US$1669.00 · In stock Delivery: <= 10 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28029.3-2020: Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus (WTB) conformance testing Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 28029.3-2020 | English | 1669 |
Add to Cart
|
10 days [Need to translate]
|
Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus (WTB) conformance testing
| Valid |
GB/T 28029.3-2020
|
PDF similar to GB/T 28029.3-2020
Basic data | Standard ID | GB/T 28029.3-2020 (GB/T28029.3-2020) | | Description (Translated English) | Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus (WTB) conformance testing | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | S70 | | Classification of International Standard | 45.060 | | Word Count Estimation | 90,943 | | Date of Issue | 2020-03-06 | | Date of Implementation | 2020-10-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 28029.3-2020: Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus (WTB) conformance testing ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electronic railway equipment--Train communication network (TCN)-Part 2-2. Wire Train Bus (WTB) conformance testing
ICS 45.060
S70
National Standards of People's Republic of China
Partially replace GB/T 28029.2-2011
Rail Transit Electronic Equipment Train Communication Network (TCN)
Part 2-2. Stranded Train Bus (WTB)
Conformance test
[IEC 61375-2-2..2012, Electronicrailwayequipment-Traincommunication
2020-03-06 Release 2020-10-01 Implementation
State Administration of Market Supervision and Administration
Issued by the National Standardization Management Committee
Contents
Foreword Ⅲ
Introduction Ⅵ
1 Scope 1
2 Normative references 1
3 Terms and definitions, abbreviations 1
3.1 Terms and definitions 1
3.2 Acronyms 1
4 Conformance test methods, requirements and boundaries 2
4.1 Method 2
4.2 Requirement 3
4.3 Boundary 5
4.4 Consistency assessment process framework 9
5 Conformance testing of WTB nodes, backbone cables, jumper cables, and extension cables 10
5.1 Overview 10
5.2 PICS 10
5.3 PICS Table 12
5.4 Basic Interconnection Test 19
5.5 Proficiency test 19
5.6 Behavior Test 19
6 RTP conformance test 51
6.1 RTP conformance test description 51
6.2 Ports and communication memory 51
6.3 Robustness of the dataset 51
6.4 Port address 52
6.5 Link Process Data Interface Primitives 52
6.6 Message Services and Protocols 52
7 WTB Group Conformance Test 53
7.1 General 53
7.2 PICS 53
7.3 Test sets 55
7.4 Marshalling network interoperability test 64
7.5 Application Specification 64
7.6 Multiple nodes on a group 64
8 Network management conformance testing 64
Appendix A (informative appendix) The structural changes of this part compared with IEC 61375-2-2..2012 65
Appendix B (Normative Appendix) Test Lab Duties and Client Duties 69
Appendix C (informative appendix) test equipment and dedicated test bench 75
References 82
Foreword
GB/T 28029 "Train Communication Network (TCN) for Rail Transit Electronic Equipment" is divided into the following 12 parts.
--- Part 1. Basic structure;
--- Part 2-1. Stranded Train Bus (WTB);
--- Part 2-2. Conformance Test of Wire Train Bus (WTB)
--- Part 2-3. TCN Communication Protocol;
--- Part 2-4. TCN Application Specification;
--- Part 2-5. Ethernet Train Backbone (ETB);
--- Part 2-6. Vehicle-ground communication;
--- Part 2-7. Radio-based Wireless Train Backbone Network (WLTB);
--- Part 3-1. Multifunctional Vehicle Bus (MVB);
--- Part 3-2. Multi-function vehicle bus (MVB) conformance test;
--- Part 3-3. CANopen Marshalling Network (CCN);
--- Part 3-4. Ethernet Marshalling Network (ECN).
This part is part 2-2 of GB/T 28029.
This section was drafted in accordance with the rules given in GB/T 1.1-2009.
This part replaces GB/T 28029.2-2011 "Traction bus of traction electrical equipment Part 2. Train communication network consistency test
Compared with GB/T 28029.2-2011, the main technical changes in the content of WTB conformance test in the test are as follows.
--- Modify "connection resistance" to "contact resistance" (see 5.3.9.3.4,.2011 version 4.1.2.9.2.3);
--- Modify "test procedure" to "test suite" (see 4.1, 4.2.5.2, 4.3.5, 4.3.6.1, 5.6.2.6, 5.6.2.14, 5.6.3.1, 6.1,
7.3, Chapter 8, B.2.1 ~ B.2.5, B.3.3, B.3.4, B.4.2.2, B.4.3.1, B.4.3.2, C.1,.2011 version 4.1.6.7 ,
4.1.6.14, Chapter 5, 6.3, Chapter 7, A.2, A.3, A.4.2, B.1.1.1).
This part uses the redrafting method to modify the adoption of IEC 61375-2-2..2012 "railway electronic equipment train communication network (TCN)
Part 2-2. Conformance testing of stranded train buses. "
Compared with IEC 61375-2-2..2012, this part has more structural adjustments. Appendix A lists this part and IEC 61375-2-2.
A comparison list of chapter numbers in.2012.
Compared with IEC 61375-2-2..2012, there are technical differences between this part and the clauses involved in these differences have been passed on the outside margin.
The vertical single line (|) in the white position is marked. The specific technical differences and the reasons are as follows.
--- Added the content of "Regulations" in the scope to meet the requirements of GB/T 1.1 (see Chapter 1).
--- With regard to normative quotation documents, this part has been adjusted with technical differences to adapt to China's technical conditions and adjustments
The situation is reflected in Chapter 2 "Regulatory Reference Documents", with specific adjustments as follows.
● Replace ISO /IEC 9646-1..1994 with GB/T 17178.1 equivalent to international standards (see 3.1, 4.1);
● Replace ISO /IEC 9646-7..1995 with GB/T 17178.7 equivalent to international standards (see 4.1);
● Replaced IEC 60571 with GB/T 25119 modified to adopt international standards (see 4.3.8, 5.3.2);
● Replaced IEC 61375-2-1 with modified GB/T 28029.2-2020 adopting international standards (see 3.1, Chapter 4 to Chapter 7
Chapter, Appendix B and Appendix C);
● Added reference to GB/T 28029.4 (see 5.6.3.20);
● ISO 7498 has been deleted.
--- Increase the method of measuring the insertion loss using the network analyzer, after the test verification and analysis, use the network analyzer to measure the insertion
The loss test accuracy is higher, and the test environment has less effect on the test results (see 5.6.1.3.1).
--- Deleted part of the test, because "configuration fixture 1 (configuration fixture 1) and configuration fixture 2 are not defined in the standard
(configurationfixture2) "(see 5.1.5.6.2 and 5.1.5.6.3 of IEC 61375-2-2..2012).
--- Modify the "Note" of Table 29 to paragraph, because the table note contains the requirements (see 5.6.2.12).
--- Modified the content in Table 35, and changed the "user to master device" in lines 3, 4, 6, and 7 to "master device"
P09 change user report request detected "" Master device detected P10 change user report request "" Master device detected P09
"Change user report request" "The master device detected a P10 change user report request" to make the description of the expected results in Table 35 clearer
(See 5.6.3.3).
--- Modified the content of Table 42 and changed the "Check about sink time monitoring status of node P11" on line 4 (checkaboutsinktime
supervisionofnodeP11) "is modified to" the process data polling sent to P11 has no response, corresponding to the sink end of the P11 node
The port refresh monitoring bit is 1 ”, and the“ check about the sink time monitoring status of node P10 ”(checkaboutsinktime
supervisionofnodeP10) "is modified to" the process data polling sent to P10 has no response, corresponding to the sink end of the P10 node
The port refresh monitoring bit is 1 ”to make the description of the expected results in Table 42 clearer (see 5.6.3.10).
--- Added the content of Table 45, Step 2, Step 4, Step 6, Step 8, Step 11, Step 13, Step 15, Step 17 were added
Add "Set P01 as weak master", "Set P32 as weak master", "Set P10 as weak master", "Set P32 as weak master", "Set P01 as weak master"
"Main" "Set P32 as weak main" "Set P10 as weak main" "Set P32 as weak main". Because according to IEC 61375-2-2.
In the.2012 step operation, there will be two network couplings with a strong master in step 5, step 9, step 14 and step 18 respectively
In the combined situation, it is expected that the two networks will not couple (see 5.6.3.12).
--- Added the operations in steps 4 and 5 in Table 49 to ensure that P10 is the master device in step 6 (see 5.6.3.16).
--- Deleted the relevant description of PICS form in 7.2, because the relevant PICS expression has been carried out in Chapter 5 (see
7.2 of IEC 61375-2-2..2012).
--- The following description has been added to the "Test of Marshalling Node Type 'Strong Master'". WTB cables (including A and B wires) will be used
Group 1 is connected to tester direction 1 (see 7.3.3.2.3).
--- "The pulse sequence of about 50 μs should be observed every (25.0 ± 4.0) ms on the WTBA line and the B line [Pulsese-
quencesofapproximately50μsevery25ms (withatoleranceof ± 4.0ms) shalbeseenon
theWTBlinesAandB.] "is modified to" It should be observed that about every (50.0 ± 4.0) ms on the WTBA and B lines
There is a pulse sequence of 50 μs. "Because the WTB bus master sends to the end nodes in direction 1 and direction 2 every 25ms
There is a request frame.After receiving the presence request frame, the end node sends a detection request frame on its auxiliary channel.
For a single end node, the detection request frame transmission period should be 50ms (see 7.3.3.2.2, 7.3.3.2.3, 7.3.3.2.4).
This section also made the following editorial changes.
--- Removed acronyms not used in this section (see Chapter 3);
--- Modify Note 1 and Note 2 in 5.6.2.11 to Table 28;
--- Modify GB/T 28029.2-2020 4.4.2 to 4.3.2 (see 7.2.2.3);
--- Modify all "1 end" in the test instrument connected as follows to "2 end" (see 7.3.2.4);
--- Modify IEC 61375-2-2..2012, 5.1.2.6, Table 11, line 1 4.1.4 ~ 2.1.5 to "4.2.4, 4.2.5", because
IEC 61375-2-2..2012 is wrong (see 5.3.6);
--- Modify 2.2.4.3 in 5.1.5.1.1 of IEC 61375-2-2..2012 to 4.3.4.3, because IEC 61375-2-2..2012 is wrong
(See 5.6.1.1);
--- Modify the output signal value 0.300V to 3.000V, because IEC 61375-2-2..2012 is wrong (see 5.6.1.6.2.4);
--- Modify "P11" on the 6th line of Table 39 to "P09", because IEC 61375-2-2..2012 is wrong (see 5.6.3.7)
--- Modify "2.6.3.3 ~ 2.6.3.6" to "4.7.3.3 ~ 4.7.3.6" because IEC 61375-2-2..2012 is wrong (see 7.3.3.3);
--- Added table questions;
--- Adjusted the sequence of table 55 and table 57 (see 7.2.2.2 and 7.2.2.4);
--- Adjusted some column numbers (see 4.1, 4.2.2, 4.3.2.2, 4.3.3.2, 4.4.2, 5.6.1.3.1, 5.6.1.6.2.4, 5.6.1.6.2.5,
5.6.1.6.3, 5.6.1.6.4, 5.6.2.2, B.1.1, B.1.2).
Please note that some content of this document may involve patents. The issuer of this document does not assume responsibility for identifying these patents.
This part is proposed by the State Railway Administration.
This part is under the jurisdiction of the National Technical Committee for Standardization of Traction Electrical Equipment and Systems (SAC/TC278).
This section was drafted by. CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd., China Railway Science Research Institute Group Co., Ltd. rolling stock
Research Institute, CRRC Qingdao Sifang Vehicle Research Institute Co., Ltd., CRRC Dalian Electric Traction R & D Center Co., Ltd., CRRC Datong Electric Locomotive
Co., Ltd., CRRC Tangshan Locomotive Co., Ltd.
The main drafters of this section. Shen Hui, Zou Zhirong, Zhu Guangchao, Guo Rui, Pan Wenbo, Du Zhenhuan, Hu Zhipeng, Li Hui, Deng Heng.
The previous versions of the standard replaced by this part are as follows.
--- GB/T 28029.2-2011.
Introduction
The TCN train communication network standard is a national standard with the goal of defining interfaces to achieve.
a) Insert compatibility between devices located in different groups;
b) Insertion compatibility between equipment and devices located in the same group.
One of the key success factors for developing any technology is standardization and ensuring interoperability between different implementations. To facilitate interoperability, execute
Conduct consistency testing.
In this part of GB/T 28029, pay attention to the train
Line, other buses already foreseen in GB/T 28029 are not considered.
WTB provides two real-time protocols for communication services.
a) Process variable transmission, a distributed real-time database, periodically refreshed in a broadcast manner;
b) Message delivery, send in one of the following ways as needed.
● Unicast messages (point-to-point);
● Multicast messages.
WTB has a network management function, which allows debugging, trial operation and maintenance through the network.
This part is divided into 8 chapters and 3 appendices.
Table 1 lists these chapters and appendices and their brief descriptions.
Table 1 Document structure
Chapter and Appendix Description
1 Scope This chapter describes the scope of this part
2 Normative references This chapter lists normative references
3 Terms and definitions, abbreviations This chapter introduces basic terms and definitions, acronyms not introduced in GB/T 28029.2
4 Conformance test methods, requirements and boundaries
This chapter is an overview of TCN's verification methods, which can be used by developers and regulators.
This chapter also provides information about PICS and PIXIT
5 WTB node, backbone cable, jumper cable, extension cable
Conformance testing of cables
This chapter covers all tests on WTB, and according to these nodes and WTB itself and MVB
Relationship. The main contents are as follows.
--- WTBPICS and PIXIT;
--- WTB test procedure;
--- WTB testing process
6 RTP conformance testing This chapter lists the real-time protocol testing performed in Chapter 5
7 Conformance testing of WTB grouping
This chapter covers the physical layer, and the services provided by WTB nodes are included in the previous chapter.
Application specifications are provided by other organizations, such as the communication protocol GB/T 28029.4
8 Chapter 5 of the network management conformance test covers part of the content. The rest is not involved
Appendix A This part is compared with IEC 61375-2-2..2012
Structural changes
This appendix is informative
Appendix B Test Lab Responsibilities and Customer Responsibilities This appendix is a normative appendix
Appendix C Test Instruments and Special Test Benches This appendix is an informative appendix
Rail Transit Electronic Equipment Train Communication Network (TCN)
Part 2-2. Stranded Train Bus (WTB)
Conformance test
1 Scope
This part of GB/T 28029 specifies the conformance test methods, requirements and boundaries, WTB nodes, backbone cables, jumper cables and expansion
Conformance testing of cable, RTP conformance testing, WTB grouping conformance testing and network management conformance testing.
This part applies to all equipment and devices implemented according to GB/T 28029.2, this part covers the certification of these devices and devices
Consistent testing process.
This section is a prerequisite for further interoperability checks between different TCN implementations, and is applicable to the independent consistency of the TCN implementation itself
Sexual examination.
2 Normative references
The following documents are essential for the application of this document. For dated references, only the dated version applies to this article
Pieces. For the cited documents without date, the latest version (including all amendments) applies to this document.
GB/T 17178.1 Information Technology Open System Interconnection Conformance Testing Method and Framework Part 1. Basic Concepts
(GB/T 17178.1-1997, ISO /IEC 9646-1..1994, IDT)
GB/T 17178.7 Information Technology Open System Interconnection Conformance Test Method and Framework Part 7. Implement Conformance Statement
(GB/T 17178.7-2011, ISO /IEC 9646-7..1995, IDT)
GB/T 25119 Electronic device for rail transit rolling stock (GB/T 25119-2010, IEC 60571..2006, MOD)
GB/T 28029.2-2020 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 2-1. Stranded Train Bus
(WTB) (IEC 61375-2-1..2012, MOD)
GB/T 28029.4 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 2-3. TCN Communication Protocol
(GB/T 28029.4-2020, IEC 61375-2-3..2015, MOD)
IEC 60807 (all parts) Rectangular connectors for frequencies below 3MHz (Rectangular connectors forfrequencies)
below3MHz)
UIC556 Information transmission on the train bus [Informationtransmissioninthetrain (train-bus)]
3 Terms and definitions, abbreviations
3.1 Terms and definitions
The terms and definitions defined in GB/T 17178.1 and GB/T 28029.2 apply to this document.
3.2 Acronyms
The following abbreviations apply to this document.
BR. Bit rate (BitRate)
BT. Bit Time (BitTime)
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28029.3-2020_English be delivered?Answer: Upon your order, we will start to translate GB/T 28029.3-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 28029.3-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28029.3-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|