Technical specification of power energy efficiency monitoring system -- Part 3: Communication protocol
| Valid |
GB/T 31960.3-2015
|
PDF similar to GB/T 31960.3-2015
Basic data | Standard ID | GB/T 31960.3-2015 (GB/T31960.3-2015) | | Description (Translated English) | Technical specification of power energy efficiency monitoring system -- Part 3: Communication protocol | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F20 | | Classification of International Standard | 27.010 | | Word Count Estimation | 135,168 | | Date of Issue | 2015-09-11 | | Date of Implementation | 2016-04-01 | | Regulation (derived from) | National Standard Announcement 2015 No.25 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 31960.3-2015: Technical specification of power energy efficiency monitoring system -- Part 3: Communication protocol ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification of power energy efficiency monitoring system - Part 3. Communication protocol
ICS 27.010
F20
National Standards of People's Republic of China
Electricity Energy Efficiency Monitoring System Technical Specifications
Part 3. Communication Protocol
Part 3. Communicationprotocol
Issued on. 2015-09-11
2016-04-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms, Definitions and Abbreviations 1
4 structure 2
5 transmission interface 11
6 Main (sub) station and the centralization and interactive terminal communication protocol 12
7 Concentration and interactive terminal and monitoring terminal communication protocol 62
Appendix A (normative) definition of data format 104
Appendix B (normative) state the amount of data in the data format 109
Annex C (normative) harmonic Data Format 111
Annex D (normative) Non-electrical data in the data format 112
Appendix E (normative) event code ERC and event log data format 113
Annex F (normative) to confirm/deny information code 124
Annex G (normative) the amount of non-electrical type 125
Annex H (normative) software and hardware version information 126
Annex I (normative appendix) IP Address Data Format 127
Appendix J (normative) Symbols and Abbreviations 128
Foreword
GB/T 31960 "Energy Efficiency Power Monitoring System technical specifications" is divided into 13 parts.
--- Part 1. General;
--- Part 2. Master the functional specification;
--- Part 3. communication protocols;
--- Part 4. sub-station functional design specifications;
--- Part 5. master design guidelines;
--- Part 6. Power and energy-efficient centralized information exchange terminal technical conditions;
--- Part 7. Energy Efficiency Power monitoring terminal technical conditions;
--- Part 8. Security specification;
--- Part 9. system test specification;
--- Part 10. Power of energy efficiency monitoring terminal test specifications;
--- Part 11. Power and energy-efficient centralized information exchange terminal test specifications;
--- Part 12. Construction specification;
--- Part 13. Field handheld device specifications.
This section GB/T Part of 331,960.
This section drafted in accordance with GB/T 1.1-2009 given rules.
Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents.
This section is proposed and managed by the China Electricity Council.
This part of the main drafting units. China Electric Power Research Institute, Shanghai Arima Electronic Equipment Co., Ltd., Shanghai Cooperative Technology Co. Shares
The company, Guangdong Yu Technology Co., Ltd., State Grid Corporation, China Southern Power Grid Company Energy Service Company, Nanjing NARI Group Corporation Beijing
Communication and electricity Technology Branch, Sichuan Venus Sichuan Electric Co., Ltd., Beijing Guodian Network Technology Co., Ltd., Jiangsu to the macro automatically
System Engineering Co., Ltd. Suzhou Taigu electricity.
The main drafters of this section. Li Jie, Li Li, Geng Yu Hong, Zhong, Wen-hui, Wu Mingyu, Wang Xin, heavy Cao, Wang He, by Guo bridge, Feng Bow before,
Lin Bo, Wu Xinling, Jun Wang group, Qin Jianrong, Guo Yanfei.
Electricity Energy Efficiency Monitoring System Technical Specifications
Part 3. Communication Protocol
1 Scope
GB/T 31960 provisions of this part of the energy efficiency of electric power monitoring system (hereinafter referred to as the "System") of the main (sub) power station and energy efficiency information set
The interaction between the terminal (hereinafter referred to as "centralized and interactive terminals"), the power of energy efficiency information is centralized and interactive terminal and the power of energy efficiency monitoring terminal
Data transmission frame format (hereinafter referred to as the "Monitoring Terminal") between the data encoding and transmission rules.
This section applies to point-to-multi-point collinear and a multipoint communication, the power of energy efficiency monitoring system master (sub) energy efficiency of the power station
Centralized information and interactive terminal, power and energy-efficient centralized information exchange terminal for monitoring the energy efficiency of electric power from the main terminal to perform questions and answers, as well as in the letter
Power Road, with the support of energy efficiency information is centralized and interactive terminal, power terminal is actively monitoring energy efficiency uploads communications.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2260-2007 People's Republic of China administrative division code
GB/T 18657.1-2002 Telecontrol equipment and systems - Part 5 Transmission protocols - Section 1 Transmission frame formats
DL/T 645-2007 multifunction energy meter communication protocol
3 Terms, definitions and abbreviations
3.1 Terms and Definitions
The following terms and definitions apply to this document.
3.1.1
Tasks task
Electricity provision of energy efficiency information is centralized and interactive terminals or electrical energy efficiency monitoring terminal to perform the desired operation at a specified time or condition
sequence.
3.1.2
Measuring point measuredpoint
It can be measured with a measuring device or a centralized information and monitoring terminal electrical connections of interactive terminals only one set of measurements, when the matter
The same electrical connections on a plurality of processing means is measured, or measured by a device but is delivered to the terminal through a variety of ways
When, in accordance with a plurality of measuring points count, each measurement point has a unique positioning logic coding, is the means of the terminal configuration parameters, data applications
Unique object identifier.
3.1.3
Information points informationpoint
Represent parameters or data object information, such as the electrical measurement point number, non-electrical measuring point number, the monitoring terminal number, task number.
3.1.4
Info informationtype
A parameter representing classified information or data, a class can be a parameter information or data may be a set of parameters or data
|