QC/T 1208-2024 PDF English
US$470.00 · In stock · Download in 9 secondsQC/T 1208-2024: Hydrogen recirculation blower for fuel cell system Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
QC/T 1208-2024 | English | 470 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Hydrogen recirculation blower for fuel cell system
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: QC/T 1208-2024
QC/T 1208-2024: Hydrogen recirculation blower for fuel cell system---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/QCT1208-2024
QC
AUTOMOBILE INDUSTRY STANDARD
OF THE PEOPLE’S REPUBLIC OF CHINA
ICS 43.120
CCS T 47
Hydrogen recirculation blower for fuel cell system
ISSUED ON: JULY 19, 2024
IMPLEMENTED ON: JANUARY 01, 2025
Issued by: Ministry of Industry and Information Technology of the People's
Republic of China
Table of Contents
Foreword ... 4
1 Scope ... 5
2 Normative references ... 5
3 Terms and definitions ... 7
4 Equipment and instrument requirements ... 11
5 Working modes ... 11
5.1 Working mode 1 ... 11
5.2 Working mode 2 ... 11
6 Technical requirements ... 12
6.1 General items ... 12
6.2 Working characteristics and mechanical characteristics ... 12
6.3 Electrical characteristics ... 14
6.4 Environmental adaptability ... 16
6.5 Safety and prohibited substances ... 18
6.6 Durability ... 19
7 Test methods ... 20
7.1 Test conditions ... 20
7.2 Working characteristics and mechanical characteristics ... 21
7.3 Electrical characteristics ... 29
7.4 Environmental adaptability ... 31
7.5 Prohibited substances ... 34
7.6 Durability ... 34
8 Inspection ... 40
8.1 Inspection items ... 40
8.2 Type inspection ... 41
8.3 Factory-exit inspection... 41
8.4 Spot-check inspection ... 41
9 Marking, packaging, transportation and storage requirements ... 41
9.1 Marking ... 41
Hydrogen recirculation blower for fuel cell system
1 Scope
This document specifies the technical conditions, test methods, inspection rules and
marking, packaging, transportation and storage requirements for hydrogen recirculation
blowers for fuel cell systems (hereinafter referred to as hydrogen blowers).
This document applies to Roots-type hydrogen recirculation blowers for automotive
fuel cell systems, and other types of hydrogen recirculation blowers can use this as a
reference.
2 Normative references
The following referenced documents are indispensable for the application of this
document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
GB/T 755-2019 Rotating electrical machines - Rating and performance
GB/T 2408-2021 Plastics - Determination of burning characteristics - Horizontal and
vertical test
GB/T 2423.3-2016 Environmental testing - Part 2: Testing method - Test Cab: Damp
heat, steady state
GB/T 2423.4-2008 Environmental testing for electric and electronic products - Part
2: Test method - Test Db: Damp heat, cyclic (12 h + 12 h cycle)
GB/T 2423.18-2021 Environmental testing - Part 2: Test methods - Test Kb: Salt
mist, cyclic (sodium chloride solution)
GB/T 2423.22-2012 Environmental testing - Part 2: Test methods - Test N: Change
of temperature
GB/T 2423.56-2018 Environmental testing - Part 2: Test methods - Test Fh:
Vibration, broadband random and guidance
GB/T 3836.1-2021 Explosive atmospheres - Part 1: Equipment - General
requirements
GB/T 4208 Degrees of protection provide by enclosure (IP code)
provisions of the hydrogen blower product technical documents. According to the
working status of the hydrogen blower, it is divided into the following three working
modes:
a) Working mode 2.1, the hydrogen blower is not activated (such as sleep mode);
b) Working mode 2.2, the hydrogen blower operates at the minimum steady point;
c) Working mode 2.3, the hydrogen blower operates at the rated point.
6 Technical requirements
6.1 General items
6.1.1 Appearance
Visually inspect the appearance of the product. All appearance parts shall not have rust,
dents, or scratches on the surface; the coating shall not peel off; the fasteners shall be
firmly connected; the lead wires or terminals shall be intact; the color and marking shall
be correct; the handwriting and content of the nameplate shall be clear. The high-voltage
warning signs shall comply with the product technical documents.
6.1.2 Dimensions and mass
The dimensions and mass of hydrogen blowers shall comply with the product technical
documents.
6.2 Working characteristics and mechanical characteristics
6.2.1 Hydrogen blower performance
Test the performance of the hydrogen blower in accordance with the provisions of
7.2.1.3, and draw the working characteristics diagram shown in B.1 of Annex B. The
inlet flow, pressure rise, overall efficiency, pump volumetric efficiency, pump insulation
efficiency, etc. of the hydrogen blower shall comply with the product technical
documents.
Test the performance of the hydrogen blower at rated point in accordance with the
provisions of 7.2.1.4. The deviation rate of the rated inlet flow shall not exceed ±5 %.
6.2.2 Ice-breaking start-up
Test the ice-breaking start-up capability of the hydrogen blower in accordance with the
provisions of 7.2.2. The time of ice-breaking start-up of the hydrogen blower shall not
exceed 15 s.
6.2.3 Dynamic response
Test the dynamic response of the hydrogen blower in accordance with the provisions of
7.2.3. The load-up time of the hydrogen blower shall not exceed 3 s, and the load-down
time shall not exceed 2 s.
6.2.4 Start-up and shutdown response
Test the start-up and shutdown response of the hydrogen blower in accordance with the
provisions of 7.2.4. The start-up and shutdown response time of the hydrogen blower
shall not exceed 1 s.
6.2.5 Noise
Test the overall noise of the hydrogen blower in accordance with the provisions of 7.2.5.
The overall noise of the hydrogen blower shall meet the following requirements, or be
determined by consensus between the manufacturer and the user:
a) The noise value at the rated point and the dynamic response point specified in
6.2.3 shall not exceed 75 dB(A);
b) The noise value at the minimum steady point shall not exceed 70 dB(A).
6.2.6 Cooling water channel flow resistance characteristics
For the water-cooled parts of the hydrogen blower (such as hydrogen blower as a whole,
pump, motor or controller), the cooling water channel flow resistance shall be tested
separately in accordance with 7.2.6. The flow resistance of the cooling water channel
shall comply with the provisions of the product technical documents, and the deviation
rate of the flow resistance shall not exceed ±10 %.
6.2.7 Hydrogen gas circuit sealing
Test the hydrogen gas circuit sealing in accordance with 7.2.7. The leakage of the
hydrogen gas circuit shall not exceed 0.1 mL/min.
6.2.8 Cooling water channel sealing
For the water-cooled parts of the hydrogen blower (such as hydrogen blower as a whole,
pump, motor or controller), test the cooling water channel sealing in accordance with
7.2.8. The leakage of the cooling water channel shall not exceed 1 mL/min.
6.2.9 Hydrogen gas circuit cleanliness
Test the hydrogen gas circuit cleanliness of the hydrogen blower in accordance with
7.2.9. The hydrogen gas circuit cleanliness shall comply with the following provisions,
or be determined by consensus between the manufacturer and the user:
a) The total mass of metal particles with a diameter of 0 μm ~ 200 μm per square
meter of hydrogen circuit surface area shall not exceed 40 mg;
The high-voltage operating range of the hydrogen blower at full power shall comply
with the provisions of the product technical documents.
6.3.3 Insulation resistance
Test the insulation resistance of the motor and controller in accordance with 7.3.3.
The insulation resistance of the motor and controller shall comply with the provisions
of 5.1.4 in GB/T 18488-2024.
6.3.4 Withstand voltage
Test the withstand voltage of the motor and controller in accordance with 7.3.4.
The withstand voltage of the motor and controller shall comply with the provisions of
5.1.5 in GB/T 18488-2024.
6.3.5 Low-voltage input range
Test the low voltage in accordance with 7.3.5.
The low-voltage input range of the controller shall comply with the provisions of 4.2
code C or F in GB/T 28046.2-2019.
6.3.6 Safety grounding inspection
Inspect the grounding characteristics of the motor and controller in accordance with
7.3.6, which shall comply with the provisions of 5.3.1 of GB/T 18488-2024.
6.3.7 Controller protection function
Inspect the controller protection function in accordance with 7.3.7. The controller shall
have protection functions for overvoltage, undervoltage, overtemperature, overspeed
and communication interruption faults.
6.3.8 Controller support capacitor discharge time
Test the controller support capacitor discharge time in accordance with 7.3.8. The
passive discharge time shall not be greater than 5 min, and the active discharge time
shall not be greater than 3 s.
6.3.9 High-voltage cable
The high-voltage cable shall have a 360° shielding layer and a heat-resistant
temperature of not less than 150 ℃.
6.3.10 Electromagnetic compatibility
Test the electromagnetic compatibility of the hydrogen blower in accordance with 7.3.9,
which shall meet the following requirements:
a) For the tests of 7.3.9 a), b), c), and d), the limits of different frequency bands shall
comply with the provisions of the hydrogen blower manufacturer;
b) For the tests of 7.3.9 e), f), g), h), i), and j), the functional characteristics of the
hydrogen blower during and after the test shall comply with the provisions of the
manufacturer.
6.3.11 Rotational speed control accuracy
Test the rotational speed control accuracy of the hydrogen blower in accordance with
7.3.10, which shall be less than 100 r/min or 0.2 % of the maximum rotational speed
(whichever is greater).
6.4 Environmental adaptability
6.4.1 General inspection items
After all environmental adaptability tests are completed, the hydrogen blower is
restored to normal state and shall meet the following requirements:
a) Visually check that there are no cracks and damage on the outer surface of the
hydrogen blower, and the bolts are not loose;
b) The air cavity sealing complies with the provisions of 6.2.7;
c) The cooling water channel sealing complies with the provisions of 6.2.8;
d) The insulation resistance complies with the provisions of 6.3.3;
e) Visually check that there is no leakage of lubricating oil (if any) and coolant (if
any);
f) The hydrogen blower can operate stably at rated point for not less than 1 h;
g) Compared with before the start of the test, the rated flow deviation rate measured
in f) does not exceed 5 %.
6.4.2 Low-temperature storage
Carry out the low-temperature storage test in accordance with 7.4.1.
The insulation resistance re-measured in the chamber shall comply with the provisions
of 6.3.3.
After the test is completed, the hydrogen blower is restored to normal state and shall
comply with the provisions of 6.4.1.
Carry out the steady damp heat test in accordance with 7.4.7.
The hydrogen blower shall not have obvious deterioration of the external surface quality
and rust that affects normal operation.
After the test is completed, the hydrogen blower shall be restored to normal state and
shall comply with the provisions of 6.4.1.
6.4.9 Protection degree
Carry out the waterproof and dustproof test in accordance with 7.4.8.
The protection degree of the hydrogen blower shall meet the protection requirements
of IP67 or higher degree specified in GB/T 4208.
After the test is completed, the hydrogen blower shall be restored to normal state and
shall comply with the provisions of 6.4.1.
6.4.10 Salt spray test
Carry out the salt spray test in accordance with 7.4.9.
After the test is completed and the normal state is restored, the engraved mark shall be
clearly visible and comply with the provisions of 6.4.1.
6.4.11 Random vibration
Carry out the random vibration test in accordance with 7.4.10.
After the test is completed, the hydrogen blower shall be restored to normal state and
shall comply with the provisions of 6.4.1.
6.4.12 Mechanical shock
Carry out the mechanical shock test in accordance with 7.4.11.
After the test is completed, the hydrogen blower shall be restored to normal state and
shall comply with the provisions of 6.4.1.
6.5 Safety and prohibited substances
6.5.1 High-voltage safety
All high-voltage connectors shall have connection terminals for judging the high-
voltage interlocking function and shall meet the safety requirements of 5.1 in GB
18384-2020.
6.5.2 Combustion characteristics
The horizontal combustion performance and vertical combustion performance of the
exposed plastic parts in the hydrogen blower shall meet the HB level specified in 8.4
and the V-0 level specified in 9.4 of GB/T 2408-2021 respectively.
6.5.3 Explosion-proof safety
The non-metallic parts of the hydrogen blower enclosure shall comply with the
provisions of Clause 7 of GB/T 3836.1-2021 for Class IIC equipment, the metal parts
of the enclosure shall comply with the provisions of 8.3 of GB/T 3836.1-2021, and the
cable entry device of the hydrogen blower shall comply with the provisions of 16.3 of
GB/T 3836.1-2021. The hydrogen blower shall also comply with the manufacturer’s
other requirements for explosion-proof safety.
6.5.4 Prohibited substances
Test the prohibited substances in accordance with 7.5. Prohibited substances for
hydrogen blowers shall meet the requirements of GB/T 30512, and asbestos shall not
be detected.
6.6 Durability
6.6.1 Start-shutdown durability
Carry out the start-shutdown cycle durability test of the hydrogen blower in accordance
with 7.6.1.
After the test is completed, the hydrogen blower shall be restored to normal state and
shall comply with the provisions of 6.4.1. The total mass of impurities in the outlet filter
shall be less than 50 mg.
After the test, the components of the hydrogen blower shall be disassembled and
confirmed. There shall be no abnormal phenomena such as wear, breakage, deformation,
looseness, etc. that affect the function.
6.6.2 Temperature cycle durability
Carry out the temperature cycle durability test in accordance with 7.6.2.
After the test is completed, the hydrogen blower shall be restored to normal state and
shall comply with the provisions of 6.4.1. The total mass of impurities in the outlet filter
shall be less than 50 mg.
After the test, the components of the hydrogen blower shall be disassembled and
confirmed. There shall be no abnormal phenomena such as wear, breakage, deformation,
looseness, etc. that affect the function.
6.6.3 Variable load cycle durability
The performance of the hydrogen blower shall be carried out on a special test bench
that can adjust the working conditions and measure the corresponding parameters. The
test bench shall comply with the provisions of 7.1.
The test medium is hydrogen. According to working mode 2.3, set the inlet pressure
and inlet temperature of the hydrogen blower. The pressure deviation shall not exceed
±5 kPa, and the temperature deviation shall not exceed ±5 ℃.
7.2.1.2 Test preparation
Carry out test preparation as follows:
a) Install the hydrogen blower on the test bench, and the installation method shall
comply with the provisions of the product technical documents;
b) Set the coolant flow and temperature according to the requirements of the product
technical documents;
c) Use nitrogen to purge the gas circuit of the hydrogen blower;
d) Operate the hydrogen blower to working mode 2.3, check that there shall be no
gas leakage, liquid leakage, current leakage, etc. at each connection part, and there
shall be no abnormal sound during the operation of the hydrogen blower;
e) After the coolant temperature stabilizes, start the test.
7.2.1.3 Working characteristic diagram (map) test
Carry out the hydrogen blower working characteristic diagram test according to the
following steps:
a) Fix the hydrogen blower rotational speed, adjust the throttle opening so that the
hydrogen blower outlet pressure reaches the set value, and then record the data
specified in 7.1.5. During the test, the value of each measuring point shall be
stable for at least 3 min after the control parameter reaches the specified value.
Each point is measured 5 times, and the average value (or the average value within
1 min after stabilization) is taken when calculating;
b) Gradually change the valve opening, and the hydrogen blower outlet pressure
increases from small to large until the upper pressure limit is reached;
c) After completing one rotational speed line, continue to test the next rotational
speed line until the map is completed. The rotational speed line shall not be less
than 7 and include the minimum rotational speed and rated rotational speed, and
the rotational speed interval shall not be greater than 15 % of the maximum
rotational speed;
d) After the test is completed, turn off the hydrogen blower and the test bench.
7.2.1.4 Rated point performance test
Carry out the rated point performance test of the hydrogen blower according to the
following steps:
a) Fix the rotational speed of the hydrogen blower to the rated rotational speed, and
the deviation shall not exceed the provisions of 6.3.11;
b) Adjust the throttle so that the pressure rise is equal to the rated value, and the
deviation shall not exceed (-2 kPa, +2 kPa);
c) Make the hydrogen blower operate stably at the rated point for at least 10 min.
The inlet flow is the average value of 10 min of stable operation;
d) After the test is completed, turn off the hydrogen blower and the test bench.
7.2.1.5 Data processing
According to the parameters measured in the test, calculate the parameters such as
hydrogen blower inlet flow, pressure rise, controller input power, hydrogen blower
overall efficiency according to Annex A. Refer to Annex C for data collation, and refer
to Annex B for drawing the corresponding hydrogen blower working characteristic
diagram.
7.2.2 Ice-breaking start-up
It is allowed to use external heating and other methods included in the product range to
achieve ice-breaking start-up.
7.2.2.1 Test preparation
Carry out test preparation as follows:
a) Install the hydrogen blower on the test bench, and the installation method shall
comply with the provisions of the product technical documents;
b) Install a humidity sensor at the inlet of the hydrogen blower;
c) The external heating function within the product range can be turned on.
7.2.2.2 Test steps
Carry out the ice-breaking start-up test according to the following steps:
a) Start the hydrogen blower to working mode 2.3 (the inlet pressure, inlet
temperature, rotational speed, etc. of the hydrogen blower shall comply with the
provisions of working mode 2.3). Pass saturated wet steam into the hydrogen
blower inlet, observe the humidity at the hydrogen blower inlet; if the relative
e) Rapidly reduce the load of the hydrogen blower until it reaches the rotational
speed corresponding to working mode 2.2, and continuously record the
corresponding parameters of the hydrogen blower.
7.2.3.3 Data processing
Issue the start command according to 7.2.3.2 c), and the time it takes for the hydrogen
blower rotational speed to reach the set rotational speed is taken as the load-up time of
the hydrogen blower.
Issue the start command according to 7.2.3.2 e), and the time it takes for the hydrogen
blower rotational speed to reach the set rotational speed is taken as the load-down time
of the hydrogen blower.
NOTE: The calculation of dynamic response selects the difference between the time before the
rotational speed reaches stability after overshoot and the time when the command is issued.
7.2.4 Start-up and shutdown response
7.2.4.1 Test preparation
Carry out test preparation as follows:
a) Install the hydrogen blower on the test bench, and the installation method shall
comply with the provisions of the product technical documents;
b) Set the coolant flow and temperature according to the requirements of the product
technical documents.
7.2.4.2 Test steps
Carry out the start-up and shutdown response test according to the following steps:
a) After the coolant temperature stabilizes, the hydrogen blower is stabilized in
working mode 2.2 for 5 min, then the throttle opening is fixed and the blower is
shut down;
b) The test bench sends a start command to the hydrogen blower and loads it to
working mode 2.2, and continuously record the corresponding parameters of the
hydrogen blower;
c) After the hydrogen blower stabilizes in working mode 2.2, the test bench sends a
shutdown command to the hydrogen blower, and continuously record the
corresponding parameters of the hydrogen blower.
7.2.4.3 Data processing
The time from issuing the start command according to 7.2.4.2 b) to the hydrogen blower
reaching the set rotational speed is taken as the start-up time of the hydrogen blower.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of QC/T 1208-2024 be delivered?Answer: The full copy PDF of English version of QC/T 1208-2024 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of QC/T 1208-2024_English with my colleagues?Answer: Yes. The purchased PDF of QC/T 1208-2024_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- QC/T 1208-2024 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of QC/T 1208-2024?A step-by-step guide to download PDF of QC/T 1208-2024_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "QC/T 1208-2024". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|