GB/T 18216.5-2021 English PDFUS$264.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18216.5-2021: Electrical safety in low voltage distribution systems up to 1 000 V a. c. and 1 500 V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 5: Resistance to earth Status: Valid GB/T 18216.5: Historical versions
Basic dataStandard ID: GB/T 18216.5-2021 (GB/T18216.5-2021)Description (Translated English): Electrical safety in low voltage distribution systems up to 1 000 V a. c. and 1 500 V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 5: Resistance to earth Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N20 Word Count Estimation: 14,116 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 18216.5-2021: Electrical safety in low voltage distribution systems up to 1 000 V a. c. and 1 500 V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 5: Resistance to earth---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Electrical safety in low voltage distribution systems up to 1 000 V acand 1 500 V dc- Equipment for testing, measuring or monitoring of protective measures-Part 5.Resistance to earth ICS 17.220.20 CCSN20 National Standards of People's Republic of China Replace GB/T 18216.5-2012 AC 1000V and DC 1500V and below Testing of electrical safety protection measures for low-voltage power distribution systems, Measuring or monitoring equipment Part 5.Resistance to earth (IEC 61557-5.2019, IDT) Released on 2021-05-21 and implemented on 2021-12-01 State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee Table of contentsForeword Ⅲ Introduction Ⅴ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Requirements 3 4.1 Overview 3 4.2 Output voltage 3 4.3 Disturbance voltage 3 4.4 Allowable resistance of probe and auxiliary earth electrode 3 4.5 Electrical safety 3 4.6 Clamp 3 for measuring ground loop resistance in accordance with C.3 in Annex C of IEC 60364-6.2016 5 Logo and instruction manual 3 5.1 Logo 3 5.2 Instruction Manual 4 6 Test 4 6.1 Overview 4 6.2 Work uncertainty 4 6.3 Electrical safety 5 Appendix A (informative) Recommended grounding ring coupling clamp test configuration 6 Reference 7ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. This document is GB/T 18216 "AC 1000V and DC 1500V and below low-voltage power distribution system electrical safety protection measures Part 5 of Test, Measuring or Monitoring Equipment. GB/T 18216 has released the following parts. ---Part 1.General requirements; ---Part 2.Insulation resistance; ---Part 3.Loop impedance; ---Part 4.Grounding resistance and equipotential grounding resistance; ---Part 5.Resistance to ground; ---Part 8.Insulation monitoring device in IT system; ---Part 9.Insulation fault location equipment in IT systems; ---Part 12.Performance Measurement and Monitoring Device (PMD). This document replaces GB/T 18216.5-2012 "Electrical safety protection of low-voltage power distribution systems below 1000V AC and 1500V DC Test, measurement or monitoring equipment for protective measures-Part 5.Resistance to ground", compared with GB/T 18216.5-2012, except for structural adjustment and In addition to editorial changes, the main technical changes are as follows. ---Modified terms and definitions (see Chapter 3, Chapter 3 of the.2012 edition); --- Adjusted the structure of Chapter 4 clauses to be consistent with other parts (see Chapter 4, Chapter 4 of the.2012 edition); ---Removed the restriction on reducing the root mean square value (RMS) of the voltage to 25V or the peak value of 35V (see the note to 4.5 in the.2012 edition); ---Added the requirements of the fixture (see 4.6); ---Added the mark of voltage to ground and measurement category (see 5.1); ---Added the "Warning for missing dangerous voltage signs" (see 5.2); --- Replace "percent job uncertainty" with the term "work uncertainty" (see Chapter 6,.2012 edition of 4.3); ---Corrected the uncertainty formula (see Table 1, Table 1 of the.2012 edition); ---The suggestion of ring coupling clamp test configuration has been added (see Appendix A). The translation method used in this document is equivalent to the IEC 61557-5.2019 ``AC 1000V and DC 1500V and below low-voltage power distribution system Testing, measuring or monitoring equipment for integrated electrical safety protection measures. Part 5.Resistance to ground. The Chinese documents that have consistent correspondence with the normatively cited international documents in this document are as follows. ---GB/T 16895.23-2012 Low-voltage electrical installations Part 6.Inspection (IEC 60364-6.2006, IDT). Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed by China Machinery Industry Federation. This document is under the jurisdiction of the National Electrical Instrumentation Standardization Technical Committee (SAC/TC104). Drafting organizations of this document. Harbin Institute of Electrical Engineering and Instrumentation Co., Ltd., Yantai Oriental Weston Electric Co., Ltd., State Grid Jiangsu Provincial Electricity Co., Ltd. Power Co., Ltd., Shenzhen Kelu Electronic Technology Co., Ltd., Xiamen Yesheng Electric Co., Ltd., Heilongjiang Province Electrical Instrument and Meter Project Technology Research Center Co., Ltd., Shenzhen Xinglong Technology Co., Ltd., Yunnan Power Grid Co., Ltd. Measurement Center, Zhejiang Chentaike Technology Co., Ltd., State Grid Chongqing Electric Power Company Marketing Service Center, Ningbo Canaan Intelligent Electric Co., Ltd., State Grid Heilongjiang Province Electric Power Research Institute of Electric Power Co., Ltd., State Grid Jibei Electric Power Co., Ltd. Measurement Center, Xu Ji Group Co., Ltd., Holley Technology Co., Ltd. Co., Ltd., Beijing Zhongchen Hongchang Technology Co., Ltd., Hangzhou Dianwatt Information Technology Co., Ltd. The main drafters of this document. Luo Yurong, Chen Wenxin, Yuan Kuo, Xu Qing, Li Ji, Zhang Dengqing, Jiang Bin, Huang Jianzhong, Shen Xin, Sheng Yuhe, Wang Qingzeng, Wang Sanqiang, Jiang Weiping, Liu Jianfeng, Ye Hongen, Qin Guoxin, Zhou Lixia, Zeng Shitu, Guo Chuang, Li Guilin, Zhang Xiangcheng. The previous versions of this document and the documents replaced are as follows. --- First published in.2007 as GB/T 18216.5-2007, first revised in.2012; ---This is the second revision.IntroductionIEC 60364-6 specifies the first test, continuous monitoring and adjustment of these equipment in TN, TT or IT systems. Standardized conditions for the post-adjustment test. In addition to the general standards that specify the implementation of these tests, IEC 60364-6 also includes To verify the requirements. Only in a few cases, such as when measuring insulation resistance, does IEC 60364-6 include the measuring device used. Details of the characteristics of the settings. Circuit diagrams given as examples in IEC 60364-6 and cited in the main text of the document are generally not applicable actual use. When dangerous voltages appear in the electrical installation and the equipment is improperly used or defective, the implementation of the test in the electrical installation can easily cause concern. outer. Therefore, in addition to simplifying the measurement, technicians also need to rely on measurement devices that ensure the safety of the measurement method. The application of the general safety rules for electrical and electronic measuring devices (IEC 61010-1) for protective measures is in itself insufficient. in Measurements in power installations are not only harmful to technicians, but also to third parties due to different measurement methods. Similarly, in order to obtain an objective judgment about the equipment, such as periodic tests, continuous insulation monitoring, or In the case of performance assurance, an important prerequisite is to use measurement devices from different manufacturers to obtain reliable and comparable measurement results. The purpose of GB/T 18216 is to specify uniform principles that are consistent with the above characteristics. These principles are applicable to nominal voltage AC Measuring and monitoring equipment for electrical safety test and performance test in 1000V and DC 1500V and below systems. GB/T 18216 It is proposed to consist of ten parts. ---Part 1.General requirements. The purpose is to establish a low-voltage power distribution system with nominal voltages of AC 1000V and DC 1500V and below General requirements for test equipment used for electrical safety measurement and monitoring in the system. ---Part 2.Insulation resistance. The purpose is to establish that the measurement is suitable for the insulation of equipment and electrical installation equipment in a non-excited state Relevant requirements for resistance equipment. ---Part 3.Loop impedance. The purpose is to establish between the measuring line conductor and the protective conductor, between the line conductor and the neutral conductor, or between the two conductors. The relevant requirements of the loop impedance device between the line conductors. ---Part 4.Grounding resistance and equipotential grounding resistance. The purpose is to establish the grounding conductor, protective grounding conductor and And the relevant technical requirements for the resistance of the equipotential bonding conductor. ---Part 5.Resistance to ground. The purpose is to establish requirements for measuring equipment that uses AC voltage to measure resistance to earth. ---Part 6.Effectiveness of Residual Current Device (RCD) in TT, TN and IT systems. The purpose is to establish that the measurement is suitable for Relevant requirements for test equipment for the effectiveness of protective measures for residual current devices in TT, TN and IT systems. ---Part 8.Insulation monitoring device in IT system. The purpose is to establish relevant requirements for insulation monitoring devices in IT systems. ---Part 9.Insulation fault location equipment in IT systems. The purpose is to establish the phase of insulation fault location equipment in the IT system. Close requirements. --- Part 10.Combination measuring equipment for testing, measuring or monitoring protective measures. The purpose is to establish test, measurement or monitoring The related requirements of the equipment in which a variety of measurement functions or measurement methods are combined together. ---Part 12.Performance Measurement and Monitoring Device (PMD). The purpose is to establish a comprehensive measurement and monitoring of electrical parameters in the distribution system. Meet the relevant requirements of performance measurement and monitoring devices. AC 1000V and DC 1500V and below Testing of electrical safety protection measures for low-voltage power distribution systems, Measuring or monitoring equipment Part 5.Resistance to earth1 ScopeThis document specifies the requirements applicable to measuring equipment that uses AC voltage to measure resistance to earth.2 Normative referencesThe contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to This document. GB/T 18216.1-2021 AC 1000V and DC 1500V and below low-voltage power distribution system electrical safety protection measures Testing, measuring or monitoring equipment Part 1.General requirements (IEC 61557-1.2019, IDT) IEC 60364-6.2016 Low-voltage electrical installations Part 6.Inspection (Lowvoltageelectricalinstalations-Part 6. Verification) IEC 61010-1.2010 AMD1.2016 Safety requirements for electrical equipment for measurement, control and laboratory use Part 1.General Requirements (Safety requirements for electrical equipment for measurement, control, and laboratory use- Part 1.Generalrequirements) IEC 61010-2-030.2017 Safety requirements for electrical equipment for measurement, control, and laboratory use Part 2-30.With tests and measurements Special requirements for measuring equipment for measuring circuits (Safety requirements for electrical equipment for measurement, control,andlaboratoryuse-Part 2-030.Particularrequirementsforequipmenthavingtestingor measuringcircuits) IEC 61010-2-032 Safety requirements for electrical equipment for measurement, control and laboratory use Part 2-32.Used for electrical tests and measurements Special requirements for hand-held and hand-controlled current sensors (Safety requirements for electrical equipment for measurement,controlandlaboratoryuse-Part 2-032.Particularrequirementsforhand-heldand hand-manipulatedcurrentsensorsforelectricaltestandmeasurement) IEC 61243-3 Live working voltage detector Part 3.Two-pole low voltage type (Liveworking-Voltage detectors-Part 3.Two-polelow-voltagetype)3 Terms and definitionsThe following terms and definitions defined in GB/T 18216.1-2021 apply to this document. ISO and IEC maintain a terminology database for standardization. The website is as follows. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18216.5-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 18216.5-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 18216.5-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18216.5-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 18216.5-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 18216.5-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |