GBZ32519.1-2016: 1 000 MW class hydro-generator -- Part 1: Technical guide
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/Z 32519.1-2016English379 Add to Cart 4 days [Need to translate] 1 000 MW class hydro-generator -- Part 1: Technical guide Valid GB/Z 32519.1-2016

PDF similar to GBZ32519.1-2016


Standard similar to GBZ32519.1-2016

GB/T 22720.1   GB/T 22719.1   GB/T 22719.2   GB/T 17948.7   GB/T 21707   GB/Z 32519.2   

Basic data

Standard ID GB/Z 32519.1-2016 (GB/Z32519.1-2016)
Description (Translated English) 1 000 MW class hydro-generator -- Part 1: Technical guide
Sector / Industry National Standard
Classification of Chinese Standard K20
Classification of International Standard 29.160.20
Word Count Estimation 19,181
Date of Issue 2016-02-24
Date of Implementation 2016-09-01
Regulation (derived from) National Standard Announcement No
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

GBZ32519.1-2016: 1 000 MW class hydro-generator -- Part 1: Technical guide

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
1 000 MW class hydro-generator - Part 1. Technical guide ICS 29.160.20 K20 People's Republic of China national standardization of technical guidance documents 1000MW water turbine generator Part 1. Technical guidelines 2016-02-24 Published 2016-09-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword Ⅲ Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 use of environmental conditions 1 5 Ratings and parameters 2 6 temperature and temperature 3 7 operating characteristics and electrical connections 3 8 Insulation properties and withstand voltage test 4 Mechanical properties 6 Main structural components allowable stress Basic requirements of structure 10 Ventilation and cooling system Braking system Fire Extinguishing System Monitoring Systems and Devices and Components 11 16 excitation system 11 17 Scope of delivery 12 18 logo, packaging, transportation and custody 12 19 factory and field test 12 20 trial run and guarantee period 12

Foreword

GB /Z 32519 "1000MW-class hydro-generator" is divided into the following three parts. --- Part 1. Technical guidelines; --- Part 2. Tests, test guidelines; --- Part 3. Installation of quality inspection guidelines. This section GB /Z 32519 Part 1. This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document is proposed by China Electrical Equipment Industry Association. This guidance document is organized by the National Large Scale Generator Standardization Technical Committee (SAC/TC511). The drafting of the guidance of technical documents. Harbin Electric Works Co., Ltd., China Construction Group Beijing Institute of Survey and Design Limited Company, Harbin Institute of Electrical Engineers, China Hydropower Engineering Consulting Group Co., Ltd., Dongfang Electric Group Dongfang Electric Co., Ltd., State Water Power Generation Engineering Research Center, the Yangtze River Design Company, China Construction Group East China Survey and Design Institute Co., Ltd., China Electric Industry Association, China Three Gorges Corporation. The main drafters of this technical paper, Wang Yanlu, Wan Fengxia, Sun Yutian, Zhou Bo, Li Dingzhong, Zheng Xiaokang, Fu Changhong, Ming Ye, Wang Shuqing, Li Yuzhen, Liu Yali, Zou Zu Bing.

Introduction

Hydropower construction in China's energy development has an important strategic position, plays an important role in the national economy. With the market for power generation The requirements for the development of high capacity, high parameters, high efficiency and low consumption, safety and environmental protection are continually increasing, and the requirements of the state in the "12th Five-Year Plan" Indeed proposed to vigorously develop hydropower, China will have a group of 1000MW super-large hydropower unit design and manufacture. To this end has prepared the following series Standard. "1000MW-class hydro-generator", for hydro-generator, there are GB/T 7894 "hydro-generator basic technical conditions" GB/T 8564 "Technical Specifications for Installation of Hydro-generating Sets", GB/T 1029 "Three-phase synchronous motor test methods" and related manufacturing, testing, etc. Aspects of standards and norms. When the single generator capacity increases to 1000MW, the operating conditions of hydropower units, performance parameters, overall Structural and material applications will change. Due to the size of the unit, operating conditions, performance parameters have undergone major changes, these are current Of the hydropower unit national design, manufacture, installation, inspection standards will not be fully applicable. Therefore, based on the existing standards and norms, 1000MW-class generators related to the special characteristics of the corresponding research, and developed for the 1000MW-class hydropower unit design, system Made, installed, inspection standards and specifications. This guidance document is based on the research results and summary of the 1000MW giant vertical hydro-generator in recent years 700MW large-scale vertical hydro-generator design, manufacture, installation, inspection, operating experience compiled, is 1000MW-class hydro-generator Guidance documents related to technical work. 1000MW water turbine generator Part 1. Technical guidelines

1 Scope

This Guidance Document specifies the main technologies of a 1000 MW three-phase salient pole synchronous hydrogenerator (hereinafter referred to as hydrogenerator) Surgical parameters and performance requirements, the overall structure design, the main components of the structure, material selection principles, work stress and evaluation criteria. This Guidance Document is applicable to three-phase salient pole synchronous hydrogenerators of 800 MW and above.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. Rotating electrical machinery quota and performance GB 755-2008 GB/T 1408.1 Insulating material Electrical strength test methods Part 1 GB/T 2900.25 Electrotechnical terminology rotary motor GB/T 5321 calorimeter Determination of motor loss and efficiency (GB/T 5321-2005, IEC 60034-2A.1974, IDT) GB/T 7409.3 synchronous motor excitation system Large and medium synchronous generator excitation system technical requirements Basic technical requirements of hydroelectric generators GB/T 7894-2009 GB/T 13394 Electrotechnical rotary motors with letter symbols symbols GB/T 28570 turbine generator online monitoring system Technical Guidelines Turbine generators of 1000 MW class - Part 2. Guidelines for testing and inspection GB/T Preventive test code for power equipment DL/T 1067 evaporative cooling hydro-generator (power generation/motor) basic technical conditions IEEE1043-1996 (R2009) forming rod and coil electrical aging test Recommended Practice (RecommendedPracticefor Voltage-Endurance Test of form-WoundBars and Coil) IEEE1310-2012 large rotating electrical machine stator bar and coil thermal cycle test Recommended Practice (Recommended PracticeforThermalCycleTestingofForm-WoundStatorBarsandCoilforLargeRotatingMa- chines IEEE1553-2002 (R2007) hydroelectric generator forming coil and bar electrical aging test standard (StandardforVoltage-En- duranceTestingofForm-WoundCoilsandBarsforHydrogenerators)

3 Terms and definitions

The terms and definitions used in this guidance document are found in the relevant standards such as GB 755-2008 and GB/T 2900.25. Commonly used things Quantitative symbols see GB/T 13394.

4 use of environmental conditions

Turbine generator operating conditions should meet the GB/T 7894-2009 Chapter 4 requirements.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ32519.1-2016_English be delivered?

Answer: Upon your order, we will start to translate GBZ32519.1-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ32519.1-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ32519.1-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.