3 | 239 | | Need to translate |
| Delete | 6 | DL/T 1178-2012_ENGLISH | Corona and RIV test methods for fittings of 1000kV AC transmission line | 1 | 3 | 559 | | Need to translate |
| Delete | 7 | SL 99-2012_ENGLISH | Regulation for river model test | 1 | 7 | 1179 | | Need to translate |
| Delete | 8 | DL/T 1764-2017_ENGLISH | (Technical Guidelines for Assessing the Value of Ordered Utilization of Electricity Users) | 1 | 4 | 449 | | Need to translate |
| Delete | 9 | DL/T 1770-2017_ENGLISH | Code of water conveyance system filling and drainage for pumped storage power station | 1 | 3 | 349 | | Need to translate |
| Delete | 10 | JT/T 321-1997_ENGLISH | Established requirement of the lighthouse and its facilities | 1 | 3 | 399 | | Need to translate |
| Delete | 11 | JG/T 470-2015_ENGLISH | Magnesite core board for fire resistant doorset | 1 | 3 | 209 | | Need to translate |
| More PDF Samples Total (USD) | 4869.00 |