| CART (Up to 12 items/PDFs). How to add more items? Search 'GB/T 1.1' --> Add to Cart |
| Delete | 1 | DL/T 825-2002_ENGLISH | Installation and wiring connection rules for electric energy metering device | 1 | 3 | 679 | | Need to translate |
| Delete | 2 | DL/T 836.1-2016_ENGLISH | Reliability evaluation code in power supply system. Part 1: General rule | 1 | 4 | 439 | | Need to translate |
| Delete | 3 | DL/T 810-2002_ENGLISH | Technical specification for 500kV D. C. long rod composite insulators | 1 | 6 | 959 | | Need to translate |
| Delete | 4 | DL/T 828-2002_ENGLISH | Technical reqirements for stocking single phase alternating current long life induction watt-hour meter | 1 | 4 | 709 | | Need to translate |
| Delete | 5 | DL/T 842-2003_ENGLISH | Ordering specification for low-voltage shunt capacitor installation | 1 | 5 | 639 | | Need to translate |
| Delete | 6 | DL/T 822-2002_ENGLISH | Code of test and acceptance of monitoring and control system for hydropower plants | 1 | 6 | 879 | | Need to translate |
| Delete | 7 | DL/T 841-2003_ENGLISH | Specification of damper current limiter for high voltage shunt capacitor for order | 1 | 3 | 419 | | Need to translate |
| Delete | 8 | DL/T 818-2002_ENGLISH | Technical guide for carbide phase analysis of low alloy heat resistant steels | 1 | 4 | 679 | | Need to translate |
| Delete | 9 | DL/T 839-2003_ENGLISH | Performance test in site for the large boiler feedwater pump (ISO 5198: 1987(E) Centrifugal, mixed flow and axial pumps. Code for hydraulic performance tests, NEQ) | 1 | 6 | 1149 | | Need to translate |
| Delete | 10 | DL/T 834-2003_ENGLISH | Guide for prevention of water and cool steam damage to steam turbines in fossil power plant | 1 | 4 | 919 | | Need to translate |
| More PDF Samples Total (USD) | 7470.00 |