HOME   Cart(12)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 19905-2017 English PDF

US$999.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 19905-2017: Road tanker for liquefied gas
Status: Valid

GB/T 19905: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 19905-2017English999 Add to Cart 7 days [Need to translate] Road tanker for liquefied gas Valid GB/T 19905-2017
GB/T 19905-2005EnglishRFQ ASK 7 days [Need to translate] Liquefied gas tanker Obsolete GB/T 19905-2005

PDF similar to GB/T 19905-2017


Standard similar to GB/T 19905-2017

QC/T 911   NB/T 10354   GB 20300   GB 18564.1   

Basic data

Standard ID GB/T 19905-2017 (GB/T19905-2017)
Description (Translated English) Road tanker for liquefied gas
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard T59
Classification of International Standard 43.080.10
Word Count Estimation 50,584
Date of Issue 2017-10-14
Date of Implementation 2018-05-01
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 19905-2017: Road tanker for liquefied gas

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Road tanker for liquefied gas ICS 43.080.10 T59 National Standards of People's Republic of China Replacing GB/T 19905-2005 Liquefied gas tank car 2017-10-14 Published 2018-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 3 4 Qualifications and Responsibilities 4 5 material 5 6 design 8 7 Safety Accessories, Gauges and Handling Attachments 19 8 manufacturing 22 Test method Inspection rules 37 11 logo mark 39 12 factory documents 39 13 Storage and transportation 40 Appendix A (Normative) Risk Assessment Report 41 Appendix B (Normative) Tank safe discharge and safety relief device discharge capacity calculation 42

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard replaces GB/T 19905-2005 "liquefied gas transporter." This standard compared with GB/T 19905-2005, in addition to editorial The main technical changes outside the amendment are as follows. --- Modify the standard range (see Chapter 1,.2005 edition Chapter 1); --- Removed the working pressure, design pressure and other six terms, and added four terms liquefied gas (see Chapter 3,.2005 Version of Chapter 3); --- Modify the chapter title, and increased the user or the design commissioner's responsibility to modify the design and manufacturing units of the qualification and post Responsibility requirements (see Chapter 4, see Chapter 4 of the.2005 edition); --- Modify the tank with steel, steel forgings, steel and pipe fittings, stacking insulation materials, welding materials, and other requirements, and increased sealing material (See 5.2, 5.3, 5.4.6, see.2005 edition 5.2 ~ 5.5); --- Modify the vehicle, load, design temperature, design pressure, the maximum allowable filling capacity and other requirements, and an increase of analysis and design methods, the most Low Design Metal Temperature, Minimum Tank Thickness, Dimethyl Ether Medium and Leakage Tests (see Chapter 6,.2005 Edition Chapter 6); --- Modify the requirements of safety accessories, instruments and handling attachments (see Chapter 7, see Chapter 7 of.2005 edition); --- Modify the welding joint classification, material re-inspection, hot and cold processing, assembly, welding, non-destructive testing, heat treatment and other requirements, an increase of Class E Welded joints (see 8.1 ~ 8.4, see the.2005 edition of 8.2,8.3); --- Increasing ammonia leak test, halogen leak test and helium leak test methods (see 9.2.3); --- Added "risk assessment report" (see Appendix A); --- Removed the "format and content of the product nameplate" "product quality certificate format and content" (see Year.2005, Appendix B, with C); --- "Design and calculation of safety relief devices" should read "Calculation of safe discharge capacity of tanks and discharge capacity of safety relief devices" and amend The requirements for safe discharge of tank body and discharge capacity of safety relief device (see Appendix B, see Appendix A of.2005 Edition). This standard is proposed and managed by the National Boiler and Pressure Vessel Standardization Technical Committee (SAC/TC262). This standard drafting unit. Jingmen ambitious Special Aircraft Manufacturing Co., Ltd., Shanghai Gas Industry Association, China Special Equipment Testing Research Institute, built in Guangdong Machinery Co., Ltd., Shanghai Huayi Group Equipment Engineering Co., Ltd., Shanghai Hua Li Safety Equipment Co., Ltd., Nantong CIMC Energy Equipment Co., Ltd., Shijiazhuang Enric Gas Machinery Co., Ltd., Aerospace Chenguang Co., Ltd., Shanghai Special Equipment Supervision Inspection Inspection Institute, Wuhan Zhongzheng Chemical Equipment Co., Ltd., Tieling Huanghai Special Purpose Vehicle Manufacturing Co., Ltd. The main drafters of this standard.Xiao Xuewen, Zhou Weiming, Yu Bojian, Wei Yongbiao, Sun Taiping, Chen Zhaohui, Shoubi South, Xie Tiejun, Wu Quanlong, Jiang Pingan, Wang Fang, Wang Hongxia, Luo Xiaoming, Wang Jiaqun, Zhao Dexiang. This standard replaces the standards previously issued as. --- GB/T 19905-2005.

Introduction

Standard Declaration of Conformity and Revision The development of this standard complies with the basic safety technical requirements stipulated by the state's promulgated pressure vessel safety regulations. The design criteria, materials Requirements, manufacturing inspection technical requirements and acceptance criteria in line with the provisions of TSGR0005. This standard is to coordinate standards, that is, according to this standard Liquefied gas tank car to meet the basic TSGR0005 safety requirements. The standard revision uses a proposal review system. Any unit or individual has the right to make suggestions on the revision of this standard, and the revision proposal adopts "standard Quasi-proposal/questionnaire "submitted to the National Boiler and Pressure Vessel Standardization Technical Committee (hereinafter referred to as the Commission.) Commission on the subject received Quasi-revised proposal review, according to the review results will be included in the technical content of the next version of the standard. Standard Proposal/Questionnaire Table No. □ standard proposal □ standard inquiry standard name Name of the unit Contact address Postal code Phone/Fax E-mail Proposal/Inquiry contents (can be attached to the page) Technical basis and related information (can be attached page) Additional information. Official seal or proposal (inquiry) person signature. Date of submission. year month day National boiler pressure vessel standardization technical committee Address. Heping Street, Chaoyang District, Beijing Xiyuan 2, Block D, third floor, zip code E-mail .GB [email protected] Liquefied gas tank car

1 Scope

1.1 This standard specifies the liquefied gas vehicle tanker (hereinafter referred to tanker) materials, design, manufacture, test methods, inspection rules, marking Knowledge, factory documents, storage and transportation requirements. 1.2 This standard applies to the design pressure of steel tanks is not less than 0.1MPa, the volume of not less than 1m3, and stereotypes chassis or semi-trailer line Walk the body permanently connected tanker. 1.3 This standard does not apply to the following range of tankers. a) The tank material is non-ferrous or non-metallic; b) the tank is a vacuum insulation structure; c) There are special requirements for the national defense and military equipment. 1.4 The scope of this standard tanker tank, including piping, safety accessories, instruments, loading and unloading annex, as well as stereotypes chassis or semi-trailer walking machine Structure, bearings, operating boxes and so on. 1.5 tank body defined as follows. a) the groove face of the first circumferential joint of the tank body and the pipeline welded and connected; b) The first threaded joint end face of the tank body, pipeline and safety accessory thread, the first flange sealing face of flange connection; c) End caps, end plugs and fasteners of the open part of the tank; d) Weld connection between tank and non-pressured element. 1.6 The main pressure components, including the cylinder, head and the nominal diameter of not less than 50mm (pressure), flange, flange, flange cover Board and so on. 1.7 pipeline includes all connected with the tank and pipe fittings.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. Pressure vessels Part 1 GB/T 150.1 General requirements GB/T 150.2 Pressure vessels Part 2. Materials Pressure vessels Part 3 GB/T 150.3 Design Pressure vessels - Part 4. Manufacture, inspection and acceptance GB/T 196 ordinary thread basic size GB/T 197 ordinary thread tolerances GB/T 567.1 bursting disc safety device - Part 1. Basic requirements GB/T 567.2 Bursting disc safety devices - Part 2. Application, selection and installation GB/T 567.3 bursting disc safety device Part 3 Classification and installation dimensions GB/T 713 boiler and pressure vessel steel GB 1589 automobile, trailer and car train outer dimensions, axle load and quality limits GB/T 1804-2000 General tolerances Tolerances for linear and angular dimensions without tolerance GB/T 3531 low temperature pressure vessel steel

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 19905-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 19905-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 19905-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 19905-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 19905-2017?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 19905-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.