GB/T 32287-2015 English PDFUS$569.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32287-2015: Method of determination and calculation of heat balance for hot stove in blast furnace Status: Valid
Basic dataStandard ID: GB/T 32287-2015 (GB/T32287-2015)Description (Translated English): Method of determination and calculation of heat balance for hot stove in blast furnace Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: H04 Classification of International Standard: 77.140.40 Word Count Estimation: 27,230 Date of Issue: 2015-12-10 Date of Implementation: 2017-01-01 Quoted Standard: GB/T 2587; GB/T 2588 Regulation (derived from): National Standard Announcement 2015 No.38 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the determination and calculation of the heat balance of hot blast stove, the preparation and determination of content and method, the determination steps and the calculation method and the determination report. This standard is applicable to the determination and calculation of the heat balance of top-fired, external-combustion and internal-combustion hot-blast stoves, and the determination and calculation of the heat balance of other types of hot-blast stoves. GB/T 32287-2015: Method of determination and calculation of heat balance for hot stove in blast furnace---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Method of determination and calculation of heat balance for hot stove in blast furnace ICS 77.010 H04 National Standards of People's Republic of China Measurement and Calculation Method of Thermal Balance of Blast Furnace Hot Stove 2015-12-10 released 2017-01-01 Implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 Determination and calculation of benchmark 1 5 Preparation for determination 2 6 Determination of content and methods 2 7 Measure Step 5 8 Calculation method 5 9 Report 15 Appendix A (Normative Appendix) Equipment and Hot Stove Overview 16 ForewordThis standard is drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by China Iron and Steel Industry Association. This standard is under the jurisdiction of the National Steel Standardization Technical Committee (SAC/TC183). The drafting unit of this standard. Shougang Corporation, Shandong Huimin Technology Development Co., Ltd., Baosteel Group Xinjiang Bayi Iron and Steel Co., Ltd., Beijing Shougang International Engineering Technology Co., Ltd., Metallurgical Industry Information Standards Institute. The main drafters of this standard. Chen Guanjun, Wang Jiangwei, Zhou Huimin, Qiu Jinhui, Shu Yi, Ma Zejun, Zhang Shaoqiang, Wang Jinhua, Zhu Weichun, Zhang fuming, Mao Qingwu, Shan Xiaoxia. Measurement and Calculation Method of Thermal Balance of Blast Furnace Hot Stove1 ScopeThis standard specifies the hot blast furnace hot blast furnace heat balance measurement and calculation of the benchmark, determination of preparation, determination of content and methods, measurement steps and Calculation method, determination report. This standard applies to blast furnace top combustion, external combustion and internal combustion hot air furnace heat balance determination and calculation, other types of hot air furnace heat balance determination And calculation can also refer to.2 normative reference documentsThe following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. General rules for energy balance of energy equipment GB/T General rules for calculation of thermal efficiency of equipment GB/T3 terms and definitionsThe terms and definitions defined in GB/T 2587 and the following terms and definitions apply to this document. 3.1 Operating cycle In the normal production of blast furnace and hot air furnace conditions stable, by the hot air stove this burning period, until the next burning period so far , Including the burning period, the air supply period and the exchange time.4 Determination and calculation of the baseline4.1 reference temperature Using the ambient temperature, take the air temperature around 1m. 4.2 fuel calorific value Using the low (bit) calorific value of the actual fuel. For the general hot stove, the use of wet gas low (bit) calorific value. 4.3 Thermal balance measurement range Hot air stove, including hot air furnace body, hot air duct, air - gas preheating device and flue heat recovery and utilization devices, thermal balance test Can be divided into. a) hot air furnace body. the burning period from the burner to the flue valve, the air supply from the cold air valve to the hot air valve hot air furnace body and its internal Connecting pipe part; b) hot air stove. hot air furnace body plus the external hot air pipe part; c) hot air furnace system. In addition to hot air furnace, but also includes combustion air, gas preheating device and flue heat recovery and utilization of equipment and other parts. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32287-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 32287-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 32287-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32287-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |