HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 18595-2014 English PDF

US$274.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 18595-2014: Equipment for general lighting purposes -- EMC immunity requirements
Status: Valid

GB/T 18595: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 18595-2014English274 Add to Cart 3 days [Need to translate] Equipment for general lighting purposes -- EMC immunity requirements Valid GB/T 18595-2014
GB/T 18595-2001English479 Add to Cart 3 days [Need to translate] For general lighting purposes -- EMC immunity requirements Obsolete GB/T 18595-2001

PDF similar to GB/T 18595-2014


Standard similar to GB/T 18595-2014

GB/T 18655   GB/T 18655   GB/T 18039.4   GB/T 37150   GB/Z 17624.8   

Basic data

Standard ID GB/T 18595-2014 (GB/T18595-2014)
Description (Translated English) Equipment for general lighting purposes -- EMC immunity requirements
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard L06
Classification of International Standard 29.140
Word Count Estimation 14,14
Date of Issue 12/12/2014
Date of Implementation 6/1/2015
Older Standard (superseded by this standard) GB/T 18595-2001
Quoted Standard GB/T 17626.4-2008; GB/T 17626.5-2008; GB/T 17626.11-2008; GB/T 4365-2003; GB/T 2900.65-2004; GB 7000.1-2007; IEC 60598-1-2008; GB 7000.2- 2008; GB/T 17626.2-2006; IEC 61000-4-2-2008; GB/T 17626.3-2006; IEC 61000-4-3-2006; GB/T 17626.6-2008; IEC 61000-4-6-
Adopted Standard IEC 61547-2009, IDT
Regulation (derived from) National Standards Bulletin 2014 No. 30
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard applies to lamps and related equipment, such as a low voltage power supply or battery-powered lamps, accessories and lighting.

GB/T 18595-2014: Equipment for general lighting purposes -- EMC immunity requirements

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Equipment for general lighting purposes - EMC immunity requirements ICS 29.020; 29.140; 33.100.10 L06 National Standards of People's Republic of China Replacing GB/T 18595-2001 Equipment for general lighting purposes EMC immunity requirements (IEC 61547.2009, IDT) Issued on. 2014-12-22 2015-06-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 2 4 Performance Level 2 5 3 Test Requirements 5.1 Overview 3 5.2 Electrostatic Discharge 3 5.3 RF electromagnetic field 4 5.4 power frequency magnetic field 4 5.5 fast transients 4 5.6 injection current (radio frequency common mode) 5 5.7 Surge 6 5.8 Voltage dips and short interruptions 6 5.9 voltage fluctuation 7 6 Application of test requirements 7 6.1 Overview 7 6.2 Non-electrical lighting equipment 7 6.3 Electrical lighting equipment 7 8 7 Test conditions 8 Conformity Assessment 8 1 Port Legend 2 Table 1 test levels Electrostatic Discharge Port 4 --- cabinet Table 2 Test level radiofrequency electromagnetic fields --- cabinet port 4 Table 3 test levels frequency magnetic field --- cabinet port 4 Table 4 --- fast transient signal/control port test level 4 Test levels in Table 5 Fast Transient --- DC power input/output port 5 Fast transient test levels Table 6 --- AC power input/output port 5 Table 7 --- RF common mode signal/control port test level 5 Table 8 RF common mode --- test level DC power input/output ports 5 Test levels Table 9 RF common mode --- AC power input/output port 6 Table 10 test levels surge --- AC power input port 6 Table 11 Voltage dips --- AC power input port test level 6 Table 12 voltage short interruptions --- AC power input port test level 6 Table 13 Self-ballasted lamp test requirements 7 Table 14 stand-alone test requirements in Annex 7 Table 15 lamps 8 test requirements

Foreword

This standard was drafted in accordance with the rules of GB/T 1.1-2009 and GB/T 20000.2-2009 given. This standard replaces GB/T 18595-2001 "general lighting equipment electromagnetic compatibility immunity requirements" and GB/T 18595-2001 Compared to the main technical changes are as follows. --- Remove the IEC foreword (see Version 2001 IEC foreword); --- Range "This standard applies to" modify "the present standards on electromagnetic immunity requirements apply to", "aids" to "attached Member "(see Chapter 1, Chapter 1, 2001 edition); --- Range will be "video display devices" to "multimedia device" (see Chapter 1, Chapter 1, 2001 edition); --- The "shall comply with the requirements of this standard" to "shall comply with the standard requirements for electromagnetic immunity" (see Chapter 1, 2001 Edition Chapter 1); --- Deleted the "standards and the corresponding basic standards and (or product standards used together)" (see Chapter 1, 2001 edition); --- Normative references corresponding to IEC standards cited GB developing and updating the status (see Chapter 2, 2001 Edition chapter 2); --- Order and generic EMC standards consistent with the definition of chassis port removed in Figure 1 ground port; the GB/T 18595- 2001 Figure 1 notes to text under 5.1 Overview (see Version 3.2,5.1,2001 3.2,5.1); --- Impact on the life of the light source, to test the impact on the life of the device (see 4.4,2001 Version 4.4); --- The equipment immunity 360 claims involved "RF and power-related interference" with "power-related harassment" (see 5.1, 2001 version 5.1); --- Electrostatic discharge test voltage by the "8kV, 4kV" becomes "± 8kV, ± 4kV" (see 5.2,2001 Version 5.2); --- Fast transient, positive and negative pulse into a group consisting of a minimum of 2min 2min; signal/control port, and DC power output/input Test voltage port by "0.5kV (peak)" to "± 0.5kV (peak)"; AC output/input electrical test port Pressure by the "1kV (peak)" to "± 1kV (peak)" (see 5.5,2001 Version 5.5); --- Injection current, updated CDN name; signal/control and test port AC power input/output port test, scope of application Surrounded by "only applies to the total length of the cable connected thereto (according to the manufacturer's instructions) over 1m interface" to "apply only to Cable length connected to it (according to the manufacturer's instructions) over 3m Interface "(see 5.6,2001 Version 5.6); --- Surge, provides a lower level does not need to test; only peak measurements, remove the zero crossing of the AC voltage measurement requirements; test Voltage from "" to "±"; request for additional comment on the lower level (see 5.7,2001 Version 5.7); --- 5.8 title was changed to "voltage dips and short interruptions," clarifies the zero crossing of the voltage level change (see 5.8,2001 Version 5.8); Range --- test requirements apply increased half-lamps (see 6.1); --- Freestanding annex, Table 14 is simplified because most independent type attachment has the same performance indicators (see 6.3.3, 2001 Version 6.3.2); --- Lamps, Table 15 is simplified because most luminaires have identical performance; Fixed gas discharge lamp electronic town Lamp current injection current level of performance from B to A; In addition, to meet the requirements of GB 7000.2 and used for high-risk work Emergency lighting district levels of performance to be updated (see version 6.3.4,2001 6.3.3); --- Test conditions, the provisions of the supply voltage and the frequency of testing; deleted actuating means working conditions "under consideration"; to shrink Short time immunity test for equipment with a dimmer, from respectively at three light output levels to test only 50% ± 10% of the light output level of testing (see Chapter 7, Chapter 7 2001 version). This standard uses the translation method identical with IEC 61547.2009 "general lighting equipment electromagnetic compatibility immunity requirements." Correspondence between the consistency of the standards of international documents and normative references of the following documents. --- GB/T 4365-2003 Electrotechnical terminology Electromagnetic compatibility [IEC 60050 (161).1990, IDT] --- GB/T 2900.65-2004 Electrotechnical terminology lighting (IEC 60050-845. 1987, MOD) --- GB 7000.1-2007 lamps - Part 1. General requirements and tests (IEC 60598-1.2003, IDT) --- GB 7000.2-2008 Luminaires - Part 2-22. Particular requirements for emergency lighting (IEC 60598-2-22.2002, IDT) --- GB/T 17626.2-2006 Electromagnetic compatibility - Testing and measurement techniques - Electrostatic discharge immunity test (IEC 61000-4-2. 2001, IDT) --- GB/T 17626.3-2006 Electromagnetic compatibility - Testing and measurement techniques RFEMS test (IEC 61000-4-3.2002, IDT) --- GB/T 17626.6-2008 Electromagnetic compatibility - Testing and measurement techniques Immunity to conducted disturbances induced field (IEC 61000-4-6.2006, IDT) --- GB/T 17626.8-2006 Electromagnetic compatibility - Testing and measurement techniques - Power frequency magnetic field immunity test (IEC 61000-4-8. 2001, IDT) --- GB/T 17799.1-1999 Electromagnetic compatibility - Generic standards for residential, commercial and light industrial environment - Immunity (IEC 61000-6-1.1997, IDT) For ease of use, this standard made the following editorial changes. a) 'this International Standard' to replace the word 'this standard'; b) Remove IEC 61547.2009 Foreword. The standard proposed by China National Light Industry Council. This standard by the National Standardization Technical Committee of electrical lighting (SAC/TC224) centralized. This standard was drafted. China Quality Certification Center, Zhejiang Institute of Metrology, Hangzhou distance Optoelectronic Information Co., Ltd., Hui State NVC Lighting Technology Co., Ltd., Taizhou billion Ka Electronic Technology Co., Ltd, Shanghai Yaming Lighting Co., Ltd., Hangzhou Andhra Electronics Co., The company, Deqing County Metro Lighting Equipment Co., Ltd., Hangzhou Branch Photoelectric Co., Op Lighting Co., Ltd., Ningbo University, Hangzhou Austrian Lighting Appliance Co., Ltd., Zhejiang depth Optoelectronics Technology Co., Beijing Lighting Research Institute. The main drafters of this standard. Zheng Xuesheng, cover Min, Chen Zhiming, Li, PAN Jian root, Xiong Fei, Yang meritorious, Xu Xiaoliang, Wu Zhaozhao, Tsing Yi, Yan Qian Jun, Zhou Mingxing, Wang Pengjun, Yangguo Ren, Zhang Zhen, Jiang Shan, Duan Yan Fang, Zhao Xiurong. This standard was first released in 2001, this edition is the first revision. Equipment for general lighting purposes EMC immunity requirements

1 Scope

The standards for electromagnetic immunity requirements apply to lamps and related equipment, such as a low voltage power supply or battery-powered lamps, accessories and Lamps. This standard does not apply to other IEC or CISPR standards for immunity requirements already laid down the equipment, such as. --- Transport vehicle lighting equipment; --- Entertainment lighting control apparatus for professional use; --- Other devices built in a lighting fixture, such as. ● measurement or indicator lighting equipment; ● photocopier; ● Slide and projectors; ● multimedia devices. For those multifunction devices can work independently of other equipment lighting section shall comply with this standard electromagnetic immunity requirements. This standard is based on IEC 61000-6-1.2005 Indoor specified, the contents of commercial and industrial lighting requirements of the environment to develop, according to the photo Ming actual project was revised. Lighting equipment conforming to this standard in other environments should also be able to work satisfactorily. Measures must be taken in certain special circumstances to ensure Certified products and better noise immunity. This standard could not cover all possible environmental requirements, some special requests are subject to other suppliers and customers In row.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test (IEC 61000- 4-4.2004, IDT) GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test (IEC 61000-4-5. 2005, IDT) GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity Test (IEC 61000-4-11.2004, IDT) IEC 60050-161 Electrical term electromagnetic compatibility (InternationalElectrotechnicalVocabulary-Chapter161. ElectromagneticCompatibility) IEC 60050-845 Electrotechnical terminology Lighting (InternationalElectrotechnicalVocabulary-Chapter845. Light- ing) IEC 60598-1.2008 Luminaires - Part 1. General requirements and tests (Luminaires-Part 1. Generalrequirements andtests) IEC 60598-2-22 Luminaires - Part 2-22. Particular requirements for emergency lighting (Luminaires-Part 2-22. Particularrequirements-Luminairesforemergencylighting) IEC 61000-4-2.2008 Electromagnetic compatibility - Testing and measurement techniques - Electrostatic discharge immunity test [Electromagneticcom-

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 18595-2014_English be delivered?

Answer: Upon your order, we will start to translate GB/T 18595-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 18595-2014_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 18595-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 18595-2014?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 18595-2014 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.