|
US$1129.00 · In stock Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 19190-2013: Petroleum and natural gas industries -- Drilling and production hoisting equipment Status: Valid GB/T 19190: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 19190-2013 | English | 1129 |
Add to Cart
|
8 days [Need to translate]
|
Petroleum and natural gas industries -- Drilling and production hoisting equipment
| Valid |
GB/T 19190-2013
|
| GB/T 19190-2003 | English | RFQ |
ASK
|
5 days [Need to translate]
|
Petroleum and natural gas industries -- Drilling and production equipment -- Hoisting equipment
| Obsolete |
GB/T 19190-2003
|
PDF similar to GB/T 19190-2013
Basic data | Standard ID | GB/T 19190-2013 (GB/T19190-2013) | | Description (Translated English) | Petroleum and natural gas industries -- Drilling and production hoisting equipment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E92 | | Classification of International Standard | 75.180.10 | | Word Count Estimation | 51,541 | | Older Standard (superseded by this standard) | GB/T 19190-2003 | | Quoted Standard | ISO 15614-1; API SPEC 5B; API SPEC 5CT; API SPEC 7-1-2006; API SPEC 7-2-2008; API SPEC 7K; API RP 9B; ASME B31.3; ASME BPVC-2010; ASME A370; ASME A388; ASME A770; ASME E4; ASME E125; ASME E165; ASME E280; ASME E428; ASME E446; ASME E709; ASME SNT-TC-1A; A | | Regulation (derived from) | National Standards Bulletin 2013 No. 27 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the requirements applicable to the design of drilling and production operations to improve equipment design, manufacturing and testing. This standard applies to the following drilling and production hoisting equipment: a) enhance t |
GB/T 19190-2013: Petroleum and natural gas industries -- Drilling and production hoisting equipment ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Petroleum and natural gas industries. Drilling and production hoisting equipment
ICS 75.180.10
E92
National Standards of People's Republic of China
Replacing GB/T 19190-2003
Oil and Gas Industry
Drilling and production equipment
Issued on. 2013-12-31
2014-10-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅴ
1 Scope 1
2 Normative references 1
3 Terms, Definitions and Acronyms 3
3.1 Terms and definitions 3
3.2 Abbreviations 4
4 Design 5
4.1 General 5
4.2 Design of Condition 5
4.3 Strength Analysis 5
4.4 specification grade 7
4.5 radius of the contact surface 8
4.6 8 ratings
4.7 design safety factor 8
4.8 Shear strength 8
Falling objects 8 4.9
4.10 special equipment 9
4.11 Design Document 9
5 Design Verification Test 9
5.1 General 9
5.2 Test product sampling 9
5.3 Test Procedure 9
5.4 determine the rated load 10
5.5 Design verification testing procedures and another method to determine the rating of 10
5.6 load test apparatus 11
5.7 11 design changes
5.8 Record 11
6 material requirements 11
6.1 General 11
6.2 Written specifications 11
6.3 Mechanical properties 11
6.4 Evaluation of Materials 12
13 6.5 Manufacturing
15 6.6 Chemical composition
7 Welding requirements 15
7.1 Overview 15
7.2 Evaluation of welding 15
7.3 15 written documents
16 7.4 Management of welding materials
7.5 16 weld properties
7.6 PWHT 16
7.7 welding seam 16
7.8 Welding 16
8 17 Quality Control
8.1 General 17
8.2 Quality control personnel qualification 17
8.3 Test Equipment 17
8.4 Quality control specific devices and components 17
21 8.5 Dimensional inspection
8.6 Proof Load Test 21
8.7 Hydrostatic Testing 22
8.8 Function test 22
8.9 the confirmation process 22
9 Equipment 23
9.1 General 23
9.2 lifting tackle 23
Traveling 24 9.3
9.4 Traveling with the hook of the connecting member 28
9.5 connectors, rings and drill pipe elevators lug 28
9.6 Drilling hook 28
9.7 28 rings
Elevators 28 9.8
9.9 faucet 30
Power swivel 33 9.10
9.11 short section 33 power
9.12 33 deadline anchors
9.13 drillstring motion compensator 34
9.14 34 pressure vessels and pipelines
9.15 Rolling 34
9.16 for enhancing security device slips 34
9.17 AGV 34
10 36 Flag
36 10.1 Product Mark
36 10.2 Rating Symbol
10.3 combined device mark 36
10.4 Traceability member 37
10.5 factory number 37
Methods 37 10.6 mark
11 File 37
11.1 General 37
11.2 save files required by the manufacturer 37
11.3 Equipment carrying random file 38
Appendix A (normative) Additional requirements 39
Assessment Annex B (informative) heat treatment equipment 41
Annex C (informative) rotary shouldered rating formula (US units) connected 43
Annex D (informative) The standard international documents and normative references files of foreign advanced file
Consistency correspondence 44
References 45
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard replaces GB/T 19190-2003 "Petroleum and natural gas industries - Drilling and production equipment", and GB/T 19190-2003
The main technical changes are as follows.
--- Added "the same design principle" of terms and definitions (see 3.1.7);
--- To increase the "specifications" of terms and definitions (see 3.1.19);
--- Added "rotary shouldered connection" content (see 4.3.8);
--- Added "falling objects" content (see 4.9);
--- Design verification test load calculation, an increase by the size of the rated load is calculated content (see 5.3.2.2);
--- Material assessment, increasing the content sampling methods forging material under special circumstances (see 6.4.6);
--- Added "the confirmation process" content (see 8.9);
--- Tables 6 and 7, and a greater rated load specifications, the contents of Tables 8 and 9 have been adjusted;
--- Increased requirements, test requirements for primary elevator and hanging Kaka Wa carrier material, an increase of slip type elevator adjustment ring Acceptance
Requirements, and other requirements (see 9.8.3.4, see 9.8.3.6);
--- The previous edition Appendix B "AGV" elements into the body (see 9.17);
--- Add "stress relieving after reaming additional requirements" (see A.7);
--- Increase the informative Appendix C "is calculated rotary shouldered connection rating American units";
--- Increase the informative Appendix D "consistency of international documents and foreign advanced standards in this document and normative references of documents
Correspondence. "
This standard uses APISpec8C.2012 (Fifth Edition) "Drilling and Production Hoisting Equipment (PSL1 and PSL2)".
This standard by the national oil drilling equipment and tools for Standardization Technical Committee (SAC/TC96) and focal points.
This standard was drafted. Oil and Gas Drilling Equipment Engineering Technology Research Center, Lanzhou Shi Guomin Well Petroleum Engineering Ltd., Jiangsu
Such as Su Shi Machinery Co., Nanyang PETRO-MACHINERY (Group) Co., Ltd., Baoji Petroleum Machinery Co., Ltd., China National Petroleum Corporation
Drilling Engineering Technology Research Institute Jianghan Machinery Research Institute, Beijing Petroleum Machinery Factory.
The main drafters of this standard. Liu Hongfang, Po Chun Yung, Sun Juan, Yang Yugang, Liu Hongliang, Wei hole before, Dong-hui, Chen Jie, Yin Yugang, Duke,
Xie Hongfeng.
This standard was first released in June 2003, this is the first revision.
Oil and Gas Industry
Drilling and production equipment
1 Scope
This standard specifies requirements for the design of drilling and production operations applicable lifting equipment, manufacturing and testing.
This standard applies to the following Drilling and production equipment.
a) lifting tackle;
b) travel and car travel Hook;
c) traveling with the hook of the connecting member;
d) and joining the ears;
e) drilling hook;
f) tubing and sucker rod hook;
g) rings;
h) casing, tubing, drill pipe and drill collar elevator;
i) sucker rod elevators;
j) rotary swivel bail connector;
k) rotating faucet;
l) power swivel;
m) Dynamic short section;
n) chuck (when used as elevators);
o) deadline anchors;
p) the motion compensator drill string;
q) is used as lifting equipment kelly spinner;
r) is mounted on the lifting equipment pressure vessels and pipelines;
s) Safety slips (available when the lifting device);
t) swimming equipment (such as travel, hook, etc.) of the AGV.
This standard two product specification level (PSLs) requirements. Both PSL Code provides for different levels of technical requirements.
Unless otherwise indicated as PSL2, otherwise, all the requirements of Chapter 4 ~ Chapter 11 are applicable to the PSL1. Including all the PSL1 PSL2
Additional requirements and practices specified in this standard.
Additional requirements for use only when prescribed. Appendix A gives some additional regulatory requirements.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
Metallic materials ISO 15614-1 Specification and qualification of welding procedure Welding procedure test - Part 1. Arc and gas welding of steels and Ni
And nickel alloys arc welding (Specificationandqualificationofweldingproceduresformetalicmaterials-Weld-
ingproceduretest-Part 1. Arcandgasweldingofsteelsandarcweldingofnickelandnickelaloys)
APISpec5B casing, tubing and line pipe threads, measuring and testing (Threading, gauging, andthreadin-
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 19190-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 19190-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 19190-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19190-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 19190-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 19190-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|