US$299.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 11147-2010: Standard practice for sampling bituminous materials Status: Valid GB/T 11147: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 11147-2010 | English | 299 |
Add to Cart
|
3 days [Need to translate]
|
Standard practice for sampling bituminous materials
| Valid |
GB/T 11147-2010
|
GB/T 11147-1989 | English | 239 |
Add to Cart
|
2 days [Need to translate]
|
Asphalt--Sampling method
| Obsolete |
GB/T 11147-1989
|
PDF similar to GB/T 11147-2010
Basic data Standard ID | GB/T 11147-2010 (GB/T11147-2010) | Description (Translated English) | Standard practice for sampling bituminous materials | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | E43 | Classification of International Standard | 75.140 | Word Count Estimation | 13,183 | Date of Issue | 2011-01-10 | Date of Implementation | 2011-05-01 | Older Standard (superseded by this standard) | GB/T 11147-1989 | Quoted Standard | SH/T 0229 | Adopted Standard | ASTM D140-2001 (2007), MOD | Regulation (derived from) | National Standard Approval Announcement 2011 No.1 (Total No.166) | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the method for sampling all asphalt materials. This standard applies to all materials in the production of asphalt, storage place of delivery or sampling. |
GB/T 11147-2010: Standard practice for sampling bituminous materials---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Standard practice for sampling bituminous materials
ICS 75.140
E43
National Standards of People's Republic of China
Replacing GB/T 11147-1989
Asphalt sampling
Issued on. 2011-01-10
2011-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard replaces GB/T 11147-1989 "asphalt sampling method." Compared with GB/T 11147-1989 major technological changes
as follows.
--- The 1989 edition of the Chinese name "asphalt sampling method" to this standard "asphalt sampling."
--- The 1989 edition of the English name of Asphalt-Samplingmethod to this standard English name.
--- The 1989 edition of the scope of petroleum asphalt to this standard all bituminous material (see Chapter 1).
--- The amount of solid or semi-solid samples from the 1989 edition of this standard to 1 ~ 1.5kg of 1kg ~ 2kg (see 4.2).
--- 1989 edition of the liquid asphalt containing Sampler chapter contains emulsified asphalt, this standard is not included (see 5.1.1).
--- From the asphalt storage tank increases the sampling method and sampling valve at the bottom of the injector sampler method (see 6.1.1.1,6.1.1.2).
--- From tankers, tanker, asphalt distributor increases the sampling line sampling (see 6.2.2).
--- Extraordinary number of samples of a batch of products added to the sample batch can be clearly separated when (see 6.5.2.2).
--- Take pieces or powdered bitumen from barrels, bags, boxes total sample volume 1989 edition of 20kg, instead of the standard 25kg; for
Amount to inspection by 1 ~ 1.5kg to 1kg ~ 2kg (see 6.6. 1 6.6 2, 1989 edition 12.1, 12.2).
--- The standard sampling at the place of delivery of provisions to increase the "need each delivery must take the full amount of bitumen samples" and "sampling may
6.1 according to a predetermined sampling prior to discharge, it can also be in the middle third of the transport tank plus sampling valve or other sampling device
Sampling "two (see 6.7.2,6.7.3).
--- This standard adds "filled with sample containers can not be immersed in a solvent, nor can the solvent soaked cloth in Chapter 7,
If you must use a clean, dry cloth to wipe clean "(see 7.3) and" If the label is securely attached to the injector Sheng logo do to protect
Transfer certificate is not lost, the label can not be attached to the sample containing the lid. All materials should be identified stored at a temperature above 200 ℃
Intact "(see 7.6), and" For the asphalt sample with quality arbitration, the two sides sampling by supply and demand, both in sealed after sampling on
Signed and sealed. One for testing, a spare retention "(see 7.7) content.
This standard uses redrafted law revision by the United States Society for Testing and Materials standard ASTMD140-01 (2007 confirmation) "Asphalt
Material sampling method "(in English).
This standard ASTMD140-01 (2007 confirmed) compared to more adjustments in the structure, listed in Appendix A of this standard and
ASTMD140-01 (2007 confirmation) of the reg number control list.
This standard ASTMD140-01 (2007 confirmed) editorial compared amended as follows.
Remove all brackets non-SI units, retained SI units (see text).
This standard ASTMD140-01 (2007 confirmed) compared to the main technical changes are as follows.
--- This standard deleted ASTMD140-01 "2 cited documents" chapter references ASTMD346 "coke laboratory analysis
Charcoal and preparation of test method ", increasing the normative references SH/T 0229" solid and semi-solid petroleum bitumen product sampling
Law "(see Chapter 2). Modifications in order to meet our technical requirements.
--- This standard deleted ASTMD140-01 "3 meaning and application" and "4 Precautions" chapters, which together related content after modification
And put additional introductory part (see introduction). Our standard is not allowed in the drafting of the structure and meaning and application considerations
Two chapters, but its content and more important, is not eligible to be deleted, so the revised merger into the introduction.
"Protection and storage of 8 samples" --- ASTMD140-01 a chapter by placing before this standard sample to be placed in the sample
After (see Chapter 7). According to the order of modification work, more in line with the work program.
--- The standard delete ASTMD140-01 of 9.1.2Thief sampler, 9.1.3Throw-awayContainer sampler,
10.2Dip sampler, 2, 3, 4 and Note; increased bottom injector sampler method (see 6.1.1.2) and the upper injection take
Sampler method (see 6.1.1.3). ASTMD140-01 of 9.1.2Thief sampler, 9.1.3Throw-awayContainer
Sampler principle is reasonable, but there is no specific size and structure diagram, not easy to regulate, in accordance with its principles were so
Designed injector bottom sampler and an upper injector sampler. 10.2Dip sampler complex structure, narrow range in the country
No other application examples and sampler has been able to meet the sampling work, so there is no adoption. After the sampler map and cancel its corresponding
Note also canceled.
--- Quality arbitration increase when the test sampling operation (see 7.7). Mining Standards sampled for quality testing does not provide for arbitration,
But easily lead to disputes, to protect the interests of both supply and demand in favor of quality and inspection work, in particular to increase the entry.
--- Deleted the Chapter 17 keywords. In order to meet the requirements of the standard draft.
This standard by the National Standardization Technical Committee on Petroleum Products and Lubricants made.
This standard by the National Standardization Technical Committee lubricant oil asphalt petroleum products and the Technical Committee.
This standard was drafted. China Petroleum & Chemical Corporation Qilu Company Shengli Refinery.
The main drafters of this standard. Chang Yu Yan, Chen Heling, Yao Dehong.
Introduction
A large number of different types and grades of bituminous material alternately shipped, stored in the same container, these containers are likely to occur residue Shen
Sediments, cleaning solvents chance of contamination. Shihai sampling there are many instances can not be strictly representative of material properties or metastasis contaminated, and therefore
Requirements asphalt producers, transporters, and users must pay great attention to sampling during sampling and handling of these materials, to prevent sample contamination. should
Strictly in accordance with the present sampling sampling so that the sample can be obtained show the true nature and condition of the material, the material taken as much as possible on behalf of average
Performance, so as to effectively prevent disputes due to the quality of the sample causes.
Asphalt sampling
Warning. This standard does not involve safety regulations on use, if necessary, standard responsibility of the user prior to use to develop appropriate safety
Full protection measures.
1 Scope
This standard specifies the method for sampling all asphalt materials.
This standard applies to all bituminous material in the production, storage or sampling place of delivery.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member, undated references, the latest edition (including any amendments) applies to this document.
SH/T 0229 solid and semi-solid petroleum bitumen product sampling
3 Sample Selection
To check the quality of asphalt, pre-shipment in the factory or store sampled; when it is not stored or sampled in the production plant, in the place of delivery when
Sampling.
4 Sample Number
4.1 liquid asphalt sample size
4.1.1 routine test sample volume of 1L (emulsified asphalt 4L).
4.1.2 Samples were taken from the storage tank to 4L.
4.1.3 Sampling from the bucket to 1L.
4.2 a solid or semisolid sample size
Sample amount is 1kg ~ 2kg.
5 Sheng Sampler
Category 5.1 Sheng Sampler
5.1.1 liquid asphalt (not including emulsified asphalt) or semi-solid bitumen Sheng injector preferably having a wide-mouth closures for metal containers.
5.1.2 Emulsified Asphalt sampler containing preferably having a wide-mouth plastic container closures.
5.1.3 crushed asphalt or bitumen containing powder injector preferably having a wide-mouth closures for metal containers, you can also use a plastic bag, this bag should be
By packaging.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 11147-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 11147-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 11147-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 11147-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 11147-2010?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 11147-2010 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|