|
US$489.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 27875-2011: Technical requirements for project and heavy lift cargoes handling in port Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 27875-2011 | English | 489 |
Add to Cart
|
4 days [Need to translate]
|
Technical requirements for project and heavy lift cargoes handling in port
| Valid |
GB/T 27875-2011
|
Standard similar to GB/T 27875-2011 GB 16994.6 GB 16994.5 GB 16994.4
Basic data | Standard ID | GB/T 27875-2011 (GB/T27875-2011) | | Description (Translated English) | Technical requirements for project and heavy lift cargoes handling in port | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | R43 | | Classification of International Standard | 03.220.40 | | Word Count Estimation | 21,226 | | Date of Issue | 2011-12-30 | | Date of Implementation | 2012-06-01 | | Quoted Standard | GB/T 191; GB/T 1835; GB/T 6067; JT/T 557 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 23 of 2011 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the port of loading and unloading of major pieces of the basic requirements for stevedores attachment selection and use requirements, and handling technical requirements and methods of operation. This standard applies to the bulky and out of port terminals, growing a variety of goods and machinery spare parts, equipment and vehicles. |
GB/T 27875-2011: Technical requirements for project and heavy lift cargoes handling in port---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements for project and heavy lift cargoes handling in port
ICS 03.220.40
R43
National Standards of People's Republic of China
Heavy loading and unloading port Technical requirements
Issued on. 2011-12-30
2012-06-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Basic requirements 1
Selecting and using 5 stevedores attachment of claim 2
6 handling technical requirements and methods of operation 5
Calculation Appendix A (informative) sling length 15
Annex B (informative) Calculation specifications sling 16
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard is proposed and managed by the Ministry of Transport.
This standard was drafted. Shanghai International Port (Group) Co., Ltd.
The main drafters of this standard. Bao Qifan, Luo Wenbin, Zhu Zufu, Wenjun, Shun Ling, Liao ago.
Heavy loading and unloading port Technical requirements
1 Scope
This standard specifies the basic requirements for major pieces of port loading and unloading, selection and use requirements stevedores attachments, as well as handling the technical requirements
And methods of operation.
This standard applies to bulky and out of ports, growing parts of cargo and machinery, equipment and vehicles.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 191 Packaging - Pictorial signs
GB/T 1835 Series 1 container corner fittings
GB/T 6067 crane safety regulations
JT/T 557 port handling area lighting illuminance and its measurement
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Heavy projectandheavyliftcargo
Heavy, growing parts of goods and all kinds of machinery, equipment and vehicles.
3.2
Bracket liftingspreader
For the major pieces when lifting sling to maintain a certain status, for vertical, horizontal or vertical and horizontal support a variety of structures.
3.3
Lifting balancing device liftingbalanceset
Adjusting and maintaining balance when lifting major pieces of various mechanical devices.
4 Basic requirements
4.1 in the loading and unloading of the major pieces of their division of labor personnel shall receive appropriate professional and technical training, and passing the examination.
4.2 According to the characteristics of the major pieces of loading and unloading, the operating environment should meet the following requirements.
a) loading and unloading operations in the region, the lighting illuminance shall comply with JT/T 557 requirements;
B) When wind speed is greater than 12m/s, should stop using the floating crane lifted a major piece work; wind speed greater than 15m/s, the weight should be stopped
Large lifting operations;
c) marked with signs of major pieces of moisture, rain and snow should stop at the open-air operations;
d) should be based on the actual situation of major pieces, equipped with appropriate fire safety facilities.
4.3 Before the job, you should understand the handling handling characteristics of major pieces and do the following.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 27875-2011_English be delivered?Answer: Upon your order, we will start to translate GB/T 27875-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 27875-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 27875-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|