|
US$259.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. SN/T 1179.1-2007: Rules for the inspection of power transformers for import and export. Part 1: General requirements Status: Valid SN/T 1179.1: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| SN/T 1179.1-2007 | English | 259 |
Add to Cart
|
3 days [Need to translate]
|
Rules for the inspection of power transformers for import and export. Part 1: General requirements
| Valid |
SN/T 1179.1-2007
|
| SN/T 1179-2003 | English | 359 |
Add to Cart
|
3 days [Need to translate]
|
Rules for the inspection of power transformers for export
| Obsolete |
SN/T 1179-2003
|
PDF similar to SN/T 1179.1-2007
Standard similar to SN/T 1179.1-2007 GB 1094.11 SN/T 3248.2 SN/T 0811
Basic data | Standard ID | SN/T 1179.1-2007 (SN/T1179.1-2007) | | Description (Translated English) | Rules for the inspection of power transformers for import and export. Part 1: General requirements | | Sector / Industry | Commodity Inspection Standard (Recommended) | | Classification of Chinese Standard | K41 | | Classification of International Standard | 29.180 | | Word Count Estimation | 8,887 | | Date of Issue | 8/6/2007 | | Date of Implementation | 2008-03-01 | | Older Standard (superseded by this standard) | SN/T 1179-2003 | | Quoted Standard | GB/T 191; GB 1094.1-1996; GB 1094.2-1997; GB 1094.3-2003; GB 2536-1990; GB 6450-1986; GB/T 6451-1999; GB/T 10228-1997; SN/T 0002 | | Regulation (derived from) | Accredidation-Technology-Letter [2015] No. 247 | | Issuing agency(ies) | General Administration of Customs | | Summary | This standard specifies the requirements for the import and export of power transformers, inspection and judgment. This standard applies to three-phase and single-phase power transformer test. |
SN/T 1179.1-2007: Rules for the inspection of power transformers for import and export. Part 1: General requirements ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Rules for the inspection of power transformers for import and export.Part 1. General requirements
Exit inspection and quarantine industry standard book People's Republic of China
Instead of the SN/T 1179-2003
Inspection of import and export of power transformers
Part 1. General requirements
Posted 2007-08-06
2008-03-01 implementation
People's Republic of China
The State Administration of Quality Supervision, Inspection and Quarantine released
Foreword
This section SN/T 1179 Part 1.
This section proposed and managed by the National Certification and Accreditation Administration Committee.
This section was drafted by. People's Republic of China Jiangsu Entry-Exit Inspection and Quarantine Bureau, People's Republic of China Tianjin Entry-Exit Inspection and
Quarantine Bureau.
The main drafters of this section. Ma Ji, Wang Jin Tao, Chen Fei, Zhang Tao, Yu Xiaoyang.
The partial replacement of SN/T 1179-2003 "export inspection of power transformers."
Introduction
"Inspection of import and export power transformer" is the import and export power transformer inspection work in accordance with the import and export inspection from the power transformer
To guide and regulate the role.
With China's accession to the World Trade Organization Amendments (WTO) and the "Commodity Inspection Law", the import and export commodity inspection mode has undergone a drastic change
Technology, in order to adapt to the situation and change, the state inspection and quarantine departments in charge of the establishment of a system of inspection and quarantine standards.
This part belongs to the inspection and quarantine standards of the third layer (second layer of professional mechanical and electrical inspection standard system) --- category common standards,
General requirements for the power transformer test.
Inspection of import and export of power transformers
Part 1. General requirements
1 Scope
SN/T 1179 This section specifies the requirements for the import and export power transformer, testing and judgment.
This section applies to the three-phase and single-phase power transformers (including auto-transformers) test.
Small and special transformers (eg. 1kVA less than the rated capacity of single-phase transformer rated capacity of less than 5kVA and three-phase transformer
Filter; transformer; converter transformer; electric locomotive traction transformer; starting transformer; test transformer; welding transformers) no corresponding test standard
Time, can refer to this section.
2 Normative references
The following documents contain provisions which, through reference SN/T 1179 to the present, constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 191 Packaging - Pictorial signs (GB/T 191-2000, eqv ISO 780.1997)
GB 1094.1-1996 Power transformers - Part 1. General (eqv IEC 60076-1.1993)
GB 1094.2-1997 Power transformers - Part 2. Temperature Rise (eqv IEC 60076-2.1993)
GB 1094.3-2003 Power transformers Part 3. Insulation levels, dielectric tests and external insulation air gap (IEC 60076-3.
2000, MOD)
GB 2536-1990 transformer oil (neqIEC 60296. 1982)
GB 6450-1986 dry type power transformers (eqvASTMD1500. 1982)
GB/T 6451-1999 Three-phase oil-immersed power transformers technical parameters and requirements
GB/T 10228-1997 dry-type power transformers technical parameters and requirements
The basic provisions of SN/T 0002 Electromechanical Import and Export Commodity Inspection procedures prepared
3 Terms and Definitions
SN/T 0002 and established the following terms and definitions apply to SN/T 1179 of this part.
3.1
According to the mandatory requirements of national technical specifications, batch import and export commodities or pumping batch sampling and inspection of the implementation of conformity assessment activities.
3.2
According to the mandatory requirements of national technical specifications, the full implementation of import and export commodities inspection and examination of conformity assessment activities.
3.3
To carry out the inspection and collection of the same specifications, models, produced under the same conditions of production per unit of product, referred to as batch.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of SN/T 1179.1-2007_English be delivered?Answer: Upon your order, we will start to translate SN/T 1179.1-2007_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of SN/T 1179.1-2007_English with my colleagues?Answer: Yes. The purchased PDF of SN/T 1179.1-2007_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version SN/T 1179.1-2007?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version SN/T 1179.1-2007 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|