Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 26692-2011 English PDF

US$599.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 26692-2011: Frequency-flick-free a.c. supplied electronic ballasts for tubular fluorescent lamps - Performance requirements
Status: Obsolete
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 26692-2011599 Add to Cart 3 days Frequency-flick-free a.c. supplied electronic ballasts for tubular fluorescent lamps - Performance requirements Obsolete

Similar standards

GB/T 43081   GB/T 43017   GB/T 19258.1   GB/T 45515   GB/T 17263   GB/T 24823   

Basic data

Standard ID: GB/T 26692-2011 (GB/T26692-2011)
Description (Translated English): Frequency-flick-free a.c. supplied electronic ballasts for tubular fluorescent lamps - Performance requirements
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K71
Classification of International Standard: 29.140.30
Word Count Estimation: 15,179
Date of Issue: 2011-06-16
Date of Implementation: 2011-12-01
Quoted Standard: GB/T 2900.65; GB/T 10682; GB/T 15144-2009; GB/T 17262; GB 17625.1; GB 17743; GB 19510.1; GB 19510.4; IEC 60410
Regulation (derived from): Announcement of Newly Approved National Standards No. 9 of 2011
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the high frequency operation tubular fluorescent electronic ballasts flicker performance requirements. This standard applies to the use of a frequency of 50 Hz, 60 Hz AC power or DC power supply voltage 1 000 V or less, the operating frequency is different from the frequency of the supply, rather than matching using tubular fluorescent lamps shall comply with GB/T 10682 and GB/T 17262 requirements.

GB/T 26692-2011: Frequency-flick-free a.c. supplied electronic ballasts for tubular fluorescent lamps - Performance requirements


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Frequency-flick-free ac supplied electronic ballasts for tubular fluorescent lamps. Performance requirements ICS 29.140.30 K71 National Standards of People's Republic of China Tubular fluorescent lamps flicker-free electronic ballast Performance requirements Issued on. 2011-06-16 2011-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 General notes on 3 5 mark 3 6 3 General Information 7 Start Condition 3 Working conditions 8 4 9 line power factor 4 10 Supply Current 4 A cathode lead 11 introduced into either the maximum current 4 12 Lamp operating current waveform 4 13 ballasts Output current frequency 4 14 acoustic impedance 4 Experimental work under abnormal conditions 15 4 Durability 16 4 17 harmonic 4 18 radio disturbance characteristics 4 Appendix A (normative) Test 5 Appendix B (normative) reference ballast 7 Annex C (normative) benchmark light conditions 10 Annex D (informative) product life and failure rate of 11 evaluation method

Foreword

The Standard Appendix A, Appendix B, Appendix C is normative appendix, Appendix D is an informative annex. The standard proposed by China National Light Industry Council. This standard by the National Standardization Technical Committee of electrical lighting (SAC/TC224) centralized. This standard was drafted. National Electric Light Source Quality Supervision and Inspection Center (Shanghai), Beijing Lighting Research Institute, Zhongshan Op lighting Shares Limited. The main drafters of this standard. Guo Weijun, Han Bing, Yuan Qi, Yang Xiaoping, Zhou Mingxing. Tubular fluorescent lamps flicker-free electronic ballast Performance requirements

1 Scope

This standard specifies the high frequency operation of tubular fluorescent lamps flicker free electronic ballast performance requirements. This standard applies to the use of the frequency of 50Hz, 60Hz AC or DC power supply, voltage 1000V or less, the operating frequency Unlike tubular fluorescent power frequency, match it should comply with GB/T 10682 and GB/T 17262 requirements. Note 1. The test described in this standard are type tests. It does not include a single ballast during production test requirements. Note 2. For the final product, such as lamps and stand-alone control devices, has developed on adjusting the supply current harmonics and immunity of the special standard. At this Aspect, lighting control device plays a major role. Control devices and other components shall comply with these standards.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 2900.65 Electrotechnical terminology Lighting (GB/T 2900.65-2004, IEC 60050 (845). 1987, MOD) GB/T 10682 double-ended fluorescent lamps - Performance requirements GB/T 15144-2009 tubular fluorescent lamps with electronic ballasts Performance requirements (IEC 60929.2006, MOD) GB/T 17262 Single-capped fluorescent lamps - Performance requirements GB 17625.1 Electromagnetic Compatibility Limits for harmonic current emissions (equipment input current ≤16A) (GB 17625.1- 2003, IEC 61000-3-2.2001, IDT) Limits and methods of measurement of radio disturbance characteristics of GB 17743 electrical lighting and similar equipment (GB 17743-2007, CISPR15. 2005 A1.2006, IDT) Part 1 GB 19510.1 lamp control apparatus. General and safety requirements (GB 19510.1-2009, IEC 61347-1. 2007, IDT) Section 4 GB 19510.4 Lamp control unit. electronic ballasts for fluorescent lamps - Particular requirements (GB 19510.4- 2009, IEC 61347-2-3.2006, IDT) IEC 60410 count inspection Sampling plans and procedures (Samplingplansandproceduresforinspectionbyattrib- utes)

3 Terms and Definitions

GB 19510.1 establish the following terms and definitions apply to this standard. 3.1 Start aid startingaid Start auxiliary member may be fixed in a light strip on the outer surface of the conductive member, or a lamp at appropriate intervals to maintain a sheet-shaped guide Electrical components. Start aid is usually grounded and only at one end of the lamp when sufficient work to keep the potential difference. 3.2 Ballast lumen factor balastlumenfactor When tested ballast at its rated voltage, the lamp luminous flux of the lamp and the appropriate reference ballast at its rated voltage and together
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 26692-2011_English be delivered?

Answer: Upon your order, we will start to translate GB/T 26692-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 26692-2011_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 26692-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.