GB/T 36573-2018 English PDFUS$279.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36573-2018: Technical specification for measurement and verification of electric energy and power savings for voltage step-up operation of power line project Status: Valid
Basic dataStandard ID: GB/T 36573-2018 (GB/T36573-2018)Description (Translated English): Technical specification for measurement and verification of electric energy and power savings for voltage step-up operation of power line project Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F20 Classification of International Standard: 29.240.01 Word Count Estimation: 14,126 Date of Issue: 2018-09-17 Date of Implementation: 2019-04-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 36573-2018: Technical specification for measurement and verification of electric energy and power savings for voltage step-up operation of power line project---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Technical specification for measurement and verification of electric energy and power savings for voltage step-up operation of power line project ICS 29.240.01 F20 National Standards of People's Republic of China Power line boost operation saves power Measurement and verification specifications Published on.2018-09-17 Implementation of.2019-04-01 State market supervision and administration China National Standardization Administration issued ContentForeword I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Main contents of measurement and verification 2 5 Technical requirements for measurement and verification 2 6 Uncertainty analysis and assessment 4 Appendix A (Normative Appendix) Calculation of Power Savings for Power Line Boost Operation 6 Appendix B (normative appendix) Measurement of load loss during line reporting period 11ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This standard is proposed and managed by the China Electricity Council. This standard was drafted. China Electric Power Research Institute, State Grid Jiangsu Energy Conservation Services Co., Ltd., China Southern Power Grid Integrated Energy Co., Ltd. State Grid Zhejiang Electric Power Company, State Grid Zhejiang Zhedian Energy Saving Service Co., Ltd., State Grid Henan Energy Saving Service Co., Ltd., State Grid (Beijing) Energy Saving Design and Research Institute Co., Ltd., State Grid Gansu Electric Power Company Electric Power Research Institute, State Grid Xinjiang Electric Power Company Electric Power Research Institute, State Grid Jiangxi Energy Saving Service Co., Ltd., State Grid Shanxi Electric Power Company Maintenance Branch. The main drafters of this standard. Meng Hao, Zhong Ming, Jiang Limin, Yan Jian, Yan Huaguang, Zhou Qiang, Peng Longsheng, Qin Junning, Feng Hua, Shi Lingling, Liu Hao, Li Yan, Wang Weizhou, Feng Run, Tang Kejian, Gao Jinwen. Power line boost operation saves power Measurement and verification specifications1 ScopeThis standard stipulates the measurement and verification of the power saved by the power line due to the increase of the operating voltage. The law includes the main content of measurement and verification, test plans and technical requirements, calculation of power saving and uncertainty analysis. This standard is applicable to the certification of AC power line boosting operation to save power, and is also applicable to energy saving before the implementation of line boosting project. Evaluation.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 16664-1996 Energy-saving monitoring method for enterprise power supply and distribution system GB/T 28750-2012 General rules for energy measurement and verification DL/T 448-2000 Technical Regulations for Energy Metering Devices DL/T 686-1999 Power grid energy loss calculation guidelines JJF1059.1-2012 Measurement uncertainty evaluation and representation EVO10000-1.2014 core concept of international energy efficiency measurement and verification procedures (Internationalperformancemeas- urementandverificationprotocol-Coreconcepts) EVO10100-1..2014 International Energy Efficiency Measurement and Verification Protocol Statistics and Uncertainty (Internationalper- formancemeasurementandverificationprotocol-StatisticsanduncertaintyforIPMVP)3 Terms and definitionsThe following terms and definitions as defined in GB/T 28750-2012 apply to this document. 3.1 Power line boost operation voltagestep-upoperationofpowerline After the power line is implemented, the power line is allowed to operate at a higher voltage level due to changes in physical facilities to improve the line. Technical means for conveying capacity and reducing operating losses. Note. The power line may not implement the boosting retrofit project, and only increase the operating voltage to a value higher than the nominal voltage to continuously improve Power quality and reduce operating losses. 3.2 Energy consumption parameter energyconsumptionparameter A variable or constant that affects the energy-saving effect of an energy management project activity. 3.3 High pressure side measurement measurementonhighvoltagesideoftransformer The electric energy metering device is installed on the high voltage side of the power transformer and measures the high voltage side parameters. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36573-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36573-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 36573-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36573-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |