HOME   Cart(12)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

SH/T 3031-2013 English PDF

US$769.00 ยท In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
SH/T 3031-2013: Design specification for counterflow-type mechanical draught cooling tower structure in petrochemical industry
Status: Valid

SH/T 3031: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
SH/T 3031-2013English769 Add to Cart 6 days [Need to translate] Design specification for counterflow-type mechanical draught cooling tower structure in petrochemical industry Valid SH/T 3031-2013
SH 3031-1997EnglishRFQ ASK 9 days [Need to translate] Code for design of counterflow-type mechanical draught cooling tower structure for petrochemical enterprises Obsolete SH 3031-1997

PDF similar to SH/T 3031-2013


Standard similar to SH/T 3031-2013

SH/T 3164   SAMR 43   HG/T 20513   SH/T 3022   SH/T 3039   SH/T 3035   

Basic data

Standard ID SH/T 3031-2013 (SH/T3031-2013)
Description (Translated English) Design specification for counterflow-type mechanical draught cooling tower structure in petrochemical industry
Sector / Industry Petrochemical Industry Standard (Recommended)
Classification of Chinese Standard P72
Classification of International Standard 91.080.40
Word Count Estimation 31,318
Older Standard (superseded by this standard) SH 3031-1997
Quoted Standard GB 50007; GB 50009; GB 50010; GB 50011; GB 50017; GB 50046; GB 50102; GB 50153; GB 50453; SH/T 3132; SH/T 3147
Regulation (derived from) Ministry of Industry and Information Technology Bulletin No. 52 of 2013
Issuing agency(ies) Ministry of Industry and Information Technology
Summary This standard specifies the petrochemical counterflow mechanical draft cooling tower structures, structural analysis, structural and other requirements. This standard applies to petrochemical counterflow mechanical draft cooling tower structure design.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of SH/T 3031-2013_English be delivered?

Answer: Upon your order, we will start to translate SH/T 3031-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of SH/T 3031-2013_English with my colleagues?

Answer: Yes. The purchased PDF of SH/T 3031-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version SH/T 3031-2013?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version SH/T 3031-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.