|
US$399.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 19760.2-2008: CC-Link (Control and communication Link) specifications -- Part 2: CC-Link implementation Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 19760.2-2008 | English | 399 |
Add to Cart
|
3 days [Need to translate]
|
CC-Link (Control and communication Link) specifications -- Part 2: CC-Link implementation
| Valid |
GB/T 19760.2-2008
|
PDF similar to GB/T 19760.2-2008
Basic data | Standard ID | GB/T 19760.2-2008 (GB/T19760.2-2008) | | Description (Translated English) | CC-Link (Control and communication Link) specifications -- Part 2: CC-Link implementation | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N10 | | Classification of International Standard | 25.040 | | Word Count Estimation | 17,145 | | Date of Issue | 2008-12-15 | | Date of Implementation | 2009-06-01 | | Older Standard (superseded by this standard) | GB/Z 19760-2005 | | Quoted Standard | GB/T 5271.1; GB/T 5271.5; GB/T 5271.8; GB/T 5271.9; GB/T 7421; GB/T 9387.1 | | Adopted Standard | BAP-05027-F, MOD | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 21 of 2008 (No. 134 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the CC-Link implementation. This section applies to automation and control. All this section labeled " essential" items must be installed in the developed CC-Link interface. |
GB/T 19760.2-2008: CC-Link (Control and communication Link) specifications -- Part 2: CC-Link implementation ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
CC-Link (Control
ICS 25.040
N10
National Standards of People's Republic of China
Partially replace GB /Z19760-2005
Posted 2008-12-15
2009-06-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 3 implementation requirements
4.1 Overview 3
4.2 Switch and LED 4
Recommended Component 8 4.3
4.4 connector 8
4.5 CC-Link-compatible device isolation method 9
4.6 CC-Link version identification and flag display 11
11 4.7 External connections
1 CC-Link Interface schematic block diagram of FIG point (Example) 4
RX When selecting I/O capacity of 32 fixed mode of Figure 2/RY system area 5
Figure 8 shows an example of 3 LED
Figure 4 CC-Link-compatible device isolation circuit example 10
5 Version 2 Trademark example 11
6 external connection example 12
Table 1 mode setting 4
Table 2 condition setting 5
Table 3 Station number 5 set
Table 4 transmission rate setting 6
Table 5 Monitoring with LED 6
Table 6 lists recommended components 8
Table 7 isolate traffic 8
Table 8 Recommended connector (terminal block) Products 9
Table 9 CC-Link version and Identification Presentation 11
Foreword
GB/T 19760 "CC-Link communication network control and specification" is currently divided into four parts.
--- The first part 1. CC-Link protocol specification;
Part --- Article 2. CC-Link realization;
Part --- Section 3. CC-Link profiles;
--- Part 4. CC-Link/LT protocol specification.
This section GB/T 19760 Part 2.
The partial modification of the use of CC-Link Association standards BAP-05027-F "CC-Link specification to achieve", its technical content and BAP-05027-F
Exactly the same.
GB/T 19760-2008 Compared with GB /Z19760-2005, on the technical contents have not been adjusted, the structure is divided into 4 portions
Points to meet the needs of different users used alone. This Part replaces GB /Z19760-2005 "control and communication bus CC-Link specifications"
The "CC-Link achieve" section.
For ease of use, this section made the following editorial changes.
a) According to China's actual use, in accordance with the provisions of GB/T 1.1-2000, the original text was revised editorial;
b) the original text references to other international standards have been adopted as identical or modified our standard, this part of the standard number used in place of
Corresponding international standard number, and the rest not equal or modify adopted as our standard of advanced international standards in this section are
Direct reference;
c) The description of individual editorial errors were corrected.
This part is proposed by China Machinery Industry Federation.
This part of the measurement and control of Standardization Technical Committee of the Fourth Technical Committee under the jurisdiction of the national industrial processes.
This section is drafted. Machinery Industrial Instrumentation Technology and Economy Institute, Tsinghua University, Northern Jiaotong University, China CC-Link
User organizations, Shanghai Automation Instrumentation Co., Ltd., Beijing Machinery Industry Automation Research Institute, Southwest University, Tianhua Chemical Machinery & Auto
Research and Design Institute, China National Offshore Oil Corporation, Jinan Railway Bureau, Zhuzhou CSR Times Electric Co., Ltd., Tongji University, Shanghai Instrument
Table Institute of Automation.
The main drafters of this section. Cheng Yuk, Xu Weihua, Dan, Wang Jinbiao, ginger golden, Qin Qiang, Gong Ming, Sun Xin, Wei-hua package, Liu M, Liu Feng,
Chen Jie, Wuwang Jun, Wang Yanchang, Wang Yumin, Mei Ke, Ouyang Jinsong, Yu Peng, Chen Qijun, Rong Zhilin, Song Guofeng.
1 Scope
This section provides the CC-Link implementation.
This section applies to automation and control. All this section labeled "essential" items must be installed in the development of CC-Link
Interface.
2 Normative references
The following documents contain provisions which, through reference GB/T 19760 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 5271.1 Information technology - Vocabulary - Part 1. Basic terminology (GB/T 5271.1-2000, eqv ISO /IEC 2382-
1.1993)
GB/T 5271.5 Information technology - Vocabulary - Part 5. Data Representation (GB/T 5271.5-2008, ISO 2382-5.1999,
IDT)
GB/T 5271.8 Information technology - Vocabulary - Part 8. Security (GB/T 5271.8-2001, idt ISO /IEC 2382-8.
1998)
GB/T 5271.9 Information technology - Vocabulary - Part 9. Data communication (GB/T 5271.9-2001, eqv ISO /IEC 2382-
9.1995)
Between GB/T 7421 Information technology - Telecommunications and information exchange between high-level data link control (HDLC) procedures
(GB/T 7421-2008, ISO /IEC 13239.2002, IDT)
GB/T 9387.1 Information technology - Open Systems Interconnection - Basic Reference Model - Part 1. Basic model (GB/T 9387.1-
1998, idt ISO /IEC 7498-1.1994)
EIARS-485 electrical performance standards and the generator receives balanced digital multipoint systems used in
3 Terms and Definitions
The following terms and definitions apply to this section.
3.1
It represents a bit of status information --- 0 (OFF) or 1 (ON).
3.2
Update periodically data communication method via CC-Link network.
3.3
A circular communication, in which communication by dividing a communication packet into a plurality of blocks of data transmitted to increase the size, so that the
Each logical loop station communication link maximum capacity to 128-bit and 64-word.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 19760.2-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 19760.2-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 19760.2-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19760.2-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|