GB/T 30163-2023 English PDF

US$269.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 30163-2023: Specifications of top combustion stove with high blast temperature for blast furnace
Status: Valid

GB/T 30163: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 30163-2023269 Add to Cart 3 days Specifications of top combustion stove with high blast temperature for blast furnace Valid
GB/T 30163-2013439 Add to Cart 3 days Specifications of top combustion stove with high blast temperature for blast furnace Obsolete

Similar standards

GB/T 36023   GB/T 36025   GB/T 33785   GB/T 45647   GB/T 45436   

Basic data

Standard ID: GB/T 30163-2023 (GB/T30163-2023)
Description (Translated English): Specifications of top combustion stove with high blast temperature for blast furnace
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: H04
Classification of International Standard: 77-010
Word Count Estimation: 13,176
Date of Issue: 2023-11-27
Date of Implementation: 2024-06-01
Older Standard (superseded by this standard): GB/T 30163-2013
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 30163-2023: Specifications of top combustion stove with high blast temperature for blast furnace


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 77:010 CCSH04 National Standards of People's Republic of China Replace GB/T 30163-2013 Technical Specifications for Energy Saving of High Air Temperature Top-Fired Hot Air Stoves for Blast Furnaces Published on 2023-11-27 2024-06-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee

Foreword

This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document replaces GB/T 30163-2013 "Technical Specifications for Energy Saving of High Wind Temperature Top-Fired Hot Blast Stoves for Blast Furnaces" and is consistent with GB/T 30163- Compared with:2013, in addition to structural adjustments and editorial changes, the main technical changes are as follows: a) Changes in terms and definitions (see Chapter 3, Chapter 3 of the:2013 edition); b) Added top-fired hot blast stove flow chart (see Figure 1 and Figure 2); c) The basic requirements for top-fired hot blast stoves have been changed (see 5:1, 5:1 in the:2013 edition); d) The calorific value of blast furnace gas has been changed (see Table 2, Table 2 of the:2013 version); e) Added requirements for refractory bricks for top-fired hot blast stove burners (see 5:4); f) The requirements for top-fired hot blast furnace regenerator materials, furnace shell materials and material welding points have been changed (see 5:5,:2013 version of 5:5); g) Added requirements for top-fired hot blast stove flue gas waste heat to be used for pulverized coal preheating (see 5:6); h) The requirements for the grate support system have been changed (see 5:7:2,:2013 version of 5:7:2); i) Added emission requirements for pollutants such as nitrogen oxides and sulfur dioxide in the flue gas of top-fired hot blast stoves, and the requirements for the hot blast stove vault and hot blast outlet Requirements for furnace shell surface temperature detection in equal high temperature zones (see 5:8); j) The furnace shell temperature requirements for different parts have been changed (see Table 9, Table 9 of the:2013 version); k) Deleted the calculation of bulk thermal efficiency (see 6:4 of the:2013 edition); l) The operating system and requirements for top-fired hot blast stoves have been changed (see Table 10, Table 10 of the:2013 version); m) Added requirements for energy saving evaluation of top-fired hot blast stoves (see 8:1 and 8:2): Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents: This document is proposed by the China Iron and Steel Industry Association: This document is under the jurisdiction of the National Steel Standardization Technical Committee (SAC/TC183): This document was drafted by: Shougang Group Co:, Ltd:, Zhengzhou Yuxing Hot Blast Stove Technology Co:, Ltd:, Shandong Huimin Technology Development Co:, Ltd:, Metallurgical Industry Information Standards Research Institute, MCC Southern Engineering Technology Co:, Ltd:, Jiangyin Xingcheng Special Steel Co:, Ltd:, Jianlong Acheng Steel Co:, Ltd: Co:, Ltd:, Shiheng Special Steel Group Co:, Ltd:, Zhengzhou Anike Industrial Co:, Ltd:, Hebei Environmental Science Society, China Metallurgical Science and Technology Co:, Ltd: Ltd: The main drafters of this document: Chen Guanjun, Liu Liming, Wang Jiangwei, Zhao Zhilong, Xia Feng, Deng Qiuming, Yang Naihui, Chen Yanbo, Yin Kunbao, Li Jianjun, Zhang Fuming, Liu Liyuan, Tian Fengjun, Qiu Jinhui, Zhang Shaoqiang, Dong Liande, Zhou Weilong, Wang Bo, Dong Chengguo, Zhang Jinbing, Fan Jianchao, Chen Jian, Li Guanpeng, Zhu Weichun, Zhang Ruopeng, Liu Guoyun, Mao Qingwu, Mei Conghua, Zhao Jingjing, Chen Yu, Tian Junyue, Wang Jing: The previous versions of this document and the documents it replaces are as follows: ---First published as GB/T 30163-2013 in:2013; ---This is the second revision: Technical Specifications for Energy Saving of High Air Temperature Top-Fired Hot Air Stoves for Blast Furnaces

1 Scope

This document stipulates the principles and processes, technical requirements, tests, operating systems and energy-saving evaluation of high-temperature top-fired hot blast stoves for blast furnaces: This document is applicable to high-temperature top-fired hot-blast stoves (referred to as top-fired hot-blast stoves) used in newly built, expanded or renovated blast furnaces for iron-making blast furnaces in iron and steel enterprises: Furnace) design, installation and commissioning, etc:

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document: GB/T 699 High-quality carbon structural steel GB/T 700 carbon structural steel GB/T 713 Steel plates for boilers and pressure vessels GB/T 1047 Definition and selection of nominal dimensions of piping components GB/T 1591 Low alloy high strength structural steel GB/T 3077 alloy structural steel GB/T 26480 Inspection and testing of valves GB/T 32287 Determination and calculation method of heat balance of blast furnace hot blast furnace GB 50427 Design specifications for blast furnace ironmaking engineering YB/T 4232 Refractory balls for ball hot blast stoves YB/T 4436 Technical specifications for top-fired hot blast furnace ovens YB/T 4638 Technical specifications for refractory materials for top-fired hot blast stoves YB/T 4639 Andalusite bricks for hot blast stoves YB/T 5012 Shape and dimensions of refractory bricks for blast furnaces and hot blast furnaces

3 Terms and definitions

The following terms and definitions apply to this document: 3:1 A hot blast furnace with a burner located at the top of the furnace body and above the regenerator: 3:2 The effective heat obtained by the hot air at the hot air outlet accounts for the percentage of heat supplied to the hot air furnace body: Note: The unit is in %: 3:3 The ratio of heat exchange area to volume of the regenerator: Note: The unit is square meters per cubic meter (m2/m3):
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 30163-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 30163-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 30163-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 30163-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 30163-2023?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 30163-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.