GB/T 18216.11-2024 English PDFUS$354.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18216.11-2024: Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 11: Effectiveness of residual current monitors(RCM)in TT, TN and IT systems Status: Valid
Basic dataStandard ID: GB/T 18216.11-2024 (GB/T18216.11-2024)Description (Translated English): Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 11: Effectiveness of residual current monitors(RCM)in TT, TN and IT systems Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N20 Classification of International Standard: 17.220.20 Word Count Estimation: 18,196 Date of Issue: 2024-12-31 Date of Implementation: 2025-07-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 18216.11-2024: Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 11: Effectiveness of residual current monitors(RCM)in TT, TN and IT systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. National Standard of the People's Republic of China ICS 17.220.20CCS N 20 AC 1 000 V and DC 1 500 V and below Electrical safety protection measures for low voltage power distribution system Testing, measuring or monitoring equipment Part 11.Remaining in TT, TN and IT systems Effectiveness of current monitors (RCM) Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC-Equipment for testing, measuring or monitoring of protective measures-Part 11.Effectiveness of residual current monitors (RCM) in TT, TN and IT systems (IEC 61557⁃11.2020, IDT) 2024-12-31 Release 2025-07-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of ContentsPreface Ⅲ Introduction...Ⅴ 1 Scope...1 2 Normative references ...1 3 Terms and Definitions 1 4 Requirements 3 4.1 General requirements 3 4.2 Function 3 4.3 Fault voltage exceeding UL 6 4.4 Overvoltage 6 5 Marking and instruction manual 6 5.1 Logo 6 5.2 User Manual 6 6 Experiments 7 6.1 General Principles 7 6.2 Working Uncertainty 7 6.3 High fault voltage protection test 8 6.4 Overvoltage test 8 References 9 Figure 1 Maximum step size of increasing smooth DC test current (IT) ...4 Figure 2 Maximum gradient of linearly increasing smooth DC test current (IT) ...4 Figure 3 Example of a linearly increasing smooth DC test current (IT). IΔn = 30 mA...5 Table 1 Evaluation of working uncertainty 8ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. This document is a supplement to GB/T 18216 "Electrical safety protection measures for low voltage power distribution systems with AC 1 000 V and DC 1 500 V and below" Part 11 of "Test, Measuring or Monitoring Equipment". GB/T 18216 has published the following parts. --Part 1.General requirements; --Part 2.Insulation resistance; --Part 3.Loop impedance; --Part 4.Earth resistance and equipotential earth resistance; --Part 5.Resistance to Earth; -- Part 6.Effectiveness of residual current devices (RCD) in TT, TN and IT systems; --Part 7.Phase sequence; -- Part 8.Insulation monitoring devices in IT systems; -- Part 9.Insulation fault location equipment in IT systems; -- Part 10.Combined measuring equipment for testing, measuring or monitoring protective measures; -- Part 11.Effectiveness of residual current monitors (RCM) in TT, TN and IT systems; --Part 12.Power measurement and monitoring devices (PMD). This document is equivalent to IEC 61557-11.2020 "Electrical safety equipment for low voltage power distribution systems up to 1 000 V AC and 1 500 V DC" Testing, measuring or monitoring equipment for complete protective measures - Part 11.Residual current monitors (RCM) for TT, TN and IT systems Effectiveness. The following minimal editorial changes were made to this document. --Corrected the editorial error in 4.3 of IEC 61557 ⁃ 11.2020, from "Figure 1 in IEC 61010 ⁃ 1.2010" to "IEC 61010-1.2010 Figure 2"; --Correct the editorial error in the formula in Note 6.1 of IEC 61557-11.2020, changing from “RA max = U LIΔn IΔo” to “RA max = UL IΔn ”. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Machinery Industry Federation. This document is under the jurisdiction of the National Technical Committee for Standardization of Electrical Instruments (SAC/TC 104). This document was drafted by. Jiaxing Power Supply Company of State Grid Zhejiang Electric Power Co., Ltd., Harbin Electric Instrument Research Institute Co., Ltd., Huali Technology Co., Ltd., State Grid Chongqing Electric Power Company Marketing Service Center, Wuxing Technology (Shenzhen) Co., Ltd., Zhejiang Grete Electric Co., Ltd. Co., Ltd., Shenzhen Kelu Electronic Technology Co., Ltd., Yantai Dongfang Weston Electric Co., Ltd., State Grid Jilin Electric Power Co., Ltd. The company's marketing service center, China Southern Power Grid Co., Ltd. Ultra-high Voltage Transmission Company, State Grid Sichuan Electric Power Company Luzhou Power Supply Company, Yunnan Power Grid Co., Ltd., Ningbo Canaan Intelligent Electric Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Marketing Service Center, Henan High Voltage Electrical Equipment Research Institute Co., Ltd., Shenzhen Hongxing Zhilian Technology Co., Ltd., Shandong Electric Power Group New Energy Technology Co., Ltd., Huaneng Huaiyin Second Power Generation Co., Ltd., Jiangsu Huapeng Intelligent Instrument Technology Co., Ltd., China Electric Equipment Shandong Electronics Co., Ltd., Hubei Demei Electric Control Technology Co., Ltd., Shandong Guangyu Technology Co., Ltd., Zhejiang Wansheng Intelligent Technology Co., Ltd., Panjin Guanglida Electric Gas Co., Ltd., Zhejiang Chengtong Electric Power Technology Co., Ltd., Shandong Electric Power Group Digital Technology Co., Ltd., Shangtu Electric Co., Ltd., Beijing Yupont Electric Power Technology Co., Ltd., Zhejiang Westinghouse Electric Co., Ltd., Zhejiang Nanjin Electric Co., Ltd., State Grid Anhui Electric Huainan Power Supply Company of Shenzhen Power Co., Ltd., Shenzhen Longyuan Technology Co., Ltd., Daqing Oilfield Co., Ltd., Liaocheng Huarui Electric Co., Ltd. Co., Ltd., Tianjin Dongquan Petroleum Technology Development Co., Ltd., and Anhui Youdan Technology Co., Ltd. The main drafters of this document are. Xing Jianxu, Qian Weijie, Zeng Shitu, Cheng Yingying, Hou Qingquan, Chang Wei, Jiang Bin, Peng Yong, Wang Jianyi, Zhang Quansheng, Ju Moxin, Yao Wenbo, Wen Caiquan, Chen Wenxin, Cheng Xingliang, Shen Xin, Li Junming, Hu Hongqiong, Zhang Enyou, Xu Minrui, Xing Wenqi, Li Keguang, Shan Guanhua, Ding Hao, Jiang Xuliang, Dai Wenjun, Liu Huiyong, Ding Yi, Yao Guangqing, Li Jun, Fu Chunming, Ye Zhiwei, Yang Kuigang, Li Hongying, Dai Jiyong, Cui Jiasong, Wang Bingjun, Zheng Zhihao, Lin Xiaohai, Dai Zhong, Ye Xiaopeng, Ou Yong, Chen Jian, Jiang Guangzhen, Ma Weidong, Wang Xiaodong.IntroductionIEC 60364-6 specifies the initial testing, continuous monitoring and commissioning of electrical installations in TN, TT or IT systems. In addition to specifying the general criteria for carrying out these tests, IEC 60364-6 also includes the Only in a few cases, such as when measuring insulation resistance, does IEC 60364-6 include the requirements for the measuring equipment used. Circuit diagrams given as examples in IEC 60364-6 and referenced in the main body of the document are generally not applicable to Actual use. When dangerous voltages are present in electrical installations and equipment is used improperly or is damaged, testing can easily cause accidents. Therefore, technicians need to rely on measuring devices that ensure the safety of the measuring method in addition to simplifying the measurement. Applying the general rules for safety of electrical and electronic measuring equipment (IEC 61010-1) to perform protective measures testing is not sufficient in itself. Measurements in power installations can pose a hazard not only to the technicians but also to third parties due to different measurement methods. Likewise, in order to obtain an objective assessment of the equipment, for example, periodic testing, continuous insulation monitoring or In the case of performance assurance, an important prerequisite is to obtain reliable and comparable measurement results with measuring devices from different manufacturers. GB/T 18216 Test Method for Electrical Safety Protection Measures for Low Voltage Distribution Systems with AC 1000 V and DC 1500 V and Below The purpose of the "Testing, Measuring or Monitoring Equipment" is to provide uniform principles for compliance with the above characteristics, which apply to nominal voltage AC Measuring and monitoring equipment for electrical safety tests and performance tests in systems up to 1 000 V and 1 500 V DC. GB/T 18216 It is planned to consist of 17 parts. --Part 1.General requirements. The purpose is to establish the low voltage distribution system with a nominal voltage of 1 000 V AC and 1 500 V DC and below General requirements for test equipment used for measuring and monitoring electrical safety in systems. -- Part 2.Insulation resistance. The purpose is to establish the insulation resistance of equipment and electrical installation equipment in the non-energized state. Relevant requirements for resistance equipment. -- Part 3.Loop impedance. The purpose is to establish the impedance between the line conductor and the protective conductor, between the line conductor and the neutral conductor, or between the line conductor and the neutral conductor. Requirements for loop impedance equipment between two conductors. --Part 4.Ground resistance and equipotential ground resistance. The purpose is to establish the ground conductor of the measuring equipment, the protective ground conductor And related requirements for the resistance of equipotential bonding conductors. --Part 5.Resistance to Earth. The purpose is to establish the requirements for measuring equipment that uses AC voltage to measure resistance to earth. -- Part 6.Effectiveness of residual current devices (RCD) in TT, TN and IT systems. The purpose is to establish the Requirements for measuring equipment for the effectiveness of protective measures provided by residual current devices in TT, TN and IT systems. --Part 7.Phase sequence. The purpose is to establish the requirements for measuring equipment used to test the phase sequence of three-phase distribution systems. --Part 8.Insulation monitoring devices in IT systems. The purpose is to establish the relevant requirements for insulation monitoring devices in IT systems. -- Part 9.Insulation fault location equipment in IT systems. The purpose is to establish the relevant About requirements. -- Part 10.Combined measuring equipment for testing, measuring or monitoring protective measures. The purpose is to establish within a device Combined measurement that combines several measurement functions or test methods that conform to the individual parts of this series of standards Equipment requirements. -- Part 11.Effectiveness of residual current monitors (RCM) in TT, TN and IT systems. The purpose is to establish Requirements for equipment for testing the effectiveness of residual current monitors (RCM) installed in power distribution systems. --Part 12.Quantity measurement and monitoring devices (PMD). The purpose is to establish a comprehensive system for measuring and monitoring electrical parameters in power distribution systems. Relevant requirements for combined electrical quantity measuring and monitoring devices. -- Part 13.Hand-held and hand-operated current clamps and sensors for measuring leakage current in distribution systems. Requirements for hand-held and hand-operated current clamps and sensors for measuring leakage current in electrical systems. -- Part 14.Equipment for testing the safety of electrical equipment of machinery. The purpose is to specify the equipment for testing the safety of electrical equipment of machinery Special requirements for equipment. -- Part 15.Functional safety requirements for insulation monitoring devices and insulation fault location equipment in IT systems. Functional safety requirements for insulation monitoring devices and insulation fault location equipment in systems. -- Part 16.Equipment for testing the effectiveness of protective measures for electrical equipment and/or medical electrical equipment. The purpose is to specify the test Particular requirements for equipment to ensure the effectiveness of protective measures for electrical equipment and/or medical electrical equipment. --Part 17.Non-contact AC voltage indicators. The purpose is to specify the minimum performance of non-contact AC voltage indicators Require. AC 1 000 V and DC 1 500 V and below Electrical safety protection measures for low voltage power distribution system Testing, measuring or monitoring equipment Part 11.Residual in TT, TN and IT systems Effectiveness of current monitors (RCM)1 ScopeThis document specifies the test equipment used to test the effectiveness of residual current monitors (RCM) installed in power distribution systems. Require. The test equipment can be used for any type of network, such as TN, TT or IT systems. The RCM that distinguishes the direction in the system. The purpose of this document is not to validate an RCM against its product standard.2 Normative referencesThe contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 18216.1-2021 Electrical safety protection measures for low voltage power distribution systems up to 1 000 V AC and 1 500 V DC Test, measuring or monitoring equipment for use with electrical equipment Part 1.General requirements (IEC 61557-1.2019, IDT) IEC 61010-1.2010 Safety requirements for electrical equipment for measurement, control and laboratory use Part 1.General requirements requirements for electrical equipment for measurement, control and laboratory use-Part 1.General require⁃ ments) Note. GB 4793.1-2007 Safety requirements for electrical equipment for measurement, control, and laboratory use Part 1.General requirements (IEC 61010-1.2001, IDT). IEC 61557-6 Tests and measurements of electrical safety protection measures for low voltage power distribution systems up to 1 000 V AC and 1 500 V DC Measuring or monitoring equipment Part 6.Effectiveness of residual current devices (RCD) in TT, TN and IT systems (Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC-Equipment for testing, measuring or monitoring of protective measures-Part 6.Effectiveness of residual current devices (RCD) in TT, TN and IT systems Note. GB/T 18216.6-2022 Test, measurement or Monitoring equipment Part 6.Effectiveness of residual current devices (RCD) in TT, TN and IT systems (IEC 61557-6.2019, IDT).3 Terms and definitionsThe terms and definitions defined in GB/T 18216.1-2021, IEC 61557-6 and the following apply to this document. ISO and IEC maintain terminology databases for standardization at the following addresses. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18216.11-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 18216.11-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 18216.11-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18216.11-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |