|
US$1259.00 · In stock Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 19760.4-2008: CC-Link (Control and communication Link) specifications -- Part 4: CC-Link/LT specifications Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 19760.4-2008 | English | 1259 |
Add to Cart
|
8 days [Need to translate]
|
CC-Link (Control and communication Link) specifications -- Part 4: CC-Link/LT specifications
| Valid |
GB/T 19760.4-2008
|
PDF similar to GB/T 19760.4-2008
Basic data | Standard ID | GB/T 19760.4-2008 (GB/T19760.4-2008) | | Description (Translated English) | CC-Link (Control and communication Link) specifications -- Part 4: CC-Link/LT specifications | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N10 | | Classification of International Standard | 25.040 | | Word Count Estimation | 57,598 | | Date of Issue | 2008-12-15 | | Date of Implementation | 2009-06-01 | | Older Standard (superseded by this standard) | GB/Z 19760-2005 | | Adopted Standard | BAP-05031-F, MOD | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 21 of 2008 (No. 134 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies TCC-ILink/LT (Control & Communication Link/LT) protocol specification. Its network structure shown in Figure 1 (omitted) This section applies to automatic control collar city. |
GB/T 19760.4-2008: CC-Link (Control and communication Link) specifications -- Part 4: CC-Link/LT specifications ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
CC-Link (Control
ICS 25.040
N10
National Standards of People's Republic of China
Partially replace GB /Z19760-2005
Posted 2008-12-15
2009-06-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅴ
1 Scope 1
2 Normative references 1
3 Terms and definitions 2
4 CC-Link/LT System Overview 3
4.1 Configuration 3
Specifications 4 4.2
6 5 Protocol Overview
5.1 Communication Phase 6
5.2 Overview of operation 7
5.3 protocol configuration 10
6 Physical Layer 10
6.1 based on RS-485 interface 10
7 the data link layer 11
7.1 CC-Link/LT data link protocol entity 11
8 Application Layer 26
8.1 network management entity 26
8.2 Cyclic transmission entity 32
9 Installation instructions 36
9.1 switch and LED 36
38 9.2 Components used
9.3 CC-Link/LT compatible device power specifications 45
9.4 transmission medium 47
49 9.5 Power Adapter
1 factory automation network 1
Figure 2 estimates the value of the link scan time of 5
3 communication phase 6
Figure 4 initial transmission 7
5 7 refresh process
Figure 6 are linked restoration process 8
7 stop linking process 8
8 Stage 9 Jump
9 protocol configuration 10
Figure 10 Connection Configuration 10
11 Start Network/stop link 12
Figure 12 Send/Receive 13
13 master refresh operation 13
14 Slave refresh operation 14
15 data link establishing operation 14
16 16 Anomaly Detection
Figure 17 basic format 16
Baud rate synchronization test poll 18 sent by the master and stop linking test polling 18
Test polling stations collect information sent by the master station 19 18
Figure 20 Station information collection response sent from station 19
Station status information 21 from the master station test polling 19
Refresh the data issued by the master station 22 20
Response data from 23 stations (refresh) 21
Timing Diagram Figure 24 (a) 22
Figure 25 timing diagram (2) 23
26 slot 24
27 initialization process 31
Figure 28 Recovery process 31
Figure 29 stops link processing 32
30 transmission cycle 35
Figure 38 shows an example of 31 LED
32 examples of the interface circuit 39
Cable cross-section of FIG. 33 (dedicated flat cable) 48
Figure 34 screen (special flat cable) 48
Figure 35 Cable cross sections (VCTF cord and special cable movement) 49
Communication power 36 master power supply 50
Figure 37 power adapter Circuit Example 50
Table 1 4 Specification
Table 2, the maximum transmission distance of 4
Table 3 cable can be used in combination of 5
Table 4 maximum transmission distance of 11
Table 5 CC-Link/LT Data Link Protocol Service 11
Table 6 A1, A2 list 17
Table 7 lists the transmission frame interval 21
Table 8 transmission frame interval of 24
Table 9 lists 24 slots
Table 10 slots 24
Table 11 allowable time frequency variation list 25
Table 12 Frequency fluctuation allowable time 25
Table 13 lists the watchdog timer 25
Table 14 lists the timer settings 25
Table 15 lists the master exception handling 25
Table 16 lists 26 slaves exception handling
Table 17 lists 26 Network Management Services
Table 18 parameter information 26
Table 19 can control the number of points the final station number 27
Table 20 network status information 27
Table 21 reception state information 28
Table 22 slave state 28
Table 23 is transmitted from the station information 28
Table 24 Slave Information (Details) 29
Table 25 ST information 30
From the station information table 26 30
Table 27 Slave Information (Details) 30
Consistency check station information table 28 30
Table 29 Cyclic transmission services 32
Table 30 master loop data transmission services 33
Table 31 master cycle data reception service 33
Table 32 service stations from the transmission cycle data 34
Table 33 service stations from the received data cycle 34
Table setting switch 34 36
Table 35 monitor with LED 37
Table 36 Recommended components 38
Table 37 connector substrate 40
Table 38 Dedicated flat cable connector 41
Table 39 for private mobile cable (insulator outer diameter 1.8mm ~ 2.1mm) communication connector 42
Table 40 Communication connector for VCTF cords and private mobile cable (insulator outer diameter 2.1mm ~ 2.4mm) 43
Table 41 dedicated flat cable specification 47
Table 42 VCTF cord specifications 48
Table 43 Private Mobile Cable specification 49
Table 44 power adapter 49
Foreword
GB/T 19760 "CC-Link communication network control and regulate" series is currently divided into four parts.
--- The first part 1. CC-Link protocol specification;
Part --- Article 2. CC-Link realization;
Part --- Section 3. CC-Link profiles;
--- Part 4. CC-Link/LT protocol specification.
This section GB/T Part of 419,760.
The partial modification of the use of CC-Link Association standards BAP-05031-F "CC-Link/LT protocol specification", its technical content and BAP-
Exactly 05031-F.
GB/T 19760-2008 Compared with GB /Z19760-2005, on the technical contents have not been adjusted, the structure is divided into 4 portions
Points to meet the needs of different users used alone. This Part replaces GB /Z19760-2005 "control and communication bus CC-Link specifications"
The "CC-Link/LT Protocol Specification" section.
For ease of use, this section made the following editorial changes.
a) According to China's actual use, in accordance with the provisions of GB/T 1.1-2000, the original text was revised editorial, technical
Exactly the same operation content;
b) the original text references to other international standards have been adopted as identical or modified our standard, this part of the standard number used in place of
Corresponding international standard number, and the rest not equal or modify adopted as our standard of advanced international standards in this section are
Direct reference;
c) The description of individual editorial errors were corrected.
This part is proposed by China Machinery Industry Federation.
This part of the measurement and control of Standardization Technical Committee of the Fourth Technical Committee under the jurisdiction of the national industrial processes.
This section is drafted. Machinery Industrial Instrumentation Technology and Economy Institute, China CC-Link user organizations, large Beijing Traffic
Science, Tsinghua University, Shanghai Automation Instrumentation Co., Ltd., Beijing Machinery Industry Automation Research Institute, Southwest University of Tianhua
Machinery and Automation Research and Design Institute, China National Offshore Oil Corporation, Jinan Railway Bureau, Zhuzhou CSR Times Electric Co., Ltd., Tongji
University, Shanghai Institute of Automation Instrumentation.
The main drafters of this section. Qin Qiang, Gong Ming, Cheng Yuk, Sun Xin, Wei-hua package, Wang Jinbiao, Liu M, Liu Feng, ginger golden, Xu Weihua, Chen Jie,
Wuwang Jun, Wang Yanchang, Wang Yumin, Mei Ke, Ouyang Jinsong, Rong Zhilin, Song Guofeng, Yu Peng, Chen Qijun.
This part of the standard replaces the previous editions are.
--- GB /Z19760-2005.
1 Scope
GB/T 19760 provisions of this part of the CC-Link/LT (Control & CommunicationLink/LT) protocol specification. Its network
Network structure shown in Figure 1.
This section applies to automation and control.
1 factory automation network structure
2 Normative references
The following documents contain provisions which, through reference GB/T 19760 in this section constitute provisions of this section. For dated reference documents
Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section
Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this
section.
GB/T 5271.1 Information technology - Vocabulary - Part 1. Basic terminology (GB/T 5271.1-2000, eqv ISO /IEC 2382-
1.1993)
GB/T 5271.5 Information technology - Vocabulary - Part 5. Data Representation (GB/T 5271.5-2008, ISO 2382-5.1999,
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 19760.4-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 19760.4-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 19760.4-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19760.4-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|